Loading...
HomeMy WebLinkAbout11.8.24 Board Correspondence – FW_ Compliance Directives issued in FERC P-619-000From:Clerk of the Board To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie Cc:Nevers, Dawn Subject:Board Correspondence – FW: Compliance Directives issued in FERC P-619-000 Date:Tuesday, November 12, 2024 10:50:57 AM Please see Board Correspondence – -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, November 8, 2024 4:46 AM Subject: Compliance Directives issued in FERC P-619-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 11/7/2024, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Compliance Directives General Correspondence Description: Letter to Pacific Gas and Electric Company discussing the 07/18/2024, et al., updated schedule and Quality Control Inspection Plan for the Milk Ranch Conduit Diversion Management Project, part of the Bucks Creek Hydroelectric Project under P-619. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20241107- 3075__;!!KNMwiTCp4spf!GaI-Ks4IGPPlZYlfYEMIrezj_wEnwbNl6QEDybEG-vJ8_DzwGJYozy1BTjPbB- XAcKxfALXgtmpch3zRt9jagjLtNyA2XoG8SkeI$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!GaI- Ks4IGPPlZYlfYEMIrezj_wEnwbNl6QEDybEG-vJ8_DzwGJYozy1BTjPbB- XAcKxfALXgtmpch3zRt9jagjLtNyA2Xu9n4V8j$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!GaI- Ks4IGPPlZYlfYEMIrezj_wEnwbNl6QEDybEG-vJ8_DzwGJYozy1BTjPbB- XAcKxfALXgtmpch3zRt9jagjLtNyA2XvatNWk8$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections – San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 (415) 369-3300 November 7, 2024 In reply refer to: Project No. 619-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric Company 300 Lakeside Dr. Oakland, CA 94612-3534 Re: Milk Ranch Conduit Management Project Dear Mr. Cruzen: This is in response to a letter dated July 18, 2024 from Mr. Matthew Joseph and a letter dated August 7, 2024 from Mr. Kyle Ingvoldsen that submitted an updated schedule and Quality Control Inspection Plan for the Milk Ranch Conduit Diversion Management Project, which is part of the Bucks Creek Hydroelectric Project, FERC No. 619. We have reviewed the submittals and have no comments. Within 90 days of completion or by January 2, 2025, submit a brief report documenting the modifications. File your submittal using our eFiling system at https://www.ferc.gov/ferc-online/overview. When eFiling, select Hydro: Dam Safety; San Francisco Regional Office from the eFiling menu. The cover page of the filing must indicate that the material was eFiled. For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). Document Accession #: 20241107-3075 Filed Date: 11/07/2024 2 We appreciate your continued efforts in this aspect of our dam safety program. If you have questions, please contact Ms. Eunhye Kim at (415) 369-3321. Sincerely, Frank L. Blackett, P.E. Regional Engineer cc: Ms. Sharon Tapia, Division Manager CA Dept. of Water Resources Division of Safety of Dams P.O. Box 942836 Sacramento, CA 94236-0001 Document Accession #: 20241107-3075 Filed Date: 11/07/2024 Frank L Blackett, P.E.Digitally signed by Frank L Blackett, P.E. Date: 2024.11.07 14:27:59 -08'00' Document Content(s) P-619-000 S65857_Milk Ranch Conduit-QCIP Update.pdf ......................1 Document Accession #: 20241107-3075 Filed Date: 11/07/2024