Loading...
HomeMy WebLinkAbout04.24.26 Board Correspondence - FW_ Project Operations Compliance Report submitted in FERC P-619-179 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Project Operations Compliance Report submitted in FERC P-619-179 by Pacific Gas and Electric Company Date:Friday, April 24, 2026 1:19:27 PM Please see Board Correspondence - Lewis Lee Administrative Technician - Confidential Butte County Administration 25 County Center Drive, Suite 200 • Oroville, CA 95965 T: 530.552.3326 www.buttecounty.ca.gov | lelee@buttecounty.ca.gov -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, April 24, 2026 12:46 PM Subject: Project Operations Compliance Report submitted in FERC P-619-179 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 4/24/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-619-179 Lead Applicant: Pacific Gas and Electric Company Filing Type: Project Operations Compliance Report Drawing/Maps Description: Pacific Gas and Electric Company submits final approved Exhibit G drawings re the Bucks Creek Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260424- 5207__;!!KNMwiTCp4spf!GVn6FgfOLKgDgKIAln9Khc70bOKVOcR1_4bMSuspdv4OAjCQmpGuuU5wdIn6ceT5ogcmGjDHrecrWKteDkaxecdvkIqa5OsYK_HV$ To modify your subscriptions, click here: ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!GVn6FgfOLKgDgKIAln9Khc70bOKVOcR1_4bMSuspdv4OAjCQmpGuuU5wdIn6ceT5ogcmGjDHrecrWKteDkaxecdvkIqa5IbkLBtR$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 April 24, 2026 Via Electronic Submittal (E-File) Debbie-Anne Reese, Secretary ATTN: OEP/DHAC Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 RE: Bucks Creek Hydroelectric Project, FERC No. 619-179 Final Exhibit G Drawings, GIS Data Files, Form FERC-587 and Statement of Federal Lands Dear Secretary Reese: This letter transmits the final approved Exhibit G drawings for Pacific Gas and Electric Company’s (PG&E) Bucks Creek Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619. Pursuant to FERC’s order dated March 11, 2026, which approved Exhibits G and F, PG&E has prepared and is submitting the final stamped exhibit G drawings (Enclosure 1-10), associated geographic information system (GIS) data in electronic file format (Enclosure 11), and FERC Form-587’s, as directed. PG&E provided the Bureau of Land Management (BLM) Form FERC-587s on April 23, 2026, via email. Please find the enclosed complete list of ten (10) Exhibit G drawings updated to conform to 18 CFR § 4.39 and 18 CFR § 4.41 (h), including: • P-619-1001, G-1, General Map, 03-11-2026 • P-619-1002, G-2, East Portion of Bucks Lake, 03-11-2026 • P-619-1003, G-3, North Portion of Bucks Lake, 03-11-2026 • P-619-1004, G-4, South Portion of Bucks Lake, 03-11-2026 • P-619-1005, G-5, Lower Bucks Lake Tunnel, 03-11-2026 • P-619-1006, G-6, Lower Bucks Lake, South Milk Ranch Conduit, 03-11-2026 • P-619-1007, G-7, Milk Ranch Conduit, 03-11-2026 • P-619-1008, G-8, Three Lakes, Milk Ranch Conduit, 03-11-2026 • P-619-1009, G-9, Grizzly Tunnel, Access Roads, 03-11-2026 • P-619-1010, G-10, Bucks Creek Powerhouse, Grizzly Tunnel, Access Roads, 03-11-2 026 Debbie-Anne Reese, Secretary April 24, 2026 Page 2 Article 205 of the license requires the licensees to file documentation of the amount of federal land occupied by the project. Please see Exhibit G-1 for the area of federal land occupied, this acreage was also provided in the revised Exhibit A which was filed with FERC on April 23, 2026. If you have questions or comments regarding this matter, please contact Trevor Moore, senior license coordinator for PG&E, at (530) 2 05-7345. Sincerely, Matthew Joseph Supervisor, Hydroelectric License Compliance Enclosures: 1. P-619-1001, G-1, General Map, 03-11-2026 2. P-619-1002, G-2, East Portion of Bucks Lake, 03-11-2026 3. P-619-1003, G-3, North Portion of Bucks Lake, 03-11-2026 4. P-619-1004, G-4, South Portion of Bucks Lake, 03-11-2026 5. P-619-1005, G-5, Lower Bucks Lake Tunnel, 03-11-2026 6. P-619-1006, G-6, Lower Bucks Lake, South Milk Ranch Conduit, 03-11-2026 7. P-619-1007, G-7, Milk Ranch Conduit, 03-11-2026 8. P-619-1008, G-8, Three Lakes, Milk Ranch Conduit, 03-11-2026 9. P-619-1009, G-9, Grizzly Tunnel, Access Roads, 03-11-2026 10. P-619-1010 G-10, Bucks Creek Powerhouse, Grizzly Tunnel, Access Roads , 03-11-2026 11. GIS data files for P-619, G-1 through G-10 12. FERC Form 587s cc: via email w/enclosures Valentina Guzman, City of Santa Clara – vguzman@santaclaraca.gov Diane Asuncion, City of Santa Clara - dasuncion@santaclaraca.gov