HomeMy WebLinkAbout03.30.26 Board Correspondence - FW_ Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug;
Zepeda, Elizabeth
Cc:Loeser, Kamie; Cannon, Jamie
Subject:Board Correspondence - FW: Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company
Date:Monday, March 30, 2026 11:06:34 AM
Please see Board Correspondence -
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Monday, March 30, 2026 6:46 AM
Subject: Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 3/30/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company
Docket(s): P-803-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Dam Safety Compliance Report
Description: Pacific Gas and Electric Company submits combined 2025 Dam Safety Surveillance and Monitoring Report and Plan re the DeSabla Forebay Dam et al. of the DeSabla-Centerville Hydroelectric Project under P-803.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260330-
5047__;!!KNMwiTCp4spf!Ft5TQbvRTK0Z2EAqhS_JbIWOouI1a4LMMSGPFaS3953IdIPMnZZiwbNZGHk50eF16ruLKB4T0fIcwG5CvK5hL6oO8CLCuytFI2Um$
To modify your subscriptions, click here:
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!Ft5TQbvRTK0Z2EAqhS_JbIWOouI1a4LMMSGPFaS3953IdIPMnZZiwbNZGHk50eF16ruLKB4T0fIcwG5CvK5hL6oO8CLCuzIVKoML$
or for phone support, call 866-208-3676.
Power Generation
300 Lakeside Drive
Oakland, CA 94612
Mailing Address:
P.O. Box 28209
Oakland, CA 94604
March 29, 2026
Via Electronic Submittal (E-File)
Frank L. Blackett, P.E., Regional Engineer
Federal Energy Regulatory Commission
Division of Dam Safety and Inspections
100 First Street, Suite 2300
San Francisco, CA 94105-3084
RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA
DSSMP/R Submittal for 2025 Record Year
ENCLOSURE CONTAIN CUI//CEII – DO NOT RELEASE
Dear Frank L. Blackett:
This letter presents Pacific Gas and Electric Company’s (PG&E) combined dam safety surveillance
and monitoring plans and reports (DSSMP/Rs) (Enclosure 1) for the 2025 record year for the
DeSabla-Centerville Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 803.
The reports provided with this submittal cover surveillance and monitoring activities at the following
dams:
• DeSabla Forebay, NATDAM No. CA00343
• Philbrook Dam, NATDAM No. CA00345
• Round Valley Dam, NATDAM No. CA00346
In accordance with Chapter 14, Appendix K, of FERC’s Engineering Guidelines for the Evaluation of
Hydropower Projects, the DSSMP/Rs include statements from PG&E’s Chief Dam Safety Engineer
regarding the safety of the dams listed above for continued operation.
PG&E typically begins preparing DSSMP/Rs about 6 months before they are due to FERC. To
maintain PG&E’s schedule for coordinating and compiling the DSSMP/Rs and allow FERC’s
comments to be incorporated in future reports, PG&E must receive timely feedback. To facilitate
completion of PG&E’s DSSMP/Rs for the 2025 record year, PG&E respectfully requests that FERC
return all comments on the 2025 DSSMP/Rs by September 30, 2026.
Should you have technical questions concerning this matter, please contact Isabelle Rawlings, senior
dam safety engineer for PG&E, at (925) 359-5420. For general questions, please contact Andrew
Garcia, license coordinator for PG&E, at (530) 228-8990.
Sincerely,
Robert O. Ellis, P.E., G.E.
Deputy Chief Dam Safety Engineer
Enclosure: CUI//CEII – DO NOT RELEASE
1. DSSMP/Rs (3)
Document Accession #: 20260330-5047 Filed Date: 03/30/2026
Document Content(s)
PGE20260329_803_DeSablaC_2025_DSSMPR_Ltr.pdf..............................1
Document Accession #: 20260330-5047 Filed Date: 03/30/2026