HomeMy WebLinkAbout11.6.24 Board Correspondence - FW_ Compliance Directives issued in FERC P-619-000,et al.From:Clerk of the Board
To:Loeser, Kamie; Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan;
Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter,
Doug; Zepeda, Elizabeth
Cc:Nevers, Dawn
Subject:Board Correspondence - FW: Compliance Directives issued in FERC P-619-000,et al.
Date:Wednesday, November 6, 2024 4:54:44 PM
Please see Board Correspondence -
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Wednesday, November 6, 2024 4:56 AM
Subject: Compliance Directives issued in FERC P-619-000,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments,
clicking on links, or replying..
On 11/5/2024, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document:
Docket(s): P-619-000
P-1962-000
P-2105-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Compliance Directives
General Correspondence
Description: Letter to Pacific Gas and Electric Company providing comments on the 06/18/2024 revised Quality Control
Inspection Program for the Bucks Creek 1103 Circuit Fire Rebuild Project, part of the Bucks Creek Hydroelectric Project, et
al. under P-619, et al.
To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?
accession_num=20241105-3061__;!!KNMwiTCp4spf!AmXgiR5CaHS-
To modify your subscriptions, click here:
https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!AmXgiR5CaHS-
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!AmXgiR5CaHS-
tPhCpqQhgf5AMMTb4bxF9jbIBZARbbRKMHbVLRF8ymvDiWvYGI7UwSEEFzQQHMMK6Ps74PJEXxflSzGY4jJieopF$
or for phone support, call 866-208-3676.
Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov
FEDERAL ENERGY REGULATORY COMMISSION
Office of Energy Projects
Division of Dam Safety and Inspections – San Francisco Regional Office
100 First Street, Suite 2300
San Francisco, CA 94105-3084
(415) 369-3300
November 5, 2024
In reply refer to:
Project Nos. 619, 1962, and
2105-CA
VIA FERC Service
Mr. Russell Cruzen, P.E., Director
Power Generation, Asset Excellence
Pacific Gas and Electric Company
300 Lakeside Dr.
Oakland, CA 94612-3534
Re: Quality Control Inspection Program for Bucks Creek 1103 Circuit Fire Rebuild
Project
Dear Mr. Cruzen:
This is in response to a letter dated June 18, 2024 from Mr. Chadwick McCready
that submitted a revised Quality Control Inspection Program (QCIP) for the Bucks Creek
1103 Circuit Fire Rebuild Project, which is part of Bucks Creek Hydroelectric Project,
FERC No. 619, Rock Creek-Cresta Hydroelectric Project, FERC No. 1962, Upper North
Fork Feather River Hydroelectric Project, FERC No. 2105-CA. We have reviewed the
submittal, and we have the following comments:
1. Your letter stated that the revised QCIP is for the Bucks Creek 1103 Circuit
Fire Rebuild Project at the Bucks Creek, Rock Creek Cresta, and Upper North
Fork River Projects, FERC. Nos 619, 1962, and 2105, respectively. To date,
we have not received construction documents related to Bucks Creek 1103
Circuit Fire Rebuild for Projects Nos. 619 and 2105. Clarify whether the
revised QCIP is for all the referenced project numbers.
2. The resumes in Appendix C were not included. Provide resumes for those who
have stop work authority in Appendix C.
Document Accession #: 20241105-3061 Filed Date: 11/05/2024
2
Within 45 days of the date of this letter, address our comments or provide a plan
and schedule to address our comments. File your submittal using our eFiling system at
https://www.ferc.gov/ferc-online/overview. When eFiling, select Hydro: Dam Safety;
San Francisco Regional Office from the eFiling menu. The cover page of the filing must
indicate that the material was eFiled. For assistance with eFiling, contact FERC Online
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659
(TTY).
We appreciate your continued efforts in this aspect of our dam safety program. If
you have any questions, contact Ms. Eunhye Kim at (415) 369-3321.
Sincerely,
Frank L. Blackett, P.E.
Regional Engineer
cc:
Ms. Sharon Tapia, Division Manager
CA Dept. of Water Resources
Division of Safety of Dams
P.O. Box 942836
Sacramento, CA 94236-0001
Document Accession #: 20241105-3061 Filed Date: 11/05/2024
Frank L Blackett, P.E.Digitally signed by Frank L Blackett,
P.E.
Date: 2024.11.05 14:48:25 -08'00'