Loading...
HomeMy WebLinkAbout11.25.2024 Board Correspondence - FW_ Dam Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie Cc:Nuzum, Danielle Subject:Board Correspondence - FW: Dam Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. Date:Thursday, December 5, 2024 4:49:35 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Monday, November 25, 2024 2:45 PM Subject: Dam Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 11/25/2024, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Pacific Gas & Electric Company (as Agent) Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Dam Safety Compliance Report Description: Pacific Gas and Electric Company submits response to FERC's 10/11/2024 comments re updated structural stability analyses re the Bucks Diversion Dam of the Bucks Creek Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20241125- 5235__;!!KNMwiTCp4spf!C11xlM0oIoO6qg9BUG3jqwFzlPBGI3vN0kj7shWNGWPPbbMNjorBIgWq5j_lQf1cNvipm8_ja76XakSYv3Ulu_7IrxgoU9RmbZ2e$ To modify your subscriptions, click here: ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!C11xlM0oIoO6qg9BUG3jqwFzlPBGI3vN0kj7shWNGWPPbbMNjorBIgWq5j_lQf1cNvipm8_ja76XakSYv3Ulu_7IrxgoU3yx-Hwu$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 November 25, 2024 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA Bucks Diversion Dam, NATDAM No. CA00331 Updated Structural Stability Analyses – Plan and Schedule for FERC Comments ENCLOSURE CONTAIN CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents Pacific Gas and Electric Company’s (PG&E) updated plan and schedule to address the Federal Energy Regulatory Commission’s (FERC) Comments (C-1 and C-2). C-1 provides a plan and schedule to address C-2 regarding the updated structural stability analyses for Bucks Diversion Dam, which is part of PG&E’s Bucks Creek Hydroelectric Project, FERC No. 619. PG&E provided the updated structural analyses report to FERC in a letter dated December 1, 2021. PG&E received FERC’s initial comments in a letter dated June 12, 2023, and responded to the comments in a letter to FERC dated February 29, 2024. PG&E received FERC’s subsequent comments (Comments 1 and 2) in a letter dated October 11, 2024. PG&E’s plan and schedule for Comment 2 is enclosed with this letter (Enclosure 1). Should you have technical questions concerning this matter, please contact Ben Fontana, senior dam safety engineer for PG&E, at (530) 762 -9459. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure: CUI//CEII – DO NOT RELEASE 1. Plan and Schedule for FERC Comments on the Updated Structural Stability Analyses Document Accession #: 20241125-5235 Filed Date: 11/25/2024 Document Content(s) PGE20241125_619_BucksDiv_Resp_to_2024_10-11_Ltr.pdf ......................1 Document Accession #: 20241125-5235 Filed Date: 11/25/2024