HomeMy WebLinkAbout04.07.26 Board Correspondence - FW_ Delegated Order issued in FERC P-137-000,et al.From:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug;
Zepeda, Elizabeth
Cc:Loeser, Kamie; Cannon, Jamie
Subject:Board Correspondence - FW: Delegated Order issued in FERC P-137-000,et al.
Date:Tuesday, April 7, 2026 3:58:51 PM
Please see Board Correspondence -
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Tuesday, April 7, 2026 10:57 AM
Subject: Delegated Order issued in FERC P-137-000,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 4/7/2026, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document:
Docket(s): P-137-000
P-233-000
P-619-000
P-1988-000
P-2105-000
P-2106-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Delegated Order
Description: Letter to Pacific Gas and Electric Company granting the 03/26/2026 request for an extension of time to submit the Dam Safety Surveillance and Monitoring Plans/Reports for the Mokelumne River Project et al. under P-137 et
al.
To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260407-
3056__;!!KNMwiTCp4spf!HvDLHeAoJm79MCIzRe3BthfEOwIAexWY1OtdKWLLDgrrevuFhawCV5DqMWqUpHQjUGun1a40BqYDqmocAGoTGBbCtso5KfZJxhtd$
To modify your subscriptions, click here:
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!HvDLHeAoJm79MCIzRe3BthfEOwIAexWY1OtdKWLLDgrrevuFhawCV5DqMWqUpHQjUGun1a40BqYDqmocAGoTGBbCtso5KR805xoZ$
or for phone support, call 866-208-3676.
Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov
FEDERAL ENERGY REGULATORY COMMISSION
Office of Energy Projects
Division of Dam Safety and Inspections –San Francisco Regional Office
April 7, 2026
In reply refer to:
Project Nos. 137, 233, 619,
1988, 2105, and 2106-CA
VIA FERC Service
Mr. Russell Cruzen, P.E., Director
Power Generation, Asset Excellence
Pacific Gas and Electric Company
300 Lakeside Dr.
Oakland, CA 94612-3534
Re:Extension of Time for Dam Safety Surveillance and Monitoring Plans/Reports
(DSSMPs/Rs)
Dear Mr. Cruzen
This is in response to a letter dated March 26, 2026 from Mr. Andrew Fisher that
submitted a request for an extension of time to submit the DSSMPs/Rs for the 2025
record year,for the projects listed in Enclosure 1. We have reviewed your proposed
extension of time and grant your request to submit DSSMPs/Rs by April 30, 2026.
File your submittal using our eFiling system at https://www.ferc.gov/ferc-
online/overview. When eFiling, select Hydro: Dam Safety; San Francisco Regional
Office from the eFiling menu. The cover page of the filing must indicate that the
material was eFiled. For assistance with eFiling, contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY).
We appreciate your continued efforts in this aspect of our dam safety program.If
you have questions, contact our engineers listed in Enclosure 1 that are assigned to the
specific projects. Our engineers’ phone numbers are listed in Enclosure 2.
Sincerely,
Frank L. Blackett, P.E.
Regional Engineer
Enclosures (2)
1.Projects and FERC Project Engineers
2.FERC Project Engineers’ Phone Numbers
Document Accession #: 20260407-3056 Filed Date: 04/07/2026
Frank L Blackett Digitally signed by Frank L Blackett
Date: 2026.04.07 09:58:44 -07'00'
DSSMP/Rs to be Submitted Enclosure 1
Page 1 of 1
Table 1. Projects and Project Engineers Covered by the
DSSMPs/Rs
Project No.Project Name Engineer
137 Mokelumne River Vincent Vigil
233 Pit No. 3, 4, and 5 Fenggang Ma
619 Bucks Creek Eunhye Kim
1988 Haas-Kings River Samuel Lee
2105
Upper North Fork Feather
River
Eunhye Kim
2106 McCloud-Pit Fenggang Ma
Document Accession #: 20260407-3056 Filed Date: 04/07/2026
FERC Project Engineers’ Phone Numbers for Enclosure 2
the Projects listed in Table 1
Page 1 of 1
Table 2. FERC Project Engineer Phone Numbers
FERC Engineer Phone Number
Eunhye Kim (415) 369-3321
Vincent Vigil (415) 369-3315
Fenggang Ma (415) 369-3319
Sa muel Lee (415) 369-3393
Document Accession #: 20260407-3056 Filed Date: 04/07/2026
Document Content(s)
P-137-000 110779 137-233-1988-2105-6 DSSMR EOT.docx.pdf...................1
Document Accession #: 20260407-3056 Filed Date: 04/07/2026