Loading...
HomeMy WebLinkAbout002-110-007 EH-WP-25-000005 Chico Bike Park Well No. 2 Destruction - work descripChico Bike Park - Well No. 2 Destruction Description of Work Per Contractor (Besser): WELL 5 ft dimeter 18 ft deep • Tremie bentonite chips into well 1 ft deep minimum • Pump water in well out if possible • Fill well with two sack sand slurry to 7 ft below grade • On-site contractor to dig out and excavate well to 7 ft below grade after well work is complete