Loading...
HomeMy WebLinkAbout10.25.24 Board Correspondence - FW_ Compliance Directives issued in FERC P-803-000From:Clerk of the Board To:BOS Cc:Nevers, Dawn; Loeser, Kamie Subject:Board Correspondence - FW: Compliance Directives issued in FERC P-803-000 Date:Friday, October 25, 2024 8:21:45 AM Please see Board Correspondence received below. -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, October 25, 2024 4:45 AM Subject: Compliance Directives issued in FERC P-803-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 10/24/2024, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Compliance Directives General Correspondence Description: Letter to Pacific Gas and Electric Company providing comments on the 07/28/2023 el al. Geotechnical Investigation Report, et al. to address Recommendations 8, et al for the Round Valley Development, part of the DeSabla-Centerville Project under P-803. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20241024- 3094__;!!KNMwiTCp4spf!CYcW- RywHCCNyNs9St1LwVilqUZYSRI4WvQa0dNbHyjwVQ1QH8hlXGgtK5BxQ4SFST2pLrxGfsMjy3t- V2RIhTPJZZC9zs1f0Tno$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!CYcW- RywHCCNyNs9St1LwVilqUZYSRI4WvQa0dNbHyjwVQ1QH8hlXGgtK5BxQ4SFST2pLrxGfsMjy3t- V2RIhTPJZZC9zgQ5mBy9$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!CYcW- RywHCCNyNs9St1LwVilqUZYSRI4WvQa0dNbHyjwVQ1QH8hlXGgtK5BxQ4SFST2pLrxGfsMjy3t- V2RIhTPJZZC9zhRXGA4l$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections – San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 (415) 369-3300 October 24, 2024 In reply refer to: Project No. 803-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric Company 300 Lakeside Dr. Oakland, CA 94612-3534 Re: Various Part 12D Recommendations and Geotechnical Investigation and Geotechnical Engineering Reports Dear Mr. Cruzen: This is in response to letters dated July 28, 2023 and February 26, 2024 from Mr. Robert Ellis that submitted a geotechnical investigation report and geotechnical engineering report to collectively address Recommendations 8 and 18 (R-8 and R-18) from the first 5-year Part 12D safety inspection report and Recommendations 1, 2, and 19 (R-1, R-2, and R-19) from the second 5-year Part 12D safety inspection report for the Round Valley Development, which is part of the DeSabla-Centerville Project, FERC No. 803. We have reviewed the submittals, and the enclosure contains our comments. Within 45 days of the date of this letter, address our comments or provide a plan and schedule to address our comments. File your submittal using our eFiling system at https://www.ferc.gov/ferc-online/overview. When eFiling, select Hydro: Dam Safety; San Francisco Regional Office from the eFiling menu. The cover page of the filing must indicate that the material was eFiled. For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). Document Accession #: 20241024-3094 Filed Date: 10/24/2024 2 We appreciate your cooperation in this aspect of our dam safety program. If you have questions, contact Ms. Eunhye Kim at (415) 369-3321. Sincerely, Frank L. Blackett, P.E. Regional Engineer Enclosure cc: Ms. Sharon Tapia, Division Manager Division of Safety of Dams California Department of Water Resources P.O. Box 942836 Sacramento, CA 94236-0001 Document Accession #: 20241024-3094 Filed Date: 10/24/2024 Frank L Blackett, P.E.Digitally signed by Frank L Blackett, P.E. Date: 2024.10.24 13:14:51 -07'00' Geotechnical Investigation Report and Enclosure Geotechnical Engineering Report P-803 Round Valley Dam 1 of 1 1. We understand that Bray and Travasarou (2007) and Makdisi-seed (1978) has been used to estimate seismic deformations. However, detailed assumptions and parameters used for each estimation were not provided. To clearly show your work processes on these simplified methods, provide the worksheet for each analysis showing how the input values and assumptions have been used to calculate the seismic deformation, including numerical values at each step and the rationale behind those choices. 2. Table 2 of Gannet Fleming’s June 29, 2023, Engineering Report states that water levels in piezometers B-2 and B-4 may be erroneous since some recordings are higher than the reservoir level. However, due to the high number of fines in the fill, it is possible that the embankment did not have sufficient time to drain pore water pressure, leading to piezometer readings higher than the reservoir. Future stability analyses should consider the possibility of delayed drainage of the embankment fill, or other situations that could result in higher phreatic levels. Document Accession #: 20241024-3094 Filed Date: 10/24/2024 Document Content(s) P-803-000 S61915 S63982 Geo Data Stability IRRM Letter.pdf ...............1 Document Accession #: 20241024-3094 Filed Date: 10/24/2024