Loading...
HomeMy WebLinkAbout10.30.24 Board Correspondence – FW_ Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie Cc:Nevers, Dawn Subject:Board Correspondence – FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. Date:Thursday, October 31, 2024 8:28:34 AM Please see Board Correspondence – -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Wednesday, October 30, 2024 1:05 PM Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 10/30/2024, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Pacific Gas & Electric Company (as Agent) Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Part 12 Consultant Safety Inspection Reports Description: Pacific Gas and Electric Company submits summary and conclusion of efforts to address Recommendation No. 15 from the Tenth Part 12D Safety Inspection Report, et al. re the Philbrook Dam of the DeSabla-Centerville Hydroelectric Project under p-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist? accession_num=20241030-5200__;!!KNMwiTCp4spf!G9KMbX_LWvoPL9_- HHBpgGybiD6We5m7TZCTSuKml_X6GmdxN7v_AY0-mWNL-_F_fP6a9kxj7exT67IpQvCYt8l8F959Xfi8H4Ru$ To modify your subscriptions, click here: HHBpgGybiD6We5m7TZCTSuKml_X6GmdxN7v_AY0-mWNL-_F_fP6a9kxj7exT67IpQvCYt8l8F959XeTAgk-j$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!G9KMbX_LWvoPL9_- HHBpgGybiD6We5m7TZCTSuKml_X6GmdxN7v_AY0-mWNL- _F_fP6a9kxj7exT67IpQvCYt8l8F959XQ76MFQw$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 October 30, 2024 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA Philbrook Dam, NATDAM No. CA00345 10th Part 12D Inspection – Summary and Conclusion for Recommendation 15 11th Part 12D Inspection – Summaries and Conclusions for Recommendations 1 and 9 ENCLOSURES CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter reports on the completion of Pacific Gas and Electric Company's (PG&E) efforts to address Recommendation 15 (R-15) from the 10th 5-year Part 12D safety inspection report (dated June 2015) and Recommendations 1 and 9 (R-1 and R-9) from the 11th 5-year Part 12D safety inspection report (dated October 2020) for Philbrook Dam, which is part of PG&E’s DeSabla-Centerville Hydroelectric Project, FERC No. 803. PG&E submitted its original plan and schedule for addressing R-15 in a letter to your office dated December 15, 2015; original plan and schedule for addressing R-1 and R-9 in a letter dated December 31, 2020; and most recent update and extension of time request regarding the recommendations in a letter dated June 18, 2024. Summaries and conclusions of PG&E’s efforts to address the recommendations are enclosed with this letter (Enclosure 1). A geotechnical report including updated stability analyses is provided in (Enclosure 2). PG&E has reviewed the consultant’s report and concurs with the information presented therein. PG&E believes that R-15, R-1, and R-9 have been satisfactorily addressed based on the information enclosed with this letter. Should you have technical questions concerning this matter, please contact Kaitlyn Daniels, dam safety engineer for PG&E, at (707) 342-7885. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosures: CUI//CEII – DO NOT RELEASE 1. Summaries and Conclusions for Recommendation 15 from the 10th Part 12D Safety Inspection Report and Recommendations 1 and 9 from the 11th Part 12D Safety Inspection Report 2. Geotechnical Report, Philbrook Dams, prepared by Gannett Fleming and dated September 2024 cc: See Attached List Document Accession #: 20241030-5200 Filed Date: 10/30/2024 Frank L. Blackett, P.E., Regional Engineer October 30, 2024 Page 2 cc: via hard copy w/enclosures Sharon Tapia, Division Manager Department of Water Resources Division of Safety of Dams 2720 Gateway Oaks Drive, Suite 300 Sacramento, CA 95833 Document Accession #: 20241030-5200 Filed Date: 10/30/2024 Document Content(s) PGE20241030_803_Philbrook10thP12R15_11thR1R9_Ltr.pdf......................1 Document Accession #: 20241030-5200 Filed Date: 10/30/2024