Loading...
HomeMy WebLinkAbout10.17.2024 Board Correspondence - FW_ Compliance Directives issued in FERC P-1962-000,et al.From:Clerk of the Board To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie Cc:Nevers, Dawn Subject:Board Correspondence - FW: Compliance Directives issued in FERC P-1962-000,et al. Date:Thursday, October 17, 2024 12:37:47 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Thursday, October 17, 2024 5:05 AM Subject: Compliance Directives issued in FERC P-1962-000,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 10/16/2024, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-1962-000 P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Compliance Directives General Correspondence Description: Letter to Pacific Gas and Electric Company providing a comment on the 09/16 - 19/2024 Dam Safety Inspection of the Philbrook Main Dam, et al. under P-803; and Cresta Dam et al., parts of the Rock Creek-Cresta Hydroelectric Project under P-1962. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20241016- 3094__;!!KNMwiTCp4spf!Husc8dihOSLVIpqrYHXKg4vNcnaWqh0II_CxeU2elM1kv- eSwnNZPIlXdnZ7dNcmeFaMJHriO8OdJ0ldJVs22WgO9fUAzOfAxO5z$ To modify your subscriptions, click here: eSwnNZPIlXdnZ7dNcmeFaMJHriO8OdJ0ldJVs22WgO9fUAzK3KvnYC$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!Husc8dihOSLVIpqrYHXKg4vNcnaWqh0II_CxeU2elM1kv- eSwnNZPIlXdnZ7dNcmeFaMJHriO8OdJ0ldJVs22WgO9fUAzEt0phG3$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections – San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 (415) 369-3300 October 16, 2024 In reply refer to: Project Nos. 803 and 1962-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric Company 300 Lakeside Dr. Oakland, CA 94612-3534 Re: 2024 Dam Safety Inspection Follow-up Dear Mr. Cruzen: On September 16 – 19, 2024, Ms. Eunhye Kim inspected Philbrook Main Dam, Philbrook Saddle Dam, and Round Valley Dam, which are parts of DeSabla-Centerville Project, FERC No. 803, and Cresta Dam and Rock Creek Dam, which are parts of the Rock Creek-Cresta Hydroelectric Project, FERC No. 1962. Based on observations made and discussions held during the inspection, we have the following action item that requires your attention: • Determine if the observed 1.5-inch diameter and approximately 2.3-inch deep hole near the invert of the Phillbrook Main Dam flashboard spillway could cause concrete deterioration of the slab during spills. Within 45 days of the date of this letter, address the action item above or provide a plan and schedule to address the action item. File your submittal using our eFiling system at https://www.ferc.gov/ferc-online/overview. When eFiling, select Hydro: Dam Safety; San Francisco Regional Office from the eFiling menu. The cover page of the filing must indicate that the material was eFiled. For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). Document Accession #: 20241016-3094 Filed Date: 10/16/2024 2 We appreciate your continued efforts in this aspect of our dam safety program. If you have any questions, please contact Ms. Eunhye Kim at (415) 369-3321. Sincerely, (For) Frank L. Blackett, P.E. Regional Engineer cc: Ms. Sharon Tapia, Division Manager CA Dept. of Water Resources Division of Safety of Dams P.O. Box 942836 Sacramento, CA 94236-0001 Document Accession #: 20241016-3094 Filed Date: 10/16/2024 VINH TRAN Digitally signed by VINH TRAN Date: 2024.10.16 13:23:29 -07'00' Document Content(s) P-1962-000 P-803, S65082,83,89,93_FY24 DSI FollowUp.pdf...................1 Document Accession #: 20241016-3094 Filed Date: 10/16/2024