Loading...
HomeMy WebLinkAbout04.01.26 Board Correspondence - FW_ Project Operations Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Project Operations Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company Date:Wednesday, April 1, 2026 3:57:38 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Wednesday, April 1, 2026 2:16 PM Subject: Project Operations Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 4/1/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Project Operations Compliance Report Description: Pacific Gas and Electric Company submits response to address FERC's 02/17/2026 comment on the Hazard Tree Removal Plan re the Philbrook Dam of the DeSabla-Centerville Hydroelectric Project under P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist? accession_num=20260401-5436__;!!KNMwiTCp4spf!DylHEKLkc0OsKndsM- gHBShPSwC1qHPuNEAixOjrrTRPZf1VPUUUiOxKDxi13PefsvEDE5_ciWNT3f8Ux088GBwUD75Mnd29xbYF$ To modify your subscriptions, click here: gHBShPSwC1qHPuNEAixOjrrTRPZf1VPUUUiOxKDxi13PefsvEDE5_ciWNT3f8Ux088GBwUD75MnczkOBAO$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!DylHEKLkc0OsKndsM- gHBShPSwC1qHPuNEAixOjrrTRPZf1VPUUUiOxKDxi13PefsvEDE5_ciWNT3f8Ux088GBwUD75MnWRShWby$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 April 1, 2026 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA Philbrook Dam, NATDAM No. CA00345 Hazard Tree Removal Brief Report – Response to FERC Comment ENCLOSURES CONTAIN CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents Pacific Gas and Electric Company's (PG&E) response to address the Federal Energy Regulatory Commission’s (FERC) comment on the hazard tree removal plan for Philbrook Dam, which is part of PG&E’s DeSabla-Centerville Hydroelectric Project, FERC No. 803. PG&E received FERC’s comment in a letter dated February 17, 2026. PG&E originally provided FERC the Philbrook Dam tree removal plan in a letter dated September 4, 2025. For reference, the comment is copied below (in italics), followed by PG&E’s response. C-1: Your letter addressed our comments. Provide a brief report as stated in our authorization letter dated December 3, 2025 PG&E’s brief report summarizing the tree removal work completed at Philbrook Dam is enclosed with this letter (Enclosure 1). PG&E believes Comment 1 has been satisfactorily addressed based on the information enclosed with this letter and no further action is necessary. Should you have technical questions concerning this matter, please contact Isabelle Rawlings, senior dam safety engineer for PG&E, at (925) 359-5420. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure: CUI//CEII – DO NOT RELEASE 1. Philbrook Dam Hazard Tree Removal Project Brief Report, prepared by PG&E and dated March 2026 Document Accession #: 20260401-5436 Filed Date: 04/01/2026 Document Content(s) PGE20260401_803_Philbrook_HazardTreeRemoval_BR_Ltr.pdf....................1 Document Accession #: 20260401-5436 Filed Date: 04/01/2026