Loading...
HomeMy WebLinkAbout04.07.26 Board Correspondence - FW_ Delegated Order issued in FERC P-137-000,et al.From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Delegated Order issued in FERC P-137-000,et al. Date:Tuesday, April 7, 2026 3:58:51 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Tuesday, April 7, 2026 10:57 AM Subject: Delegated Order issued in FERC P-137-000,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 4/7/2026, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-137-000 P-233-000 P-619-000 P-1988-000 P-2105-000 P-2106-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Delegated Order Description: Letter to Pacific Gas and Electric Company granting the 03/26/2026 request for an extension of time to submit the Dam Safety Surveillance and Monitoring Plans/Reports for the Mokelumne River Project et al. under P-137 et al. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260407- 3056__;!!KNMwiTCp4spf!HvDLHeAoJm79MCIzRe3BthfEOwIAexWY1OtdKWLLDgrrevuFhawCV5DqMWqUpHQjUGun1a40BqYDqmocAGoTGBbCtso5KfZJxhtd$ To modify your subscriptions, click here: ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!HvDLHeAoJm79MCIzRe3BthfEOwIAexWY1OtdKWLLDgrrevuFhawCV5DqMWqUpHQjUGun1a40BqYDqmocAGoTGBbCtso5KR805xoZ$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections –San Francisco Regional Office April 7, 2026 In reply refer to: Project Nos. 137, 233, 619, 1988, 2105, and 2106-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric Company 300 Lakeside Dr. Oakland, CA 94612-3534 Re:Extension of Time for Dam Safety Surveillance and Monitoring Plans/Reports (DSSMPs/Rs) Dear Mr. Cruzen This is in response to a letter dated March 26, 2026 from Mr. Andrew Fisher that submitted a request for an extension of time to submit the DSSMPs/Rs for the 2025 record year,for the projects listed in Enclosure 1. We have reviewed your proposed extension of time and grant your request to submit DSSMPs/Rs by April 30, 2026. File your submittal using our eFiling system at https://www.ferc.gov/ferc- online/overview. When eFiling, select Hydro: Dam Safety; San Francisco Regional Office from the eFiling menu. The cover page of the filing must indicate that the material was eFiled. For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). We appreciate your continued efforts in this aspect of our dam safety program.If you have questions, contact our engineers listed in Enclosure 1 that are assigned to the specific projects. Our engineers’ phone numbers are listed in Enclosure 2. Sincerely, Frank L. Blackett, P.E. Regional Engineer Enclosures (2) 1.Projects and FERC Project Engineers 2.FERC Project Engineers’ Phone Numbers Document Accession #: 20260407-3056 Filed Date: 04/07/2026 Frank L Blackett Digitally signed by Frank L Blackett Date: 2026.04.07 09:58:44 -07'00' DSSMP/Rs to be Submitted Enclosure 1 Page 1 of 1 Table 1. Projects and Project Engineers Covered by the DSSMPs/Rs Project No.Project Name Engineer 137 Mokelumne River Vincent Vigil 233 Pit No. 3, 4, and 5 Fenggang Ma 619 Bucks Creek Eunhye Kim 1988 Haas-Kings River Samuel Lee 2105 Upper North Fork Feather River Eunhye Kim 2106 McCloud-Pit Fenggang Ma Document Accession #: 20260407-3056 Filed Date: 04/07/2026 FERC Project Engineers’ Phone Numbers for Enclosure 2 the Projects listed in Table 1 Page 1 of 1 Table 2. FERC Project Engineer Phone Numbers FERC Engineer Phone Number Eunhye Kim (415) 369-3321 Vincent Vigil (415) 369-3315 Fenggang Ma (415) 369-3319 Sa muel Lee (415) 369-3393 Document Accession #: 20260407-3056 Filed Date: 04/07/2026 Document Content(s) P-137-000 110779 137-233-1988-2105-6 DSSMR EOT.docx.pdf...................1 Document Accession #: 20260407-3056 Filed Date: 04/07/2026