Loading...
HomeMy WebLinkAbout11.27.2024 Board Correspondence - FW_ FERC Correspondence With Government Agencies issued in FERC P-803-000From:Clerk of the Board To:BOS Cc:Nuzum, Danielle; Loeser, Kamie Subject:Board Correspondence - FW: FERC Correspondence With Government Agencies issued in FERC P-803-000 Date:Monday, December 2, 2024 9:23:13 AM Please see Board Correspondence below. -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Wednesday, November 27, 2024 8:55 AM Subject: FERC Correspondence With Government Agencies issued in FERC P-803-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 11/27/2024, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: FERC Correspondence With Government Agencies Description: Letter to U.S. Fish and Wildlife Service San Francisco Bay Delta Fish and Wildlife Office discussing the designation of non-federal representative to conduct informal consultation under Section 7 etc. re the DeSabla- Centerville River Project under P-803. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20241127- 3032__;!!KNMwiTCp4spf!CxxPxDJlYsXIGe4_NR6tAa0fWUgU75aSLGPgus50PDw9aq03nE865nSBYND7tWguggApJw_DC6RYQu3NTyvg6_4_FX3qbOWODEyJ$ To modify your subscriptions, click here: ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!CxxPxDJlYsXIGe4_NR6tAa0fWUgU75aSLGPgus50PDw9aq03nE865nSBYND7tWguggApJw_DC6RYQu3NTyvg6_4_FX3qbJwuXCF_$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Washington, D. C. 20426 OFFICE OF ENERGY PROJECTS Project Nos. 803-000--California DeSabla-Centerville Hydroelectric Project Pacific Gas and Electric Company November 27, 2024 VIA Electronic Mail Donald Ratcliff U.S. Fish and Wildlife Service, SF Bay Delta Fish and Wildlife Office 650 Capitol Mall, Suite 8-300 Sacramento, California 95814 donald_ratcliff@fws.gov Subject: Designation for non-federal representative to conduct informal consultation under Section 7 of the Endangered Species Act. Dear Mr. Ratcliff: By letter dated September 26, 2024, Pacific Gas and Electric Company, licensee for the DeSabla-Centerville Hydroelectric Project No. 803,1 requested designation as the Commission’s non-federal representative for the purpose of informal consultation with the U.S. Fish and Wildlife Service (FWS), pursuant to section 7 of the Endangered Species Act (ESA).2 The DeSabla-Centerville Project is located is located on Butte Creek and the West Branch Feather River (WBFR) in Butte County, California. The licensee requests designation in support of necessary spillway repairs at the Hendricks Head dam. This work is necessary following a 2019 dam safety inspection.3 1 Pacific Gas and Electric Company, 11 FERC ¶ 62,207 (1980). 2 The licensee’s designation request can be accessed by following this link: https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20240926-5065 3 The Commission letter to PG&E can be accessed by following this link: https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20191015-3028 Document Accession #: 20241127-3032 Filed Date: 11/27/2024 Project Nos. 803-000 - 2 - The licensee notes that informal consultation is necessary due to the potential impacts to the listed foothill yellow-legged frog (Rana boylii). By this letter, we designate the licensee as our non-federal representative for the purpose of conducting informal consultation with the FWS pursuant to the regulations at 50 C.F.R.§ 402.08 implementing section 7 of the ESA. The role of the non-federal representative may include conducting studies, developing and supplying information, attending meetings, ensuring that pertinent endangered species information is maintained in a project file, participating in informal consultation with FWS and NMFS, developing a draft biological assessment if necessary, and keeping the Commission apprised of its actions. However, the Commission remains ultimately responsible for all findings and determinations regarding the effects of the project on any federally-listed species or critical habitat. We appreciate your assistance with ESA consultation regarding Hendricks Head dam spillway repair project at the project. If you have any questions regarding this matter, please contact Kelly Fitzpatrick at (202) 502-8435 or by email at Kelly.Fitzpatrick@ferc.gov. Sincerely, for Jot Splenda, Chief Environmental and Project Review Branch Division of Hydropower Administration and Compliance cc: VIA Electronic Mail Brittany Reaves U.S. Fish and Wildlife Service, SF Bay Delta Fish and Wildlife Office 650 Capitol Mall, Suite 8-300 Sacramento, California 95814 brittany_reaves@fws.gov Stephanie Millsap U.S. Fish and Wildlife Service, SF Bay Delta Fish and Wildlife Office 650 Capitol Mall, Suite 8-300 Sacramento, California 95814 stephanie_millsap@fws.gov Document Accession #: 20241127-3032 Filed Date: 11/27/2024 ELIZABETH OSIER MOATS Digitally signed by ELIZABETH OSIER MOATS Date: 2024.11.27 11:20:19 -05'00' Document Content(s) P-803-000_nonfed letter.pdf...............................................1 Document Accession #: 20241127-3032 Filed Date: 11/27/2024