HomeMy WebLinkAbout10.23.24 Board Correspondence - FW_ Dam Safety Compliance Report submitted in FERC P-619-000,et al. by Pacific Gas and Electric Company,et al.From:Clerk of the Board To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie Cc:Nevers, Dawn Subject:Board Correspondence - FW: Dam Safety Compliance Report submitted in FERC P-619-000,et al. by Pacific Gas and Electric Company,et al. Date:Wednesday, October 23, 2024 4:36:06 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Wednesday, October 23, 2024 5:35 AM Subject: Dam Safety Compliance Report submitted in FERC P-619-000,et al. by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 10/23/2024, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Pacific Gas & Electric Company (as Agent) Docket(s): P-619-000 P-1962-001 P-2105-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Dam Safety Compliance Report Description: Pacific Gas and Electric Company submits revised Quality Control Inspection Program re the Bucks Creek 1102 Circuit Fire Rebuild Project of the Bucks Creek Hydroelectric Project, et al. under P-619, et al. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20241023- 5010__;!!KNMwiTCp4spf!GlsXLOhwUa4BBrSVMXUEwlunZJEHO1FIb27TYt31ehpOS5n7YUzSIQOUxhh9XFfLYBwzLIhE_YU22NhYjc5fh3YmcfpfPo59XYuu$ To modify your subscriptions, click here: 0$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!GlsXLOhwUa4BBrSVMXUEwlunZJEHO1FIb27TYt31ehpOS5n7YUzSIQOUxhh9XFfLYBwzLIhE_YU22NhYjc5fh3YmcfpfPhCRbT4q$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 October 22, 2024 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA Rock Creek-Cresta Hydroelectric Project, FERC No. 1962-CA Upper North Fork Feather River Hydroelectric Project, FERC No. 2105-CA Bucks Creek 1102 Circuit Fire Rebuild Project Revised Quality Control and Inspection Program Dear Frank L. Blackett: This letter presents Pacific Gas and Electric Company’s (PG&E) revised Quality Control and Inspection Program (QCIP) for the Bucks Creek 1102 Circuit Fire Rebuild Project (Project), parts of which will be adjacent to Bucks Creek Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619-CA; the Rock Creek-Cresta Hydroelectric Project, FERC No. 1962-CA; and the Upper North Fork Feather River Hydroelectric Project, FERC No. 2105-CA. PG&E received FERC’s conditional authorization to proceed with the Project in a letter dated July 25th, 2023. The revised QCIP includes the following updates: • Added Ryan Dutillieul and Alex Phillips as field inspectors The revised QCIP is enclosed with this letter as (Enclosure 1). Should you have technical questions concerning this matter, please contact Chris Tomes, dam safety engineer for PG&E, at (818) 584-9944. For general questions, please contact Chadwick McCready, license coordinator for PG&E, at (530) 685-5710. Sincerely, Chadwick McCready Senior License Coordinator, Hydro License Compliance Enclosure: 1. Quality Control Inspection Program, Revision 6, prepared by PG&E and dated October 21, 2024 Document Accession #: 20241023-5010 Filed Date: 10/23/2024 ENCLOSURE 1 Document Accession #: 20241023-5010 Filed Date: 10/23/2024 PREPARED BY: Michael Shaeffer, P.M. POWER GENERATION DEPARTMENT REVIEWED BY: David Mowry, P.E. APPROVED BY: Kaitlyn Daniels DATE: October 2024 Internal BUCKS CREEK 1102 FIRE REBUILD Bucks Creek Hydroelectric Project, FERC No. 619-CA Rock Creek-Cresta Hydroelectric Project, FERC No. 1962-CA Upper North Fork Feather River Hydroelectric Project, FERC No. 2105-CA QUALITY CONTROL INSPECTION PROGRAM REVISION 6 Document Accession #: 20241023-5010 Filed Date: 10/23/2024 Bucks Creek 1102 Fire Rebuild Project, FERC No. 619, 1962, 2105 Quality Control Inspection Program QUALITY CONTROL INSPECTION PROGRAM REVISION LOG Revision Revised Item Date Prepared By 1 Initial issue of QCIP document 05/10/2023 Michael Shaeffer 2 Add inspector Destaneigh Moore 09/20/2023 Michael Shaeffer 3 Change Quality Control Manager to Larry McKee and add Field Inspectors Cory Banker and Graham McCulloch 4/19/2024 Michael Shaeffer 4 Add Geosciences Engineer Mutaz Mihyar 6/24/2024 Michael Shaeffer 5 Add Geosciences Engineers Brandon Bretts, Enrico Rufini, Casey Phradichith and Hugo Velasquez 7/18/24 Michael Shaeffer 6 Add inspectors Ryan Dutillieul and Alex Phillips 10/21/24 Michael Shaeffer Document Accession #: 20241023-5010 Filed Date: 10/23/2024 Bucks Creek 1102 Fire Rebuild Project, FERC No. 619, 1962, 2105 Quality Control Inspection Program TABLE OF CONTENTS PAGE 1. INTRODUCTION .................................................................................................. 1 1.1 Purpose .................................................................................................... 1 1.2 Background .............................................................................................. 1 1.3 Description of Structures and Types of Construction .......................... 1 1.4 Specialized Construction Techniques and Equipment ........................ 3 2. ORGANIZATION AND STAFFING RESPONSIBILITIES .................................... 3 2.1 Responsibilities of Various Organizations ............................................ 3 2.1.1 Licensee ....................................................................................... 3 2.1.2 Designer ....................................................................................... 3 2.1.3 Quality Control Inspection Organization ....................................... 4 2.1.4 Constructor ................................................................................... 4 2.1.5 Regulator ...................................................................................... 4 2.2 Number of Staff and Availability Required ............................................ 4 2.3 Titles, Duties and Responsibilities of Staff ........................................... 4 2.3.1 QC Manager ................................................................................. 5 2.3.2 Field Inspector .............................................................................. 5 2.3.3 Engineering Manager ................................................................... 6 2.3.4 Engineer of Record ...................................................................... 6 2.3.5 Dam Safety Engineer ................................................................... 7 2.3.6 Project Manager ........................................................................... 7 2.3.7 License Compliance Lead ............................................................ 7 2.3.8 Environmental Lead ..................................................................... 8 2.4 Specialty Inspectors ................................................................................ 8 2.5 Lines of Communication and Authority ................................................. 8 2.6 Approval and Rejection of Work ............................................................ 8 2.7 Authority to Stop Work ............................................................................ 9 2.8 Statement of Independence .................................................................... 9 2.9 Resumes ................................................................................................... 9 3. INSPECTION PLAN AND FIELD PRACTICES ................................................... 9 3.1 Inspection Criteria ................................................................................... 9 3.2 Knowledge of Construction Plans and Specifications ....................... 10 3.3 Inspection Equipment and Resources ................................................. 10 3.4 Constructor Operations ........................................................................ 10 3.5 Coordination with Constructor’s Schedule ......................................... 10 Document Accession #: 20241023-5010 Filed Date: 10/23/2024 Bucks Creek 1102 Fire Rebuild Project, FERC No. 619, 1962, 2105 Quality Control Inspection Program 3.6 QCIP Operations .................................................................................... 10 3.7 Frequency of Inspections ..................................................................... 11 3.8 Documentation and Follow-up Action ................................................. 11 3.9 Training ................................................................................................... 11 4. DOCUMENTATION ............................................................................................ 11 4.1 Daily Inspection Reports ....................................................................... 11 4.2 Nonconformance Reports ..................................................................... 12 4.3 Other Periodic Reports .......................................................................... 13 4.4 Maintenance of Records ....................................................................... 13 4.5 Photographs/Videos .............................................................................. 14 5. TRAINING .......................................................................................................... 14 5.1 Study Materials ...................................................................................... 14 5.2 Classroom Instruction ........................................................................... 14 5.3 On-the-Job Training and Supervision .................................................. 14 5.4 Proficiency Testing and Certification ................................................... 14 5.5 Resume Update ...................................................................................... 14 6. MATERIAL TESTING ........................................................................................ 14 6.1 Testing Schedule ................................................................................... 14 6.2 Testing Standards.................................................................................. 15 6.3 Testing Organization ............................................................................. 15 6.4 Adequacy of On-Site Laboratory .......................................................... 15 6.5 Adequacy of Off-Site Laboratory .......................................................... 15 6.6 Evaluation of Testing Data and Actions Required .............................. 15 6.7 Documentation ....................................................................................... 15 7. EROSION CONTROL AND ENVIRONMENTAL COMPLIANCE ...................... 15 7.1 Environmental Compliance Plan .......................................................... 15 7.2 Erosion and Sediment Control Plan ..................................................... 16 7.3 License Requirements........................................................................... 16 7.4 Specialized Plans, Permits, and Approvals ......................................... 16 7.5 Frequency of Inspections ..................................................................... 16 7.6 Documentation and Corrective Actions ............................................... 16 7.7 Environmental Deficiency Report ........................................................ 16 8. SCHEDULE ........................................................................................................ 17 8.1 Start and Finish Dates ........................................................................... 17 8.2 Anticipated Construction Sequence .................................................... 17 Document Accession #: 20241023-5010 Filed Date: 10/23/2024 Bucks Creek 1102 Fire Rebuild Project, FERC No. 619, 1962, 2105 Quality Control Inspection Program 8.3 Staged and Phased Construction ........................................................ 18 9. PLANNED USE OF CONSULTANTS ................................................................ 18 9.1 Areas of Inspection and Review .......................................................... .18 9.2 Consultants Names and Resumes ...................................................... .18 APPENDICES A. QCIP Organization Chart B. Resumes for QCIP Personnel with Stop-Work Authority C. Reference List of Project-Related Documents D. Inspection and Hold Point Checklist E. Material and Field-Testing Requirements F. QCIP Reporting Templates Document Accession #: 20241023-5010 Filed Date: 10/23/2024 Bucks Creek 1102 Fire Rebuild Project, FERC No. 619, 1962, 2105 Quality Control Inspection Program 1 1. INTRODUCTION 1.1 Purpose This quality control inspection program (QCIP) is regarding Pacific Gas & Electric Company’s (PG&E) project (the project) to underground Bucks Creek 1102 21 kV Line along State Highway Route 70 corridor in Plumas County between post mile 4.98 - 18.85. Portions of the project fall within the following FERC project boundaries: PG&E’s Bucks Creek Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619 Rock Creek-Cresta Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 1962 Upper North Fork Feather River Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 2105. The purpose of this QCIP is to ensure the quality construction of this project. This QCIP has been prepared in support of FERC requirements to submit a construction authorization package for portions of the project which fall within the limits of FERC hydroelectric project boundaries. This QCIP only pertains to the approximately 1.28 miles of work within FERC boundaries for P- 619, P-1962, and P-2105 as detailed in the attached drawings and exhibits. The project manager (PM) and Engineer of Record (EOR) are accountable for development of the QCIP for this project. This QCIP has been prepared in compliance with the following Federal Energy Regulatory Commission (FERC) requirements and guidelines: • Title 18, Chapter I, Sub-Chapter B, Part 12, Subpart E, Section 12.50 of the Code of Federal Regulations • FERC’s Engineering Guidelines for the Evaluation of Hydropower Projects, Chapter VII, “Construction Quality Control Inspection Program” 1.2 Background In coordination with Caltrans, PG&E will be undergrounding portions of the Bucks Creek 1102 21 kV Line. These power lines were damaged due to the recent 2021 Dixie Fire. The PG&E Wildfire System Hardening Program is part of the overall PG&E Community Wildfire Safety Program intended to reduce the risk of future wildfire ignitions in the Tier 2 and 3 High Fire District by performing targeted undergrounding of overhead lines. 1.3 Description of Structures and Types of Construction The project crosses three FERC license areas, Bucks Creek, Rock Creek-Cresta, and Upper North Fork Feather. The following describes the proposed work in each area. Bucks Creek The project alignment exits the Bucks Creek Powerhouse underground on to SR 70 and continues in north and south directions. It extends 905 feet south down SR 70 to connect Document Accession #: 20241023-5010 Filed Date: 10/23/2024 Bucks Creek 1102 Fire Rebuild Project, FERC No. 619, 1962, 2105 Quality Control Inspection Program 2 with existing underground facilities and extends 110 feet north to the limit of the FERC boundary. A number of underground facilities will be installed including three #7 boxes, one #6 box and one #1 box. 52 feet of underground conductor will be removed, and 87 feet will be replaced on the Bucks Creek Powerhouse facility. PG&E proposes to reconductor 77 feet of overhead alignment and remove 619 feet of existing overhead conductor, including the span that crosses the Feather River. Four poles will be removed, three poles will be replaced, and one inter set pole will be installed within the Bucks Creek Powerhouse facility. Rock Creek-Cresta The project alignment continues north on SR 70 and intersects the Rock Creek-Cresta License area in multiple sections. Underground alignment will be installed in the following sections of SR 70: • 123 feet between PM 6.2 and 6.3 • 93 feet between PM 7.5 and 7.6 • 99 feet between PM 8.8 and 8.9 • 350 feet between PM 12 and 12.1 • 160 feet between 13.5 and 13.6 • 0.25 miles between PM 13.6 and 14 • 82 feet between PM 14.9 and 15 Associated underground facilities will also be installed, including one #5 box and four #7 boxes. Additionally, the alignment runs adjacent to Rock Creek Dam, where approximately 200 feet of conduit, a pad mounted transformer, and a #2 box will be installed adjacent to the highway near Rock Creek Dam. Upper North Fork Feather The project alignment continues North on SR 70 and interests the Upper North Fork Feather License area near the PG&E Belden Powerhouse. Approximately 1,770 feet of alignment and two # 7 boxes, will be installed between 14.7 and 15.1. Additional alignment will be installed adjacent to the Belden Powerhouse along with a #7 box, a #5 box, a pad mounted junction and a pad mounted transformer. To underground these facilities, PG&E will use a combination of trenching and boring along the midline of SR 70. In accordance with Caltrans’ request, PG&E will bore underneath all culverts and drainages that intersect with the path; no open trenching or replacement will take place at culvert locations. The standard trench depth will be at least 42 inches below ground and average 24 inches in width. PG&E estimates the maximum depth of the trench will be approximately 110 inches below ground. The underground pipe will be approximately three to six inches in diameter. Document Accession #: 20241023-5010 Filed Date: 10/23/2024 Bucks Creek 1102 Fire Rebuild Project, FERC No. 619, 1962, 2105 Quality Control Inspection Program 3 All work areas will be accessed from SR 70, established driveways, or disturbed areas along SR 70 or private property. Specific staging areas are currently being established by the team. Construction equipment may include one or more excavator, backhoe, front-end loader, boring machine, dump truck, vacuum truck, road sweeper, water truck, air compressor, rock saw, drum roller, compactor, paving machine, crew trucks, line/bucket trucks, flatbed trucks, light tower, and miscellaneous hand tools. 1.4 Specialized Construction Techniques and Equipment Horizontal Directional Drilling (HDD) with an All-Terrain HDD machine with air hammer attachment. Open trench excavation with rock trencher and/or rock wheel. 2. ORGANIZATION AND STAFFING RESPONSIBILITIES 2.1 Responsibilities of Various Organizations The responsibilities of various organizations involved with the construction of this project are described in the following sections. 2.1.1 Licensee PG&E is the owner and licensee of this FERC-licensed hydroelectric project. PG&E is responsible for implementing quality control (QC) on this project to confirm that construction is performed in a safe manner and complies with the FERC license conditions, agency permits, environmental requirements, drawings, and specifications. PG&E manages the constructor’s scope of work and monitors and enforces the constructor’s compliance with the contract terms and conditions. PG&E is responsible for interaction with all regulatory and resource agencies and the public during construction. PG&E has the responsibility and the authority to stop work in progress or reject any work that, in PG&E’s view, does not comply with the drawings, specifications, applicable codes, or regulations or is potentially damaging to the environment. 2.1.2 Designer The designer is responsible for providing a design that is safe, and meets the project criteria and operational, performance, environmental, and regulatory requirements. The designer is responsible for the design and preparation of drawings and specifications, technical assistance, design verification during construction, preparation of design changes, and preparation of as- built drawings. The designer will provide appropriate field inspections and reviews during Document Accession #: 20241023-5010 Filed Date: 10/23/2024 Bucks Creek 1102 Fire Rebuild Project, FERC No. 619, 1962, 2105 Quality Control Inspection Program 4 construction to ensure that the final completed project will meet the design intent. The designer will designate one individual to act as the engineer of record (EOR) for the project. 2.1.3 Quality Control Inspection Organization PG&E’s inspection organization is responsible for field inspection and testing on this project, and will provide independent inspection and testing in accordance with the inspection requirements in the drawings and specifications and special inspection instructions when directed by the EOR. The inspection organization will also provide and/or coordinate all field and material testing required by the drawings, specifications, or as directed by the EOR. The inspection organization will coordinate all on-site and off-site laboratory testing required by this project. 2.1.4 Constructor The constructor for this project is MGE Underground. The constructor is responsible for furnishing all materials, labor, and equipment necessary to construct the project in accordance with the project drawings, specifications, and contract documents. The constructor does not have a role and/or responsibility to perform the QC tasks described in this QCIP. 2.1.5 Regulator FERC establishes the regulations, license requirements, and guidelines that govern the development of this QCIP. FERC does not perform the QC tasks described in this QCIP. FERC may perform inspections during construction, independent of this QCIP, to verify that good construction practices are being followed. 2.2 Number of Staff and Availability Required The number of staff assigned to implement this QCIP are shown in Appendix A, “QCIP Organization Chart.” The on-site availability of QCIP personnel is shown in the table below. QCIP Role Onsite Availability QC Manager As required Field Inspector Full time PG&E Geosciences Engineer As required EOR Periodically and as required Dam safety engineer (DSE) Periodically and as required Environmental Lead Periodically and as required 2.3 Titles, Duties and Responsibilities of Staff Document Accession #: 20241023-5010 Filed Date: 10/23/2024 Bucks Creek 1102 Fire Rebuild Project, FERC No. 619, 1962, 2105 Quality Control Inspection Program 5 The organization chart in Appendix A identifies the QCIP personnel involved in this project. The responsibilities of QCIP personnel assigned to this project are described below. 2.3.1 QC Manager Responsibilities: The QC manger is responsible for assigning independent, qualified field inspectors; special inspectors; and testing laboratories/facilities to the project. The QC manager provides high-level coordination for resolution of nonconformance and environmental deficiency issues. At the end of the project the QC manager provides a Certification of Construction attesting that the results from the inspection and testing program result in the conclusion that the project was constructed in accordance with the plans and specifications. Lines of Communication: Has direct reporting relationship to PG&E’s manager of Hydro Inspections and direct communication with the field inspector, project manager (PM), EOR, license compliance lead, and environmental lead. Authorities: Has the authority stop work because of adverse quality conditions. The QC manager has the authority to assign or replace field inspectors, with FERC authorization, based on the scope of work and in accordance with the project drawings, specifications, this QCIP, and specific inspection instructions directed by the EOR. 2.3.2 Field Inspector Responsibilities: The field inspector: • performs and/or coordinates inspection and testing according to this QCIP; • provides independent inspection and testing during construction in accordance with the inspection requirements in the drawings, specifications, this QCIP, and specific inspection instructions when directed by the EOR; • may perform environmental inspections in accordance with the Environmental Release to Construction (ERTC) and under the direction of the environmental lead; • immediately notifies the license compliance and/or environmental lead of potential regulatory nonconformance or environmental deficiency issues; • immediately notifies the license compliance and/or environmental lead of inspections performed by regulatory agencies; • provides documentation of tests and reports with all discrepancies identified; • provides field markups for preparation of as-built drawings; • notifies the QC manager of any stop-work or recommendation to stop work resulting from an adverse quality condition; • may issue nonconformance reports and environmental deficiency reports in coordination with the appropriate lead or subject matter expert; and • if a specialty inspector is required as part of the project (e.g., certified welding inspector), confirms the individual has the proper qualifications before beginning the Document Accession #: 20241023-5010 Filed Date: 10/23/2024 Bucks Creek 1102 Fire Rebuild Project, FERC No. 619, 1962, 2105 Quality Control Inspection Program 6 specialty inspection. The field inspector role may be filled PG&E personnel, or a consultant retained to act on behalf of PG&E. Lines of Communication: Has direct reporting relationship to the QC manager and direct communications with the EOR, PM, environmental lead, license compliance lead, and the constructor. The field inspector provides inspection and test reports to the EOR, and PM. Authorities: Has the independent, on-site authority to stop work for activities that are noncompliant with the design drawings or specifications, noncompliant with the regulatory or permit conditions, or damaging to the environment. The field inspector has authority to approve and reject the constructor’s work. The field inspector reports identified nonconformance or environmental deficiency to the constructor, EOR, PM, license compliance lead, or environmental lead, as applicable. 2.3.3 Engineering Manager Responsibilities: The engineering manager is responsible for assigning a qualified RE and/or EOR for design and technical oversight of the project. The engineering manager acts on behalf of PG&E as the licensee. At the end of the project the engineering manager provides a Certification of Construction attesting that the construction fulfills the design intent and was constructed in accordance with the plans and specifications reviewed by FERC. Lines of Communication: Has direct reporting relationship to PG&E’s director of power generation engineering. Has direct communication with the RE, EOR and QC manager. Authorities: The engineering manager has the authority to assign the RE and EOR based on the scope of work for this project. 2.3.4 Engineer of Record Responsibilities: The EOR: • provides engineering design drawings and specifications for the project components in accordance with the project design requirements and acceptable industry, regulatory, and professional standards; • provides oversight and engineering support during construction to confirm that the completed project is in accordance with the design intent; • reports identified situations that are noncompliant with the design drawings and specifications to the PM and field inspector for action; • reviews inspection reports and material testing reports; • approves design and field changes; • manages resolution of engineering issues that may arise during construction, including design changes and identified construction deficiencies or nonconformance; Document Accession #: 20241023-5010 Filed Date: 10/23/2024 Bucks Creek 1102 Fire Rebuild Project, FERC No. 619, 1962, 2105 Quality Control Inspection Program 7 • in conjunction with the Dam Safety Engineer (DSE) or subject matter expert (SME), coordinates with FERC and the California Department of Water Resources, Division of Safety of Dams (DSOD), on engineering issues and changes; and • coordinates activities with other departments regarding engineering, geotechnical, and design issues. At the end of the project the EOR provides a Certification of Construction attesting that the construction was in accordance with the design intent. Lines of Communication: Has direct communication with the field inspectors and PM on matters associated with QC. Authorities: The EOR: • has the sole authority, pending FERC authorization, to issue the original approved-for- construction drawings and specifications, minor field changes that deviate from the approved design drawings, and major design changes caused by changed field conditions; • has the authority to approve and reject the constructor’s work; and • has the authority to stop work for activities that are noncompliant with the design drawings or specifications. 2.3.5 Dam Safety Engineer Responsibilities: The DSE reviews and accepts the EOR’s and other consultants’ project engineering and design. The DSE, in conjunction with the EOR, also coordinates with FERC and DSOD on project submittals, engineering issues, and design changes. Lines of Communication: Has direct reporting relationship to the deputy chief dam safety Engineer. Has interactive communications with the EOR, PM, and regulatory agency representatives. Authorities: Accepts the EOR’s engineering design, specifications, and design changes for submittal to FERC and DSOD. The DSE has the authority stop work for activities that are noncompliant with the design drawings and specifications, noncompliant with the regulatory or permit conditions, or damaging to the environment. 2.3.6 Project Manager Responsibilities: The PM manages the project scope, construction contract, cost estimate, management approval, cost monitoring, and status reporting associated with the project. The project manager is responsible for constructor negotiations and scheduling of construction. Document Accession #: 20241023-5010 Filed Date: 10/23/2024 Bucks Creek 1102 Fire Rebuild Project, FERC No. 619, 1962, 2105 Quality Control Inspection Program 8 Lines of Communication: Has direct reporting relationship to PG&E’s project management supervisor and manager of project management. Has direct communication with the EOR, quality control manager, license compliance lead, environmental lead, and constructor. Authorities: The PM has the authority to approve or reject work and coordinate all project activities. 2.3.7 License Compliance Lead Responsibilities: The license compliance lead informs the QCIP team of FERC license and/or regulatory agency conditions. In coordination with the environmental lead, may serve as liaison with regulatory agency representatives. Works with the environmental lead to acquire and summarize necessary regulatory permits for construction activities and communicate with agencies regarding nonconformance or deviations. Lines of Communication: Has direct reporting relationship to the licensing supervisor. Has interactive communications with the environmental lead, PM, EOR, and regulatory agency representatives. Authorities: Has the authority to advise the PM on matters of environmental compliance. Has the authority to recommend stop-work based on an actual or potential adverse license condition. 2.3.8 Environmental Lead Responsibilities: The environmental lead: • manages PG&E’s environmental compliance process; • with on-site support by the field inspector, confirms construction activities follow the ERTC and resource agency permit conditions; • performs periodic inspections and involves environmental SMEs as needed; • obtains and manages contracts for environmental monitors and other environmental support, as needed; • provides guidance for field inspection and monitoring to confirm that the construction activities follow the environmental requirements and that adequate measures are implemented to minimize any potential environmental impacts, may perform the monitoring; • assists the field inspector in issuing environmental deficiency reports; and • in conjunction with the license compliance lead, communicates with agencies regarding nonconformance or deviations. Lines of Communication: Has direct reporting relationship to the environmental manager and interactive communications with the field inspector, license compliance lead, PM, and EOR. Document Accession #: 20241023-5010 Filed Date: 10/23/2024 Bucks Creek 1102 Fire Rebuild Project, FERC No. 619, 1962, 2105 Quality Control Inspection Program 9 Authorities: Has the authority to advise the PM on matters of license compliance. Has the authority to recommend stop-work based on an actual or potential adverse environmental condition. 2.4 Specialty Inspectors A PG&E Geosciences Engineer will be present for monitoring during any project excavation, backfilling, and compaction activities being performed within 200 feet of the dam and/or powerhouse. The PM or EOR will coordinate these inspections. The PG&E Geosciences Engineers are included in the Appendix A organization chart and their resumes are included in Appendix B. 2.5 Lines of Communication and Authority The lines of communication and authority for each role are described in Section 2.3 of this QCIP. Section 2.7 lists personnel who have authority to stop work because of adverse quality, environmental, or license conditions. 2.6 Approval and Rejection of Work PG&E’s field inspector has the on-site authority to approve and reject work. The EOR has the authority to approve or reject work. The field inspector communicates directly with the EOR for situations where the drawings or specifications do not appear to be appropriate for the conditions encountered or where rejection of work is under consideration or has been decided. The PM has the authority to approve or reject work in accordance with the contract documents. 2.7 Authority to Stop Work The following QCIP personnel have authority to stop work due to adverse quality, environmental or license conditions: • QC manger, • Field inspector, • EOR, and • DSE / SME The following personnel have authority to recommend stop work to the EOR or field inspector because of adverse environmental or license conditions: • License compliance lead and • Environmental lead. As part of PG&E’s commitment to safety, all project personnel have the authority to stop work because of an unsafe or potentially unsafe condition or work practice. Document Accession #: 20241023-5010 Filed Date: 10/23/2024 Bucks Creek 1102 Fire Rebuild Project, FERC No. 619, 1962, 2105 Quality Control Inspection Program 10 2.8 Statement of Independence PG&E implements this QCIP with personnel independent from personnel responsible for construction. The organization chart in Appendix A delineates the independent relationship between the constructor and the QC inspection personnel. 2.9 Resumes Resumes for QCIP personnel authorized to stop work or recommend stop-work are provided in Appendix B. 3. INSPECTION PLAN AND FIELD PRACTICES The purpose of this section is to provide guidance for implementation of this QCIP and to describe the inspection, reporting, and documentation procedures to be used for the project. 3.1 Inspection Criteria PG&E will perform inspection of this project according to the criteria defined in the approved- for-construction design drawings, project specifications, and this QCIP. Environmental compliance criteria are specified in the ERTC, project-specific permits, license conditions, and resource agency agreements. The relevant documents are referenced in Appendix C, “Reference List of Project-Related Documents.” The project-specific inspection checklist is included in Appendix D, “Inspection and Hold Point Checklist,” and the material and field-testing checklist is included in Appendix E, “Material and Field-Testing Requirements.” The project specifications, design drawings, and this QCIP may be revised as necessary during construction to reflect field changes and requirements from resource and regulatory agencies. Any proposed revisions to the drawings or specifications must be coordinated with the regulatory agencies and may require additional regulatory authorization. All construction work and field inspections will be performed in accordance with the latest approved revisions to the project design and construction documents. 3.2 Knowledge of Construction Plans and Specifications The QCIP team will have a complete understanding and knowledge of the specifications, design drawings, and environmental compliance requirements. The EOR and the RE are responsible for ensuring that the field inspector is familiar with the specifications, design drawings, and the inspection requirements for the project. 3.3 Inspection Equipment and Resources The staffing plan and materials testing laboratory used to support this QCIP are shown in organization chart in Appendix A. An on-site laboratory will be used for material testing on the project. The material testing is described in greater detail in Section 6 of this QCIP. Document Accession #: 20241023-5010 Filed Date: 10/23/2024 Bucks Creek 1102 Fire Rebuild Project, FERC No. 619, 1962, 2105 Quality Control Inspection Program 11 3.4 Constructor Operations The constructor will operate independently from QCIP personnel and is responsible for safely constructing a quality project. The constructor is responsible for their own methods, schedule, and phasing, within the limitations of the contract, where applicable. PG&E’s field inspector will inspect and verify the constructor’s work and has the authority to stop work because of nonconformance or deficiency. The constructor will be informed of personnel, as outlined in Section 2.7 of this QCIP, that have the authority to stop work because of nonconformance or deficiency. 3.5 Coordination with Constructor’s Schedule The field inspector will coordinate schedules with the constructor to confirm all testing and inspections take place as required by the approved-for-construction drawings, specifications, and this QCIP. 3.6 QCIP Operations The field inspector is responsible for performing and/or coordinating the inspection and testing requirements of this QCIP to validate and confirm compliance with the project specifications, design drawings, and environmental requirements. When deficiencies are identified, the inspector should take the actions shown in the table below. Type of Deficiency Identified Inspector Actions Construction quality or nonconformance Report the findings immediately to the EOR, the constructor, and the PM for follow-up actions Environmental Report the finding immediately to the license compliance lead and the environmental lead Nonconformance issues that can be resolved in the field Coordinate with the constructor to enforce immediate corrective actions Nonconformance that requires further technical review and evaluation Seek input from the EOR to develop the appropriate corrective actions QCIP personnel, as defined in Section 2.7, have the authority to stop work, at any time, if the non-compliant condition presents a safety risk, or, if its continuation would cause a deficiency to the project or potential damage to the environment. 3.7 Frequency of Inspections The frequency of inspections and testing is described in Appendix D, “Inspection and Hold Point Checklist,” and Appendix E, “Material and Field-Testing Requirements.” 3.8 Documentation and Follow-up Action Document Accession #: 20241023-5010 Filed Date: 10/23/2024 Bucks Creek 1102 Fire Rebuild Project, FERC No. 619, 1962, 2105 Quality Control Inspection Program 12 Procedures for reporting, producing documentation, and following up with action for QCIP- related reports are described in Section 4 of this QCIP. Report templates are provided in Appendix F. “QCIP Reporting Templates.” 3.9 Training A training program is not required for this project. 4. DOCUMENTATION The purpose of QCIP reporting is to document the observation, investigation, testing, and analysis of inspection work. This section describes the proposed QCIP-related reporting for this project. 4.1 Daily Inspection Reports The field inspector will use the daily inspection report to document construction activity each day. A sample report is provided in Appendix F, “QCIP Reporting Templates.” The report will contain the following information: • date • all relevant activities of the field inspector and constructor for the reporting day • pertinent conversations with the constructor and instructions given to constructor • inspections, acceptances, and rejections • factual comments within field inspector’s area of responsibility • detailed record of work performed by the constructor • problems (e.g., relating to installation, design, equipment, damages, claims, quality) • details of labor, equipment usage, and standby equipment hours • weather conditions • work delays, reasons, and remedial actions • change order information • safety observations or infractions brought to the constructor’s attention • details (e.g., quantities, clearances) recorded or observed by field inspector • field inspector’s name and signature • photographs (i.e., construction progress photos) The EOR and PM will review the daily inspection reports and follow-up with the field inspector for any clarification or further information needed. 4.2 Nonconformance Reports If a nonconformance with the specification, design drawings, or license conditions is identified, that work activity will be stopped and the following reporting, documentation, and follow-up process will be followed: Document Accession #: 20241023-5010 Filed Date: 10/23/2024 Bucks Creek 1102 Fire Rebuild Project, FERC No. 619, 1962, 2105 Quality Control Inspection Program 13 • Initiation: The field inspector will immediately notify the RE, EOR, and constructor of the nonconformance condition related to construction quality. If the nonconformance is related to a license condition the license compliance lead should also be notified immediately. • Coordination, Review, and Distribution: Nonconformance Type Actions Issue that can be resolved in the field Field inspector coordinates with the constructor to enforce immediate corrective actions Issue that requires further technical review and evaluation • Field inspector will, within 1 calendar day, complete the initial portion of the nonconformance report (NCR) by documenting the location, date, and description of the discrepancy and submit a copy of the report to the constructor, EOR, license compliance lead, DSE or SME, and PM • EOR will develop the corrective action in coordination with the constructor, PM, Quality Control Manager, license compliance lead, and the appropriate regulatory agencies. • If applicable, the license compliance lead, EOR, and DSE or SME, will obtain the appropriate agency approvals for the corrective action. • Follow-up and Resolution: Upon approval and authorization of the corrective action, the field inspector will coordinate with the constructor to enforce and manage implementation of the corrective action. The field inspector will monitor and inspect construction of the corrective action to confirm that the nonconformance condition is corrected. • Tracking: Upon the field inspector’s acceptance of the corrected construction the field inspector will complete the corrective measure section of the NCR with a description of the corrective measures taken and the date of completion of the corrective measures. The field inspector, and EOR will sign and date the completed report as of the date the correction was accepted. Construction activities that were stopped because of the nonconformance will resume after the NCR is completed and signed. 4.3 Other Periodic Reports The environmental deficiency report is described in Section 7 of this QCIP. Document Accession #: 20241023-5010 Filed Date: 10/23/2024 Bucks Creek 1102 Fire Rebuild Project, FERC No. 619, 1962, 2105 Quality Control Inspection Program 14 Additional reporting required as part of the regulatory authorization for this project are listed below: • Final construction report (FCR) 4.4 Maintenance of Records The original copies of QCIP-related documentation will be filed in the project electronic files. The field inspector will keep copies of all QCIP-related reports at the project field office. QCIP- related reports will be distributed to project personnel as described below. • Daily Inspection Report: PM and EOR • Inspection and Hold Point Checklist: PM and EOR • Material Test Report: field inspector, EOR, PM, and constructor • NCR: field inspector, PM, EOR, DSE/SME, QC manager, constructor, and license compliance lead • Environmental Deficiency Report (EDR): field inspector, PM, environmental lead, constructor, and license compliance lead 4.5 Photographs/Videos The field inspector and other project staff will document the construction progress with photographs. Photographs are also included as part of the Daily Inspection Report. Photograph and video records will be stored on PG&E’s project record file after completion of the project. 5. TRAINING Team members assigned to the project are trained and qualified in their areas of expertise. Field inspectors have experience with similar work and have the appropriate certifications necessary to inspect the project. Where special inspections and/or testing is called out, the field inspector will confirm that the specialty inspector has the proper certifications necessary to perform the work. 5.1 Study Materials Not applicable 5.2 Classroom Instruction Not applicable 5.3 On-the-Job Training and Supervision Document Accession #: 20241023-5010 Filed Date: 10/23/2024 Bucks Creek 1102 Fire Rebuild Project, FERC No. 619, 1962, 2105 Quality Control Inspection Program 15 The EOR are responsible for providing project specific QCIP awareness training for the field inspectors and engineering staff assigned to be on-site. All on-site QCIP personnel will have full knowledge and understanding of the design drawings, specifications, and this QCIP. The environmental lead will provide training on the environmental requirements (ERTC) for the project. 5.4 Proficiency Testing and Certification Not applicable 5.5 Resume Update If personnel with stop-work authority on the project changes, Appendix A and B of this QCIP will be updated and resubmitted to FERC for review and authorization. 6. MATERIAL TESTING The approved-for-construction drawings and specifications establish testing requirements for the project and the standards and codes to which the work will conform. The QCIP team will use the specified tests to verify that the work is performed in accordance with these documents. 6.1 Testing Schedule Appendix E summarizes the project testing schedule that specifies the type and number of tests required to validate and confirm that all work elements comply to the specified standards. 6.2 Testing Standards Appendix E summarizes the test method, standard, and/or code that is specified in the project drawings and specifications. 6.3 Testing Organization TBD 6.4 Adequacy of On-Site Laboratory The following field tests will be performed in accordance with the applicable ASTM and Caltrans standards. Standard Test Description ASTM D1557 Standard Test Methods for Laboratory Compaction Characteristics of Soil Document Accession #: 20241023-5010 Filed Date: 10/23/2024 Bucks Creek 1102 Fire Rebuild Project, FERC No. 619, 1962, 2105 Quality Control Inspection Program 16 6.5 Adequacy of Off-Site Laboratory Not applicable. 6.6 Evaluation of Testing Data and Actions Required The EOR and RE will review and evaluate all material test results. If the results of material testing indicate nonconformance with specified requirements the constructor may be directed to remove and replace substandard materials. 6.7 Documentation Material test documentation and any necessary follow-up action will be retained in the project files as outlined in Section 4 of this QCIP. 7. EROSION CONTROL AND ENVIRONMENTAL COMPLIANCE 7.1 Environmental Compliance Plan Project-specific environmental permits and compliance requirements will be specified in the ERTC. The ERTC was developed for the scope of work defined in the construction drawings. The field inspector and environmental lead are responsible for confirming compliance with the environmental requirements during construction. 7.2 Erosion and Sediment Control Plan The constructor will follow the Storm Water Pollution Prevention Plan (SWPPP) developed specifically for the project. The project is a result of the Dixie Fire and PG&E has obtained a SWPPP that covers all the projects as part of the Dixie Fire rebuild effort, so this project will be covered by WDID # 5R32C396520. 7.3 License Requirements Not applicable. 7.4 Specialized Plans, Permits, and Approvals The following approvals and authorizations are required prior to the start of construction: • FERC authorization is required for project construction. • Caltrans Encroachment permit obtained. • Authorization received by the Plumas National Forest Service. Document Accession #: 20241023-5010 Filed Date: 10/23/2024 Bucks Creek 1102 Fire Rebuild Project, FERC No. 619, 1962, 2105 Quality Control Inspection Program 17 7.5 Frequency of Inspections The frequency of environmental inspections by the field inspectors and the environmental lead will be specified in SWPPP. Also, inspections will also occur to ensure the crew is properly follow the ESA avoidance areas that are called out in the drawings and are in proper condition in the field. 7.6 Documentation and Corrective Actions The field inspector will document inspection observations and assessments of environmental conditions as described in Sections 3, 4, and 7.7 of this QCIP. Corrective actions necessary to remedy environmental nonconformance will be implemented as described in Section 7.7 below. 7.7 Environmental Deficiency Report If an environmental nonconformance condition is identified, the field inspector or environmental lead will complete an EDR. Documentation and corrective actions will be accomplished in accordance with Sections 3 and 4 of this QCIP. If a nonconformance with the environmental requirement is identified, the following process will be followed: • Initiation: If an environmental nonconformance is identified by the field inspector they will immediately notify the PM. The PM will then immediately coordinate with the environmental and/or license compliance lead to determine the course of action for mitigations and timely external reporting requirements. • Coordination and Distribution: The field inspector or the environmental lead will complete the EDR within 1 calendar day noting the location, date, and description of the nonconformance. The field inspector or the environmental lead will submit a copy of the EDR to the constructor, RE, EOR, license compliance lead, PM, and environmental lead and/or field inspector. If a major deficiency results in impacts to the environment, the field inspector or the environmental lead will stop the construction activity, and, if immediate action is required to mitigate ongoing impacts, contact the PM and constructor to initiate such effort. Consistent with PG&E’s Power Generation Department’s incident reporting procedures, the license compliance or environmental lead will immediately report the environmental deficiency to the appropriate regulatory, resource, and permit agency representative(s). • Follow-up and Resolution: The constructor will prepare a plan of measures for review and acceptance by the field inspector and environmental lead. Corrective measures will be implemented upon approval by the field inspector environmental lead, and, if necessary, the regulatory agency representative(s). The environmental lead and the field Document Accession #: 20241023-5010 Filed Date: 10/23/2024 Bucks Creek 1102 Fire Rebuild Project, FERC No. 619, 1962, 2105 Quality Control Inspection Program 18 inspector will inspect the corrected construction for compliance with environmental requirements. • Tracking: If the completed corrective measure is acceptable, the field inspector and the environmental lead will sign and date the EDR with the date the correction was accepted. Construction will resume (if it was necessary to halt work) after the EDR is completed and signed. The license compliance or environmental lead will advise the regulatory agency representative(s) of the corrective action and provide necessary documentation. 8. SCHEDULE 8.1 Start and Finish Dates Proposed Start Date: July 31, 2023 Proposed Finish Date: December 31, 2025 8.2 Anticipated Construction Sequence The preliminary construction sequence and schedule is provided in the table below. The LC will be notified of any adjustments to the scheduled start or finish construction dates and these changes will be communicated to FERC. # Activity Description Schedule 1 Trench, install, & backfill UG facilities – PH 3 Sep 2023 – Jul 2025 2 Trench, install, & backfill UG facilities – PH 1 Sep 2023 – July 2025 3 Trench, install, & backfill UG facilities – PH 4 Aug 2024 – Aug 2025 4 Trench, install, & backfill UG facilities – PH 2 Sep 2024 – Aug 2025 8.3 Staged and Phased Construction Not applicable. 9. PLANNED USE OF CONSULTANTS 9.1 Areas of Inspection and Review A Board of Consultants is not required for this project. Special consultants are not required for this project. 9.2 Consultants Names and Resumes Not applicable. Document Accession #: 20241023-5010 Filed Date: 10/23/2024 Bucks Creek 1102 Fire Rebuild Project, FERC No. 619, 1962, 2105 Quality Control Inspection Program 1 APPENDIX A QCIP ORGANIZATION CHART Document Accession #: 20241023-5010 Filed Date: 10/23/2024 Bucks Creek 1102 Fire Rebuild Project, FERC No. 619, 1962, 2105 Quality Control Inspection Program PROJECT ORGANIZATION CHART (1) AUTHORITY TO STOP WORK DUE TO ADVERSE QUALITY, EVIRONMENTAL, or LICENSE CONDITIONS. RESUMES ATTACHED IN APPENDIX B. (2) AUTHORITY TO RECOMMEND STOP WORK DUE TO ADVERSE ENVIRONMENTAL OR LICENSE CONDITIONS. RESUMES ATTACHED IN APPENDIX B. CONSTRUCTOR MGE Construction LICENSE COMPLIANCE LEAD Chadwick McCready ENGINEER -OF- RECORD (EOR) (1) David Mowry GEOSCIENCES ENGINEER(1) Robert McManus, Emily Steen, Hannah Curran, Brian Albin, Joseph de Larios, Mutaz Mihyar, Brandon Bretts, Enrico Rufini, Casey Phradichith, Hugo Velasquez FIELD INSPECTOR(1) John Carmichael, Curtis Friedrichs, Geoff Chadwick, Destaneigh Moore, Cory Branker, Graham McCulloch, Ryan Dutillieul, Alex Phillips DAM SAFETY ENGINEER Kaitlyn Daniels PROJECT MANAGER Michael Shaeffer QUALITY CONTROL MANAGER/LEAD(1) Larry McKee ENGINEERING MANAGER/LICENCEE Joe Landucci PROJECT EXECUTION DIRECTOR Paul Standen DEPUTY CHIEF DAM SAFETY ENGINEER Robert Ellis ENVIRONMENTAL LEAD(2) Jennifer Everett LABORATORY TESTING TBD Document Accession #: 20241023-5010 Filed Date: 10/23/2024 Bucks Creek 1102 Fire Rebuild Project, FERC No. 619, 1962, 2105 Quality Control Inspection Program APPENDIX B RESUMES FOR QCIP PERSONNEL WITH STOP-WORK AUTHORITY Document Accession #: 20241023-5010 Filed Date: 10/23/2024 Bucks Creek 1102 Fire Rebuild Project, FERC No. 619, 1962, 2105 Quality Control Inspection Program APPENDIX C REFERENCE LIST OF PROJECT-RELATED DOCUMENTS PROJECT-RELATED DOCUMENTS Number Description 35279181 FRRB – CWSP – BUCKS CREEK 1102 CB PH 1 35279182 FRRB – CWSP – BUCKS CREEK 1102 CB PH 2 35280499 FRRB – CWSP – BUCKS CREEK 1102 CB PH 3 35280560 FRRB – CWSP – BUCKS CREEK 1102 CB PH 4 35279182-1 BUCKS CREEK 1102 PH 2 - FERC BOUNDARY EXHIBIT 35280560-1 BUCKS CREEK 1102 PH 4 - FERC BOUNDARY EXHIBIT 35280499-1 BUCKS CREEK 1102 PH 3 - FERC BOUNDARY EXHIBIT TD-038193-B003 UTILITY BULLETIN: TD-038193-B003 EMS-4123 ENGINEERING MATERIAL SPECIFICATION EMS-4123, BACKFILL SAND Document Accession #: 20241023-5010 Filed Date: 10/23/2024 Bucks Creek 1102 Fire Rebuild Project, FERC No. 619, 1962, 2105 Quality Control Inspection Program Document Accession #: 20241023-5010 Filed Date: 10/23/2024 Bucks Creek 1102 Fire Rebuild Project, FERC No. 619, 1962, 2105 Quality Control Inspection Program APPENDIX D INSPECTION AND HOLD POINT CHECKLIST Document Accession #: 20241023-5010 Filed Date: 10/23/2024 Bucks Creek 1102 Fire Rebuild Project, FERC No. 619, 1962, 2105 Quality Control Inspection Program INSPECTION AND HOLD POINT CHECKLIST – Page 1 of 2 Job Order No.: 35279181, 35279182, 35280499, 35280560 PM: Michael Shaeffer Project Title: Bucks Creek 1102 Fire Rebuild Project EOR: David Mowry, PE Project Component: General (these items apply only to the sections of the project indicated as “Location A”, “Location B”, and “Location C” where the work will be nearby PG&E hydro facilities.) Constructor: MGE Underground # Inspection Point Hold Point (Yes/No). If yes, do not proceed until complete. Responsible Role Name, Sign & Date Criteria / References / Comments 1.0 Verify with Project Manager any environmental QC points Yes PM, Env Compliance 2.0 Hold MANDATORY on-site meeting with PM, EOR, field inspector, and constructor to discuss QCIP implementation Yes PM, EOR, Inspector, Contractor Review project documents and verify project scope, and intent. 3.0 Review and record as-found conditions not previously obtained during the design phase Yes Inspector, Contractor Review existing drawings and confirm accuracy. 4.0 Punch List Yes PM, EOR, Inspector, Contractor 5.0 Verify backfill material meets general backfill or structural backfill requirements. No EOR Utility Bulletin: TD-038193-B003; Engineering Material Specification EMS-4123, Backfill Sand 6.0 Inspect exposed trench subgrades once the excavation is completed to verify depth and the need for any additional excavation. No Inspector FRRB – CWSP – Bucks Creek 1102 CB PH 1; FRRB – CWSP – Bucks Creek 1102 CB PH 2; FRRB – CWSP – Bucks Creek 1102 CB PH 3; FRRB – CWSP – Bucks Creek 1102 CB PH 4; BUCKS CREEK 1102 PH 2 – FERC Boundary Exhibit; BUCKS CREEK 1102 PH 4 – FERC Boundary Exhibit; BUCKS CREEK 1102 PH 3 – FERC Boundary Exhibit Document Accession #: 20241023-5010 Filed Date: 10/23/2024 Bucks Creek 1102 Fire Rebuild Project, FERC No. 619, 1962, 2105 Quality Control Inspection Program Document Accession #: 20241023-5010 Filed Date: 10/23/2024 Bucks Creek 1102 Fire Rebuild Project, FERC No. 619, 1962, 2105 Quality Control Inspection Program INSPECTION AND HOLD POINT CHECKLIST – Page 2 of 2 # Inspection Point Hold Point (Yes/No). If yes, do not proceed until complete. Responsible Role Name, Sign & Date Criteria / References / Comments 7.0 Verify excavated trenches have required minimum widths. No Inspector FRRB – CWSP – Bucks Creek 1102 CB PH 1; FRRB – CWSP – Bucks Creek 1102 CB PH 2; FRRB – CWSP – Bucks Creek 1102 CB PH 3; FRRB – CWSP – Bucks Creek 1102 CB PH 4; BUCKS CREEK 1102 PH 2 – FERC Boundary Exhibit; BUCKS CREEK 1102 PH 4 – FERC Boundary Exhibit; BUCKS CREEK 1102 PH 3 – FERC Boundary Exhibit 8.0 Inspect for proper backfill placement and compaction for trench and backfill materials. No Inspector Compaction testing of 3/4" Class 2 aggregate base is required per drawings and in accordance with Appendix B Field Testing Requirements table. 9.0 Inspect final road restoration and final grading for proper elevations, slopes, and contours. No Inspector FRRB – CWSP – Bucks Creek 1102 CB PH 1; FRRB – CWSP – Bucks Creek 1102 CB PH 2; FRRB – CWSP – Bucks Creek 1102 CB PH 3; FRRB – CWSP – Bucks Creek 1102 CB PH 4; BUCKS CREEK 1102 PH 2 – FERC Boundary Exhibit; BUCKS CREEK 1102 PH 4 – FERC Boundary Exhibit; BUCKS CREEK 1102 PH 3 – FERC Boundary Exhibit 10.0 A registered geologist or engineer with geotechnical experience will observe excavation when vibratory rock breaking excavation is required within 100 feet of a hydroelectric asset. No Inspector, Geosciences Engineer FRRB – CWSP – Bucks Creek 1102 CB PH 1; FRRB – CWSP – Bucks Creek 1102 CB PH 2; FRRB – CWSP – Bucks Creek 1102 CB PH 3; FRRB – CWSP – Bucks Creek 1102 CB PH 4; BUCKS CREEK 1102 PH 2 – FERC Boundary Exhibit; BUCKS CREEK 1102 PH 4 – FERC Boundary Exhibit; BUCKS CREEK 1102 PH 3 – FERC Boundary Exhibit Document Accession #: 20241023-5010 Filed Date: 10/23/2024 Bucks Creek 1102 Fire Rebuild Project, FERC No. 619, 1962, 2105 Quality Control Inspection Program Document Accession #: 20241023-5010 Filed Date: 10/23/2024 Bucks Creek 1102 Fire Rebuild Project, FERC No. 619, 1962, 2105 Quality Control Inspection Program Document Accession #: 20241023-5010 Filed Date: 10/23/2024 Bucks Creek 1102 Fire Rebuild Project, FERC No. 619, 1962, 2105 Quality Control Inspection Program Document Accession #: 20241023-5010 Filed Date: 10/23/2024 Bucks Creek 1102 Fire Rebuild Project, FERC No. 619, 1962, 2105 Quality Control Inspection Program APPENDIX E MATERIAL AND FIELD-TESTING REQUIREMENTS Document Accession #: 20241023-5010 Filed Date: 10/23/2024 Bucks Creek 1102 Fire Rebuild Project, FERC No. 619, 1962, 2105 Quality Control Inspection Program MATERIAL AND FIELD-TESTING REQUIREMENTS – Page 1 of 1 Job Order No.: 35279181, 35279182, 35280499, 35280560 PM: Michael Shaeffer Project Title: Bucks Creek 1102 Fire Rebuild Project EOR: David Mowry, PE Facility/Lab Testing Facility: TBD Constructor: MGE Underground # Material Test Test Method and/or Standard Test Frequency and Acceptance Criteria 1.0 3/4" Class 2 aggregate base Compaction (95% Relative Compaction) ASTM D1557 At completion and as directed by the Engineer of Record Document Accession #: 20241023-5010 Filed Date: 10/23/2024 Bucks Creek 1102 Fire Rebuild Project, FERC No. 619, 1962, 2105 Quality Control Inspection Program APPENDIX F QCIP REPORTING TEMPLATES Document Accession #: 20241023-5010 Filed Date: 10/23/2024 Bucks Creek 1102 Fire Rebuild Project, FERC No. 619, 1962, 2105 Quality Control Inspection Program DAILY INSPECTION REPORT Job # Click here to enter text. Report #: Click here to enter text. Date: Click here to enter text. Project Name: Click here to enter text. Supervisor: Click here to enter text. Weather: Click here to enter text. Job Location: Click here to enter text. Daily Tailboard/Safety Tailboard: Click here to enter text. Details of labor, equipment usage, and standby equipment time: Click here to enter text. Work Plan for Today: Click here to enter text. Today’s Progress: Click here to enter text. Problems/Discussions/Delays: Click here to enter text. Material/Equipment Deliveries/Equipment Departures: Click here to enter text. Instructions to constructor, inspections, acceptances, and rejections: Click here to enter text. Comments: Click here to enter text. Photos: (Attach) Field Workers Field Worker Trade Quantity SIGNATURE: Document Accession #: 20241023-5010 Filed Date: 10/23/2024 Bucks Creek 1102 Fire Rebuild Project, FERC No. 619, 1962, 2105 Quality Control Inspection Program NONCONFORMANCE REPORT (NCR) NONCONFORMANCE: 1. Date Identified: _________________________________________________________________________ 2. Identified by: __________________________________________________________________________ 3. Department: ___________________________________________________________________________ 4. Location: ___________________________________________________________________________ 5. Description of nonconformance: 6. Cause of problem: 7. Analysis of the problem: Prepared by: _____________________ Date: _____________ CORRECTIVE MEASURES: 1. Description of corrective measures: 2. Date corrective measures completed: ________________________________ 3. Inspected and Approved by: Field Inspector: _________________________ Date: ________________ Engineer of Record: _____________________ Date: ________________ cc: Field Inspectors License Compliance Lead Constructor Dam Safety Engineer / SME Engineer of Record PM File Document Accession #: 20241023-5010 Filed Date: 10/23/2024 Bucks Creek 1102 Fire Rebuild Project, FERC No. 619, 1962, 2105 Quality Control Inspection Program ENVIRONMENTAL DEFICIENCY REPORT (EDR) DEFICIENCY: 1. Date Identified: _________________________________________________________________________ 2. Identified by: __________________________________________________________________________ 3. Department: ___________________________________________________________________________ 4. Location: ___________________________________________________________________________ 5. Description of Deficiency: 6. Cause of problem: 7. Analysis of the problem: Prepared by: _____________________ Date: _____________ CORRECTIVE MEASURES: 1. Description of corrective measures: 2. Date corrective measures completed: ________________________________ 3. Inspected and Approved by: Field Inspector: ______________________ Date: ________________ Environmental Lead: __________________ Date: ________________ cc: Field Inspectors License Compliance Lead Constructor Environmental Lead PM File Engineer of Record Document Accession #: 20241023-5010 Filed Date: 10/23/2024 Document Content(s) PGE20241022_multiproj_Bucks_1102_QCIP_Rev6.pdf ...........................1 Document Accession #: 20241023-5010 Filed Date: 10/23/2024