HomeMy WebLinkAbout002-110-007 EH-WP-25-000005 Chico Bike Park Well No. 2 Destruction - work descripChico Bike Park - Well No. 2 Destruction
Description of Work
Per Contractor (Besser):
WELL
5 ft dimeter 18 ft deep
• Tremie bentonite chips into well 1 ft deep minimum
• Pump water in well out if possible
• Fill well with two sack sand slurry to 7 ft below grade
• On-site contractor to dig out and excavate well to 7 ft below grade after well work is
complete