HomeMy WebLinkAbout10.29.24 Board Correspondence - FW_ Request for Delay of Action_Extension of Time submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board To:Loeser, Kamie; Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Nevers, Dawn Subject:Board Correspondence - FW: Request for Delay of Action/Extension of Time submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. Date:Wednesday, October 30, 2024 5:00:44 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Tuesday, October 29, 2024 10:25 AM Subject: Request for Delay of Action/Extension of Time submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 10/29/2024, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company No Organization Found (as Agent) Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Request for Delay of Action/Extension of Time Description: Pacific Gas and Electric Company submits request for extension of time until 11/28/2025 to file the final construction report re Grizzly Tap Removal and Reconnection at the Bucks Creek Powerhouse of the Bucks Creek Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20241029- 5127__;!!KNMwiTCp4spf!DJoa4jpV1309nBNiNrS3ukGzm2hTcmSQrgaTK9GFob4KIgT6LRjA2XtdbFowtPPM3wDQKXGuSJgXCt-xSHO-g_4bQV3N15rZH6W6$ To modify your subscriptions, click here: xSHO-g_4bQV3N11zcm8WS$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!DJoa4jpV1309nBNiNrS3ukGzm2hTcmSQrgaTK9GFob4KIgT6LRjA2XtdbFowtPPM3wDQKXGuSJgXCt-xSHO- g_4bQV3N14VtV2sn$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 October 29, 2024 Via Electronic Submittal (E-File) Frank Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA Bucks Creek Powerhouse Grizzly Tap Removal and Reconnection – Extension of Time Request Dear Frank L. Blackett: This letter requests an extension of time (EOT) to file the final construction report (FCR) for the Grizzly Tap removal and reconnection project at Bucks Creek Powerhouse, w hich is part of Pacific Gas and Electric Company’s (PG&E) Bucks Creek Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619. On April 22, 2021, FERC issued an Order Amending the Bucks Creek Hydroelectric Project, FERC No. 619 (“Project”) License to Change Transmission Line Route and Revising Project Description. Following the Order, on April 29, 2021, FERC’s San Francisco Regional Office authorized PG&E to proceed with the proposed project modifications. Due to impacts from the Dixie Fire, PG&E filed an EOT request on January 13, 2022. PG&E continued to experience project delays due to Dixie Fire impacts and restricted access due to landslides in the project area . In addition, the reconnection work was also dependent on the 115 kV Transmission Line Rebuild, due to these delays PG&E filed an EOT request on May 23, 2023, and February 29, 2024. PG&E has completed the 115-kV Transmission Line Rebuild Phase I work. PG&E utilized a temporary shoofly to perform testing, commissioning occurred on December 23, 2023. PG&E remobilized in summer 2024 to complete the remaining civil work at Bucks Creek powerhouse but had to demobilize to accommodate the rebuilding the 115-kV Transmission Line Rebuild Phase II work which included removing the existing temporary shoofly. This was necessary due to limited space at Bucks Creek powerhouse yard and the overlapping project work areas. For these reasons, construction completion of the remaining civil work at Bucks Creek powerhouse has slipped to August 29, 2025. PG&E respectfully requests an EOT to file the FCR with FERC on November 28, 2025. Document Accession #: 20241029-5127 Filed Date: 10/29/2024 Frank Blackett, P.E., Regional Engineer October 29, 2024 Page 2 PG&E appreciates FERC’s continued support of PG&E’s project to reconnect the Grizzly Powerhouse. Should you have technical questions concerning this matter, please contact Gavin Rhoads, project engineer for PG&E, at (530) 370 -6685. For general questions, please contact Jamie Visinoni, senior license coordinator for PG&E, at (530) 215 -6676. Sincerely, Matthew Joseph. Supervisor, Hydro License Management cc: via email Valentina Guzman, City of Santa Clara – vguzman@SantaClaraCA.gov Nick Van Haeften, City of Santa Clara – NVanHaeften@SantaClaraCA.gov Chris Karwick, City of Santa Clary - CKarwick@SantaClaraCA.gov Document Accession #: 20241029-5127 Filed Date: 10/29/2024 Document Content(s) PGE20241029_619_Grizzly_PH_EOT.pdf........................................1 Document Accession #: 20241029-5127 Filed Date: 10/29/2024