Loading...
HomeMy WebLinkAbout10.29.24 Board Correspondence - FW_ Delegated Order issued in FERC P-619-000From:Clerk of the Board To:Loeser, Kamie; Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Nevers, Dawn Subject:Board Correspondence - FW: Delegated Order issued in FERC P-619-000 Date:Wednesday, October 30, 2024 5:01:45 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Tuesday, October 29, 2024 1:06 PM Subject: Delegated Order issued in FERC P-619-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 10/29/2024, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Delegated Order Description: Letter to Pacific Gas and Electric Company discussing the 05/31/2023 completion of Recommendation 4a from the 11th Part 12D Safety Inspection Report, etc. for the Grizzly Forebay Dam, part of the Bucks Creek Hydroelectric Project under P-619. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20241029- 3048__;!!KNMwiTCp4spf!BJxoPgjwoO- ZIrLuAm2XTTEyhCeLcCg24aYYl394GRGsOoUlOLNXVKm865_Gjogx4JJBdJPHCrzE0yHP- 7SlpLDpKym9wNPkPgP5$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!BJxoPgjwoO- ZIrLuAm2XTTEyhCeLcCg24aYYl394GRGsOoUlOLNXVKm865_Gjogx4JJBdJPHCrzE0yHP- 7SlpLDpKym9wMhmYkMm$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!BJxoPgjwoO- ZIrLuAm2XTTEyhCeLcCg24aYYl394GRGsOoUlOLNXVKm865_Gjogx4JJBdJPHCrzE0yHP- 7SlpLDpKym9wGwWS7CP$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections – San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 (415) 369-3300 October 29, 2024 In reply refer to: Project No. 619-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric Company 300 Lakeside Dr. Oakland, CA 94612-3534 Re: Recommendation 4a from the 11th Part 12D Safety Inspection Report and Follow-up Item 6 from the 2015 Annual Dam Safety Inspection Dear Mr. Cruzen: This is in response to a letter dated May 31, 2023, from Mr. Robert Ellis that notified this office of the completion of Recommendation 4a from the 11th Part 12D safety inspection report and the follow-up item 6 from the 2015 annual dam safety inspection at Grizzly Forebay Dam, which is part of the Bucks Creek Hydroelectric Project, FERC No. 619. We have reviewed your submittal, and we have no comments. The plan and schedule to repair the observed spallings at the upstream vertical joints and dam face by August 31, 2026, is acceptable. We appreciate your continued efforts in this aspect of our dam safety program. If you have any questions, please contact Ms. Eunhye Kim at (415) 369-3321. Sincerely, Frank L. Blackett, P.E. Regional Engineer Document Accession #: 20241029-3048 Filed Date: 10/29/2024 Frank L Blackett, P.E.Digitally signed by Frank L Blackett, P.E. Date: 2024.10.29 09:53:23 -07'00' 2 cc: Ms. Sharon Tapia, Division Manager CA Dept. of Water Resources Division of Safety of Dams P.O. Box 942836 Sacramento, CA 94236-0001 Document Accession #: 20241029-3048 Filed Date: 10/29/2024 Document Content(s) P-619-000 S61412_Compl 4a_11P12D_M.6_2015DSI_Grizzly.pdf .................1 Document Accession #: 20241029-3048 Filed Date: 10/29/2024