Loading...
HomeMy WebLinkAbout04.14.26 Board Correspondence - FW_ General Correspondence issued in FERC P-619-000From:Clerk of the Board To:BOS Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: General Correspondence issued in FERC P-619-000 Date:Tuesday, April 14, 2026 4:56:14 PM Please see Board Correspondence - Lewis Lee Administrative Technician - Confidential Butte County Administration 25 County Center Drive, Suite 200 • Oroville, CA 95965 T: 530.552.3326 www.buttecounty.ca.gov | lelee@buttecounty.ca.gov -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Tuesday, April 14, 2026 10:06 AM Subject: General Correspondence issued in FERC P-619-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 4/14/2026, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: General Correspondence Description: Letter to Pacific Gas and Electric Company providing a comment on the 12/31/2025 response to FERC's comment to address Recommendation 1 etc. for the Grizzly Forebay Dam, part of the Bucks Creek Project under P-619. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260414- 3049__;!!KNMwiTCp4spf!GviTIvozSvgK2lBx3hYGdW1N_2xl9tzbpAEcaMm-cgADR9trjAPbKaf2rL9Z7l9dg0RLGiwIGtyv4o8qOKf6v- ZY19fHn-akcR6_$ To modify your subscriptions, click here: cgADR9trjAPbKaf2rL9Z7l9dg0RLGiwIGtyv4o8qOKf6v-ZY19fHn5LDydvE$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!GviTIvozSvgK2lBx3hYGdW1N_2xl9tzbpAEcaMm- cgADR9trjAPbKaf2rL9Z7l9dg0RLGiwIGtyv4o8qOKf6v-ZY19fHnxnpDn1w$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections –San Francisco Regional Office April 14, 2026 In reply refer to: Project No. 619-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric Company 300 Lakeside Dr. Oakland, CA 94612-3534 Re:Recommendation 1 of 2015 Part 12D Safety Inspection Report Dear Mr.Cruzen: This is in response to a letter dated December 31, 2025,from Mr. Robert Ellis that submitted a response to our comment to address Recommendation 1 (R-1) from the 2015 10th Part 12D safety inspection report, Your response indicated that you had also submitted a plan and schedule to address a similar Recommendation, R-4,from the 2025 12th Part 12D report. These recommendations are for the Grizzly Forebay Dam, which is part of the Bucks Creek Project, FERC No. 619. We have reviewed your submittal,and we have the following comment. Since R-1 from 2015 and R-4 from 2025 cover the same seepage area, we will provide a single response to both of these letters upon the completion of our review of your plan and schedule to address the 2025 recommendations. In the meantime, continue with the same surveillance and monitoring as is currently in place. File your submittal using our eFiling system at https://www.ferc.gov/ferc- online/overview. When eFiling, select Hydro: Dam Safety; San Francisco Regional Office from the eFiling menu. The cover page of the filing must indicate that the material was eFiled. For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). Document Accession #: 20260414-3049 Filed Date: 04/14/2026 2 We appreciate your cooperation in this aspect of our dam safety program. If you have questions,contact Ms. Eunhye Kim at (415)369-3321. Sincerely, Frank L. Blackett, P.E. Regional Engineer Document Accession #: 20260414-3049 Filed Date: 04/14/2026 Frank L Blackett Digitally signed by Frank L Blackett Date: 2026.04.14 08:59:52 -07'00' Document Content(s) P-619-000_106938_15R1_25R4_P12D_Grizzly.docx.pdf .........................1 Document Accession #: 20260414-3049 Filed Date: 04/14/2026