Loading...
HomeMy WebLinkAbout03.30.26 Board Correspondence - FW_ Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company Date:Monday, March 30, 2026 11:06:34 AM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Monday, March 30, 2026 6:46 AM Subject: Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 3/30/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Dam Safety Compliance Report Description: Pacific Gas and Electric Company submits combined 2025 Dam Safety Surveillance and Monitoring Report and Plan re the DeSabla Forebay Dam et al. of the DeSabla-Centerville Hydroelectric Project under P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260330- 5047__;!!KNMwiTCp4spf!Ft5TQbvRTK0Z2EAqhS_JbIWOouI1a4LMMSGPFaS3953IdIPMnZZiwbNZGHk50eF16ruLKB4T0fIcwG5CvK5hL6oO8CLCuytFI2Um$ To modify your subscriptions, click here: ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!Ft5TQbvRTK0Z2EAqhS_JbIWOouI1a4LMMSGPFaS3953IdIPMnZZiwbNZGHk50eF16ruLKB4T0fIcwG5CvK5hL6oO8CLCuzIVKoML$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 March 29, 2026 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA DSSMP/R Submittal for 2025 Record Year ENCLOSURE CONTAIN CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents Pacific Gas and Electric Company’s (PG&E) combined dam safety surveillance and monitoring plans and reports (DSSMP/Rs) (Enclosure 1) for the 2025 record year for the DeSabla-Centerville Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 803. The reports provided with this submittal cover surveillance and monitoring activities at the following dams: • DeSabla Forebay, NATDAM No. CA00343 • Philbrook Dam, NATDAM No. CA00345 • Round Valley Dam, NATDAM No. CA00346 In accordance with Chapter 14, Appendix K, of FERC’s Engineering Guidelines for the Evaluation of Hydropower Projects, the DSSMP/Rs include statements from PG&E’s Chief Dam Safety Engineer regarding the safety of the dams listed above for continued operation. PG&E typically begins preparing DSSMP/Rs about 6 months before they are due to FERC. To maintain PG&E’s schedule for coordinating and compiling the DSSMP/Rs and allow FERC’s comments to be incorporated in future reports, PG&E must receive timely feedback. To facilitate completion of PG&E’s DSSMP/Rs for the 2025 record year, PG&E respectfully requests that FERC return all comments on the 2025 DSSMP/Rs by September 30, 2026. Should you have technical questions concerning this matter, please contact Isabelle Rawlings, senior dam safety engineer for PG&E, at (925) 359-5420. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure: CUI//CEII – DO NOT RELEASE 1. DSSMP/Rs (3) Document Accession #: 20260330-5047 Filed Date: 03/30/2026 Document Content(s) PGE20260329_803_DeSablaC_2025_DSSMPR_Ltr.pdf..............................1 Document Accession #: 20260330-5047 Filed Date: 03/30/2026