Loading...
HomeMy WebLinkAbout11.21.2024 Board Correspondence FW_ General Correspondence issued in FERC P-803-000From:Clerk of the Board To:BOS; Loeser, Kamie Subject:Board Correspondence FW: General Correspondence issued in FERC P-803-000 Date:Friday, November 22, 2024 10:41:16 AM Please see Board Correspondence. -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Thursday, November 21, 2024 3:45 PM Subject: General Correspondence issued in FERC P-803-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 11/21/2024, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: General Correspondence Description: Letter to Pacific Gas and Electric Company providing a comment on the 07/10/2024 revised Quality Control and Inspection Program for road repairs at the DeSabla Powerhouse, part of the DeSabla-Centerville Hydroelectric Project under P- 803. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist? accession_num=20241121-3123__;!!KNMwiTCp4spf!GtrdWtdDAZEyha9YChjaBVlK-_y24KIapF8SrKvWq_XujCVQ-p4yy- h4RxWdwQnHV12Kf6ByDSONOPv8hXuIH3HdoUV7de_081zc$ To modify your subscriptions, click here: _y24KIapF8SrKvWq_XujCVQ-p4yy-h4RxWdwQnHV12Kf6ByDSONOPv8hXuIH3HdoUV7dbTWiay6$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!GtrdWtdDAZEyha9YChjaBVlK- _y24KIapF8SrKvWq_XujCVQ-p4yy-h4RxWdwQnHV12Kf6ByDSONOPv8hXuIH3HdoUV7ddzGBzp3$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections – San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 (415) 369-3300 November 21, 2024 In reply refer to: Project No. 803-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric Company 300 Lakeside Dr. Oakland, CA 94612-3534 Re: Quality Control and Inspection Program for Road Repair for DeSabla Powerhouse Dear Mr. Cruzen: This is in response to a letter dated July 10, 2024 from Mr. Kyle Ingvoldsen that submitted a revised Quality Control and Inspection Program for road repairs at the DeSabla Powerhouse, which is part of the DeSabla-Centerville Hydroelectric Project, FERC Project No. 803. We have reviewed the submittal, and we have the following comment: • In our July 5, 2024 letter we provided conditional authorization for road repairs at the DeSabla Powerhouse based on information provided in your April 11, 2024 authorization request. Our comment requested the missing resume for Mr. Welty shown as having stop authority in the Quality Control Inspection Program (QCIP). As part of your response to address our conditional authorization comment, you proposed a replacement inspector in lieu of providing the missing resume for Mr. Welty. Note that any replacement of a QCIP team member must be reviewed and accepted by us prior to them performing that role in the field. This applies to all future submittals that involve changes to QCIP team members after construction has been authorized. No response is required for this comment. Document Accession #: 20241121-3123 Filed Date: 11/21/2024 2 We appreciate your continued efforts in this aspect of our dam safety program. If you have any questions, contact Ms. Eunhye Kim at (415) 369-3321. Sincerely, Frank L. Blackett, P.E. Regional Engineer cc: Ms. Sharon Tapia, Division Manager CA Dept. of Water Resources Division of Safety of Dams P.O. Box 942836 Sacramento, CA 94236-0001 Document Accession #: 20241121-3123 Filed Date: 11/21/2024 Frank L Blackett, P.E.Digitally signed by Frank L Blackett, P.E. Date: 2024.11.21 13:14:26 -08'00' Document Content(s) P-803-000 S65618_DS PH Road Repair_QCIP.pdf...............................1 Document Accession #: 20241121-3123 Filed Date: 11/21/2024