Loading...
HomeMy WebLinkAbout04.10.26 Board Correspondence - FW_ Progress Report submitted in FERC P-803-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Progress Report submitted in FERC P-803-000 by Pacific Gas and Electric Company Date:Friday, April 10, 2026 4:13:28 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, April 10, 2026 1:56 PM Subject: Progress Report submitted in FERC P-803-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 4/10/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Progress Report Description: Pacific Gas and Electric Company submits Final Construction Report for the weir modification project at the Philbrook Dam of the DeSabla-Centerville Hydroelectric Project under P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist? accession_num=20260410-5190__;!!KNMwiTCp4spf!CG23vA- To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!CG23vA- H9ucMQ6qcXh0mbkaRbFE_N4tzAYgWFZFdhZ2ZumPhm4GYLlKPZTXelI9MR5oej_g99FdoL_9lOIa1hYvNxjMOT5IbxP3i$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!CG23vA- H9ucMQ6qcXh0mbkaRbFE_N4tzAYgWFZFdhZ2ZumPhm4GYLlKPZTXelI9MR5oej_g99FdoL_9lOIa1hYvNxjMOT__A3vkn$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 April 10, 2026 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA Philbrook Dam, NATDAM No. CA00345 Weir Modification Project – Final Construction Report ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents Pacific Gas and Electric Company’s (PG&E) final construction report for the weir modification project at Philbrook Dam, which is part of PG&E’s DeSabla-Centerville Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 803. In a letter dated November 4, 2025, FERC authorized PG&E to proceed with the project and requested that PG&E file a final construction report for the project within 90 days of construction completion. The construction project was completed on November 24, 2025. PG&E requested an extension of time request for submission of the FCR in a letter dated February 23, 2026. (Enclosure 1) of this letter provides the final construction report, which includes the as-built drawings and construction certifications as appendices. Should you have technical questions concerning this matter, please contact Isabelle Rawlings, senior dam safety engineer for PG&E, at (925) 359 -5420. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Joe Landucci, P.E. Senior Manager, Power Generation Project Engineering Enclosure: CUI//CEII – DO NOT RELEASE 1. Philbrook Dam Weir 44A Wing Wall Installation, Final Construction Report, prepared by PG&E and dated April 2026 Document Accession #: 20260410-5190 Filed Date: 04/10/2026 Document Content(s) PGE20260410_803_Philbrook_WeirMod_Proj_FCR_Ltr.pdf........................1 Document Accession #: 20260410-5190 Filed Date: 04/10/2026