Loading...
HomeMy WebLinkAbout11.6.24 Board Correspondence - FW_ Compliance Directives issued in FERC P-619-000,et al.From:Clerk of the Board To:Loeser, Kamie; Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Nevers, Dawn Subject:Board Correspondence - FW: Compliance Directives issued in FERC P-619-000,et al. Date:Wednesday, November 6, 2024 4:54:44 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Wednesday, November 6, 2024 4:56 AM Subject: Compliance Directives issued in FERC P-619-000,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 11/5/2024, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-619-000 P-1962-000 P-2105-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Compliance Directives General Correspondence Description: Letter to Pacific Gas and Electric Company providing comments on the 06/18/2024 revised Quality Control Inspection Program for the Bucks Creek 1103 Circuit Fire Rebuild Project, part of the Bucks Creek Hydroelectric Project, et al. under P-619, et al. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist? accession_num=20241105-3061__;!!KNMwiTCp4spf!AmXgiR5CaHS- To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!AmXgiR5CaHS- ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!AmXgiR5CaHS- tPhCpqQhgf5AMMTb4bxF9jbIBZARbbRKMHbVLRF8ymvDiWvYGI7UwSEEFzQQHMMK6Ps74PJEXxflSzGY4jJieopF$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections – San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 (415) 369-3300 November 5, 2024 In reply refer to: Project Nos. 619, 1962, and 2105-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric Company 300 Lakeside Dr. Oakland, CA 94612-3534 Re: Quality Control Inspection Program for Bucks Creek 1103 Circuit Fire Rebuild Project Dear Mr. Cruzen: This is in response to a letter dated June 18, 2024 from Mr. Chadwick McCready that submitted a revised Quality Control Inspection Program (QCIP) for the Bucks Creek 1103 Circuit Fire Rebuild Project, which is part of Bucks Creek Hydroelectric Project, FERC No. 619, Rock Creek-Cresta Hydroelectric Project, FERC No. 1962, Upper North Fork Feather River Hydroelectric Project, FERC No. 2105-CA. We have reviewed the submittal, and we have the following comments: 1. Your letter stated that the revised QCIP is for the Bucks Creek 1103 Circuit Fire Rebuild Project at the Bucks Creek, Rock Creek Cresta, and Upper North Fork River Projects, FERC. Nos 619, 1962, and 2105, respectively. To date, we have not received construction documents related to Bucks Creek 1103 Circuit Fire Rebuild for Projects Nos. 619 and 2105. Clarify whether the revised QCIP is for all the referenced project numbers. 2. The resumes in Appendix C were not included. Provide resumes for those who have stop work authority in Appendix C. Document Accession #: 20241105-3061 Filed Date: 11/05/2024 2 Within 45 days of the date of this letter, address our comments or provide a plan and schedule to address our comments. File your submittal using our eFiling system at https://www.ferc.gov/ferc-online/overview. When eFiling, select Hydro: Dam Safety; San Francisco Regional Office from the eFiling menu. The cover page of the filing must indicate that the material was eFiled. For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). We appreciate your continued efforts in this aspect of our dam safety program. If you have any questions, contact Ms. Eunhye Kim at (415) 369-3321. Sincerely, Frank L. Blackett, P.E. Regional Engineer cc: Ms. Sharon Tapia, Division Manager CA Dept. of Water Resources Division of Safety of Dams P.O. Box 942836 Sacramento, CA 94236-0001 Document Accession #: 20241105-3061 Filed Date: 11/05/2024 Frank L Blackett, P.E.Digitally signed by Frank L Blackett, P.E. Date: 2024.11.05 14:48:25 -08'00' Document Content(s) P-1962-000 S65349_rev_QCIP_CircuitRebuild_Cresta.pdf......................1 Document Accession #: 20241105-3061 Filed Date: 11/05/2024