Loading...
HomeMy WebLinkAbout03.27.26 Board Correspondence - FW_ Dam Safety Compliance Report submitted in FERC P-2088-000 byFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Dam Safety Compliance Report submitted in FERC P-2088-000 by Date:Friday, March 27, 2026 4:03:44 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, March 27, 2026 6:36 AM Subject: Dam Safety Compliance Report submitted in FERC P-2088-000 by .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 3/27/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: <Not available> Docket(s): P-2088-000 Lead Applicant: South Feather Water & Power Agency Filing Type: Dam Safety Compliance Report Description: South Feather Water and Power Agency submits 2025 Dam Safety Surveillance and Monitoring Report re the Little Grass Valley Dam et al. of the South Feather Power Project under P-2088. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260327- 5040__;!!KNMwiTCp4spf!HgjYyoWm2LV_6J4XWuLhzaDlIhroVG5VDaTV-cxM-hOROuhzNR4hj9q7Usu1Fuwg5qvgd1yaZsmkn- w7n0LdJuFMeRBjHK63g1ID$ To modify your subscriptions, click here: cxM-hOROuhzNR4hj9q7Usu1Fuwg5qvgd1yaZsmkn-w7n0LdJuFMeRBjHPP3yWFu$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!HgjYyoWm2LV_6J4XWuLhzaDlIhroVG5VDaTV-cxM- hOROuhzNR4hj9q7Usu1Fuwg5qvgd1yaZsmkn-w7n0LdJuFMeRBjHC3lDmZq$ or for phone support, call 866-208-3676. March 26, 2026 Frank L. Blackett, P.E., Regional Engineer Filed electronically Federal Energy Regulatory Commission San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105 RE: South Feather Power Project (SFPP/FERC No. 2088) Submittal of 2025 Calendar Year Dam Safety Surveillance and Monitoring Report Dear Mr. Blackett, This letter serves as the transmittal of the South Feather Water and Power Agency’s 2025 Calendar Year Dam Safety Surveillance and Monitoring Report (DSSMR) for your review and approval. The DSSMR includes reports based on routine field observations, instrumentation data collected by staff and surveying conducted by an independent consultant for the following SFPP dams: • Little Grass Valley (020880601) • Sly Creek (020880701) • Lost Creek (020880301) • Ponderosa (020880801) • Miners Ranch (020880101) If you have any questions related to this filing, please feel free to contact me at (530) 532-1348, or via email at kmckillop@southfeather.com. Sincerely, South Feather Water and Power Agency Attachments: CUI//CEII documents filed separately cc: Hunter Doyle, Power Division Manager Rath Moseley, General Manager Silas Sanderson, PE, Chief Dam Safety Engineer KRISTEN MCKILLOP REGULATORY COMPLIANCE MANAGER Document Accession #: 20260327-5040 Filed Date: 03/27/2026 Document Content(s) to FERC_03262025_CEII transmit calendar year 2025 DSSMR.pdf...............1 Document Accession #: 20260327-5040 Filed Date: 03/27/2026