Loading...
HomeMy WebLinkAbout12.6.2024 Board Correspondence - FW_ Project Operations Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie Cc:Nuzum, Danielle Subject:Board Correspondence - FW: Project Operations Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. Date:Monday, December 9, 2024 4:59:02 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, December 6, 2024 5:26 AM Subject: Project Operations Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 12/6/2024, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company PG&E Corporation (as Agent) Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Project Operations Compliance Report Description: Pacific Gas and Electric Company submits response to address FERC's 11/08/2024 comment re the Hendricks Head Dam Repair Project of the DeSabla-Centerville Hydroelectric Project under P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist? accession_num=20241206-5007__;!!KNMwiTCp4spf!A76muhsqEudbRhU8iIByRJtYxxLBwfau_PZ7l- _saZ0UXH42GA4j3hPAjiFuBgmnayG8zP_hsUm7cLooIg6uDUn4uPn7dM0h5HXU$ To modify your subscriptions, click here: _saZ0UXH42GA4j3hPAjiFuBgmnayG8zP_hsUm7cLooIg6uDUn4uPn7dMpMmMuq$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!A76muhsqEudbRhU8iIByRJtYxxLBwfau_PZ7l- _saZ0UXH42GA4j3hPAjiFuBgmnayG8zP_hsUm7cLooIg6uDUn4uPn7dIS0HFRT$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 December 5, 2024 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA Hendricks Head Dam Repairs Response to FERC’s November 8, 2024, Comment Dear Frank L. Blackett: This letter presents Pacific Gas and Electric Company's (PG&E) response to address the Federal Energy Regulatory Commission’s (FERC) comments on Hendricks Head Dam Repair project, which is part of PG&E’s DeSabla-Centerville Hydroelectric Project, FERC No. 803. PG&E received FERC’s comments in a letter dated November 8, 2024. For reference, FERC’s comment is copied below, followed by PG&E's response (in italics). The proposed spillway repairs will require a consultation with the United States Fish and Wildlife Services (USFWS) under Section 7 of the Endangered Species Act. You must complete the Section 7 consultation and provide the consultation result to the Division of Hydropower Administration and Compliance. On September 26, 2024, PG&E respectfully requested FERC’s Division of Hydropower Administration and Compliance (DHAC) designate PG&E as its non-federal representative to conduct Section 7 consultation. On November 27, 2024, FERC issued a letter to the USFWS designating PG&E as FERC’s non-federal representative to conduct informal consultation with the USFWS. PG&E will begin consultation with the USFWS and file documentation with DHAC when available. PG&E understands that SFRO is unable to complete our review of the proposed improvement until SFRO receives the full record of the consultation with the USFWS. PG&E anticipates submitting the required documentation to FERC by April 30, 2025. Should you have technical questions concerning this matter, please contact Kaitlyn Daniels, dam safety engineer for PG&E, at (707) 342-7885. For general questions, please contact Sky Ramirez-Doble, license coordinator for PG&E, at (530) 250-7002. Sincerely, Matt Joseph Supervisor, Hydro License Management cc: via email Donald Ratcliff, USFWS - donald_ratcliff@fws.gov Brittany Reaves, USFWS - brittany_reaves@fws.gov Stephanie Millsap, USFWS - stephanie_millsap@fws.gov Document Accession #: 20241206-5007 Filed Date: 12/06/2024 Document Content(s) PGE20241205_803_Hendricks_Head_Dam_Repairs_R2C.pdf........................1 Document Accession #: 20241206-5007 Filed Date: 12/06/2024