Loading...
HomeMy WebLinkAbout10.11.2024 Board Correspondence - FW_ Compliance Directives issued in FERC P-2088-000From:Clerk of the Board To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie Cc:Nevers, Dawn Subject:Board Correspondence - FW: Compliance Directives issued in FERC P-2088-000 Date:Friday, October 11, 2024 4:32:11 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, October 11, 2024 12:45 PM Subject: Compliance Directives issued in FERC P-2088-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 10/11/2024, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-2088-000 Lead Applicant: South Feather Water & Power Agency Filing Type: Compliance Directives General Correspondence Description: Letter to South Feather Water and Power Agency providing comments on the 09/05/2024 and 09/06/2024 Dam Safety Inspection of the South Feather Power Project under P-2088. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20241011- 3050__;!!KNMwiTCp4spf!Du7ymJqp-ZOnDs_GsxUIj3qDkfC- ObyBGiz1Anv7j5TKmnPA00_IWDv_SB2uqQYnAO62eupuB92sLy6--cCEEj4eUW_N4_i81bGi$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!Du7ymJqp- ZOnDs_GsxUIj3qDkfC-ObyBGiz1Anv7j5TKmnPA00_IWDv_SB2uqQYnAO62eupuB92sLy6-- cCEEj4eUW_N438z9CS9$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!Du7ymJqp- ZOnDs_GsxUIj3qDkfC-ObyBGiz1Anv7j5TKmnPA00_IWDv_SB2uqQYnAO62eupuB92sLy6-- cCEEj4eUW_N46yZJbCz$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections – San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 (415) 369-3300 October 11, 2024 In reply refer to: Project No. 2088-CA VIA FERC Service Mr. Rath Moseley General Manager South Feather Water and Power Agency 2310 Oro-Quincy Highway Oroville, CA 95965 Re: 2024 Dam Safety Inspection Follow-up Dear Mr. Moseley: On September 5 and 6, 2024, Mr. Ricardo Galdamez inspected the South Feather Power Project, FERC No. 2088. Based on observations made and discussions held during the inspection, we have the following action items that require your attention: 1. At both Little Grass Valley and Sly Creek spillways, concrete cracks from 1/8- inch to 1/2-inch in width are visible throughout the spillway surface. SFWPA should repair the cracks before the upcoming winter season to prevent further freeze-thaw deterioration. 2. Repair patches that appeared to be recently performed were noted on some of the spillways. As a reminder, you are required to coordinate all spillway repairs, in excess of basic crack sealing, with our office prior to performing any repairs. Any amount of saw cutting and/or removal of any concrete in order to place new material is not considered routine maintenance or repairs and must be coordinated with us. 3. At both Little Grass Valley and Sly Creek spillways, rocks continue to slide into the spillway from the adjacent rocky slopes. Repeated slides, including small rockslides, could result in a larger mass potentially sliding into the spillway resulting in severe damage and a non-performing spillway. Assess options for mitigating this rockfall risk at both spillways. Document Accession #: 20241011-3050 Filed Date: 10/11/2024 2 Within 30 days of this letter, provide responses to these items or submit a plan and schedule for doing so. File your submittal using our eFiling system at https://www.ferc.gov/ferc-online/overview. When eFiling, select Hydro: Dam Safety; San Francisco Regional Office from the eFiling menu. The cover page of the filing must indicate that the material was eFiled. For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). We appreciate your cooperation in this aspect of our dam safety program. If you have any questions, please contact Mr. Galdamez at (415) 369-3310. Sincerely, Frank L. Blackett, P.E. Regional Engineer cc: Ms. Sharon Tapia, Division Manager CA Dept. of Water Resources Division of Safety of Dams P.O. Box 942836 Sacramento, CA 94236-0001 Document Accession #: 20241011-3050 Filed Date: 10/11/2024 Frank L Blackett, P.E.Digitally signed by Frank L Blackett, P.E. Date: 2024.10.11 12:02:31 -07'00' Document Content(s) P-2088-000 S65053 Annual Inspection 2024 Follow-up.pdf....................1 Document Accession #: 20241011-3050 Filed Date: 10/11/2024