Loading...
HomeMy WebLinkAbout10.24.24 Board Correspondence - FW_ Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie Cc:Nevers, Dawn Subject:Board Correspondence - FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. Date:Thursday, October 24, 2024 4:58:40 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Thursday, October 24, 2024 12:55 PM Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 10/24/2024, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Pacific Gas & Electric Company (as Agent) Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Part 12 Consultant Safety Inspection Reports Description: Pacific Gas and Electric Company submits Part 12D Inspection Plan, including an Independent Consultant team proposal, for the Comprehensive Assessment of the Grizzly Forebay Dam, part of the Bucks Creek Hydroelectric Proiect under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20241024- 5131__;!!KNMwiTCp4spf!HKIdAZFK1L-XMgz6wZ91GbuijxDm2RTQFWgvYlZoKGDzQBz7ZUjwTe2w5OV- 29fgwgRr0g3CmlPiBKXeQDx6QGvkFnVJSOL7Mmhp$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!HKIdAZFK1L- XMgz6wZ91GbuijxDm2RTQFWgvYlZoKGDzQBz7ZUjwTe2w5OV- 29fgwgRr0g3CmlPiBKXeQDx6QGvkFnVJSGZOhnSy$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!HKIdAZFK1L- XMgz6wZ91GbuijxDm2RTQFWgvYlZoKGDzQBz7ZUjwTe2w5OV- 29fgwgRr0g3CmlPiBKXeQDx6QGvkFnVJSPkGx8V5$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 October 24, 2024 Via Electronic Submittal (E-File) David E. Capka, P.E., Director Federal Energy Regulatory Commission Division of Dam Safety and Inspections, Office of Energy Projects 888 First Street, N.E., Room 6N-01 Washington, D.C. 20426 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA Grizzly Forebay Dam, NATDAM No. CA00333 12th Part 12D Inspection Plan for Comprehensive Assessment ENCLOSURES CONTAINS CUI//CEII – DO NOT RELEASE Dear David E. Capka: This letter presents Pacific Gas and Electric Company’s (PG&E) Part 12D inspection plan, including an independent consultant (IC) team proposal, for the comprehensive assessment (CA) of the following dam and appurtenant structures associated with PG&E’s Bucks Creek Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619. FERC provided PG&E the general requirements for the 12th Part 12D CA for the Grizzly Forebay development in a letter dated May 15, 2024. Dam Report No. Report Due Date Grizzly Forebay Dam 12th November 1, 2025 The enclosed Part 12D inspection plan (Enclosure 1) includes descriptions of project features to be inspected, a schedule for inspection-related activities, and resumes for the IC team. In accordance with Title 18 of the Code of Federal Regulations, Section 12.34, PG&E requests approval of the IC team and potential failure mode and risk analysis facilitator. PG&E’s schedule, included in Enclosure 1, meets the requirement to have the first IC team activity occur at least 180 days after submitting the Part 12D inspection plan. With FERC approval, PG&E and the IC team are available to perform the first activity on April 22, 2025, which would include submittal of the pre-inspection preparation report 30 days before this IC team activity. Document Accession #: 20241024-5131 Filed Date: 10/24/2024 David E. Capka, P.E., Director October 24, 2024 Page 2 Should you have technical questions concerning this matter, please contact Kaitlyn Daniels, dam safety engineer for PG&E, at (707) 342-7885. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure: CUI//CEII – DO NOT RELEASE 1. 12th Part 12D Inspection Comprehensive Assessment – Inspection Plan, Grizzly Forebay Dam, prepared by HDR Engineering, Inc. and dated October 23, 2024 cc: via email w/enclosure and FERC accession number Frank L. Blackett, P.E., Regional Engineer via hard copy w/enclosure Sharon Tapia, Division Manager Department of Water Resources Division of Safety of Dams 2720 Gateway Oaks Drive, Suite 300 Sacramento, CA 95833 Document Accession #: 20241024-5131 Filed Date: 10/24/2024 Document Content(s) PGE20241024_619_GrizzlyP12InspectionPlan_CA_Ltr.pdf ......................1 Document Accession #: 20241024-5131 Filed Date: 10/24/2024