Loading...
HomeMy WebLinkAbout04.02.26 Board Correspondence - FW_ Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company Date:Thursday, April 2, 2026 4:15:48 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Thursday, April 2, 2026 11:36 AM Subject: Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 4/2/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Dam Safety Compliance Report Description: Pacific Gas and Electric Company submits response to address FERC's 03/04/2026 Comment 1 on Action Item 3 from the 2025 Dam Safety Inspection re the Philbrook Dam, part of the DeSabla-Centerville Hydroelectric Project under P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260402- 5151__;!!KNMwiTCp4spf!A9yWAmSDng_xYSfPMtxCdXYIpwXkeOUoT9sMAX0MSU0KbL8lz_M6RySfgKfXY5DXRJhPEnSDiev-viZpPvSMQR0jw9UUvDgUcvox$ To modify your subscriptions, click here: viZpPvSMQR0jw9UUvLH2bW6A$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!A9yWAmSDng_xYSfPMtxCdXYIpwXkeOUoT9sMAX0MSU0KbL8lz_M6RySfgKfXY5DXRJhPEnSDiev- viZpPvSMQR0jw9UUvFIOS-4t$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 April 2, 2026 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA Philbrook Dam, NATDAM No. CA00345 2025 Annual FERC Inspection Responses to FERC Comment 1 ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents Pacific Gas and Electric Company's (PG&E) response to address the Federal Energy Regulatory Commission’s (FERC) comment 1 (C-1) on Action Item 3 (I-3) from the 2025 annual Federal Energy Regulatory Commission (FERC) dam safety inspection for Philbrook Dam, which is part of PG&E’s DeSabla-Centerville Hydroelectric Project, FERC No. 803. PG&E received FERC’s comments in a letter dated March 4, 2026. PG&E's response to C-1 is enclosed with this letter (Enclosure 1). Should you have technical questions concerning this matter, please contact Isabelle Rawlings, senior dam safety engineer for PG&E, at (925) 359 -5420. For general questions, please contact Jackie Pope, senior license coordinator for PG&E, at (530) 254-4007. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure: CUI//CEII – DO NOT RELEASE 1. Responses to FERC Comments Regarding Response to Comment 1 Regarding 2025 Annual Dam Safety Inspection Document Accession #: 20260402-5151 Filed Date: 04/02/2026 Document Content(s) PGE20260402_803_Philbrook_2025DSI_ResptoCmnt_Ltr.pdf......................1 Document Accession #: 20260402-5151 Filed Date: 04/02/2026