HomeMy WebLinkAbout10.24.24 Board Correspondence - FW_ Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board
To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan;
Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen;
Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie
Cc:Nevers, Dawn
Subject:Board Correspondence - FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by
Pacific Gas and Electric Company,et al.
Date:Thursday, October 24, 2024 4:58:40 PM
Please see Board Correspondence -
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Thursday, October 24, 2024 12:55 PM
Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric
Company,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening
attachments, clicking on links, or replying..
On 10/24/2024, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC),
Washington D.C.:
Filer: Pacific Gas and Electric Company
Pacific Gas & Electric Company (as Agent)
Docket(s): P-619-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Part 12 Consultant Safety Inspection Reports
Description: Pacific Gas and Electric Company submits Part 12D Inspection Plan, including an Independent
Consultant team proposal, for the Comprehensive Assessment of the Grizzly Forebay Dam, part of the Bucks Creek
Hydroelectric Proiect under P-619.
To view the document for this Filing, click here
https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20241024-
5131__;!!KNMwiTCp4spf!HKIdAZFK1L-XMgz6wZ91GbuijxDm2RTQFWgvYlZoKGDzQBz7ZUjwTe2w5OV-
29fgwgRr0g3CmlPiBKXeQDx6QGvkFnVJSOL7Mmhp$
To modify your subscriptions, click here:
https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!HKIdAZFK1L-
XMgz6wZ91GbuijxDm2RTQFWgvYlZoKGDzQBz7ZUjwTe2w5OV-
29fgwgRr0g3CmlPiBKXeQDx6QGvkFnVJSGZOhnSy$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!HKIdAZFK1L-
XMgz6wZ91GbuijxDm2RTQFWgvYlZoKGDzQBz7ZUjwTe2w5OV-
29fgwgRr0g3CmlPiBKXeQDx6QGvkFnVJSPkGx8V5$
or for phone support, call 866-208-3676.
Power Generation
300 Lakeside Drive
Oakland, CA 94612
Mailing Address:
P.O. Box 28209
Oakland, CA 94604
October 24, 2024
Via Electronic Submittal (E-File)
David E. Capka, P.E., Director
Federal Energy Regulatory Commission
Division of Dam Safety and Inspections, Office of Energy Projects
888 First Street, N.E., Room 6N-01
Washington, D.C. 20426
RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA
Grizzly Forebay Dam, NATDAM No. CA00333
12th Part 12D Inspection Plan for Comprehensive Assessment
ENCLOSURES CONTAINS CUI//CEII – DO NOT RELEASE
Dear David E. Capka:
This letter presents Pacific Gas and Electric Company’s (PG&E) Part 12D inspection
plan, including an independent consultant (IC) team proposal, for the comprehensive
assessment (CA) of the following dam and appurtenant structures associated with
PG&E’s Bucks Creek Hydroelectric Project, Federal Energy Regulatory Commission
(FERC) No. 619. FERC provided PG&E the general requirements for the 12th Part 12D
CA for the Grizzly Forebay development in a letter dated May 15, 2024.
Dam Report No. Report Due Date
Grizzly Forebay Dam 12th November 1, 2025
The enclosed Part 12D inspection plan (Enclosure 1) includes descriptions of project
features to be inspected, a schedule for inspection-related activities, and resumes for
the IC team. In accordance with Title 18 of the Code of Federal Regulations, Section
12.34, PG&E requests approval of the IC team and potential failure mode and risk
analysis facilitator.
PG&E’s schedule, included in Enclosure 1, meets the requirement to have the first IC
team activity occur at least 180 days after submitting the Part 12D inspection plan. With
FERC approval, PG&E and the IC team are available to perform the first activity on April
22, 2025, which would include submittal of the pre-inspection preparation report 30 days
before this IC team activity.
Document Accession #: 20241024-5131 Filed Date: 10/24/2024
David E. Capka, P.E., Director
October 24, 2024
Page 2
Should you have technical questions concerning this matter, please contact Kaitlyn
Daniels, dam safety engineer for PG&E, at (707) 342-7885. For general questions,
please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990.
Sincerely,
Robert O. Ellis, P.E., G.E.
Deputy Chief Dam Safety Engineer
Enclosure: CUI//CEII – DO NOT RELEASE
1. 12th Part 12D Inspection Comprehensive Assessment – Inspection Plan, Grizzly
Forebay Dam, prepared by HDR Engineering, Inc. and dated October 23, 2024
cc: via email w/enclosure and FERC accession number
Frank L. Blackett, P.E., Regional Engineer
via hard copy w/enclosure
Sharon Tapia, Division Manager
Department of Water Resources
Division of Safety of Dams
2720 Gateway Oaks Drive, Suite 300
Sacramento, CA 95833
Document Accession #: 20241024-5131 Filed Date: 10/24/2024
Document Content(s)