HomeMy WebLinkAbout04.24.26 Board Correspondence - FW_ Project Operations Compliance Report submitted in FERC P-619-179 by Pacific Gas and Electric CompanyFrom:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug;
Zepeda, Elizabeth
Cc:Loeser, Kamie; Cannon, Jamie
Subject:Board Correspondence - FW: Project Operations Compliance Report submitted in FERC P-619-179 by Pacific Gas and Electric Company
Date:Friday, April 24, 2026 1:19:27 PM
Please see Board Correspondence -
Lewis Lee
Administrative Technician - Confidential
Butte County Administration
25 County Center Drive, Suite 200 • Oroville, CA 95965
T: 530.552.3326
www.buttecounty.ca.gov | lelee@buttecounty.ca.gov
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Friday, April 24, 2026 12:46 PM
Subject: Project Operations Compliance Report submitted in FERC P-619-179 by Pacific Gas and Electric Company
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 4/24/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company
Docket(s): P-619-179
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Project Operations Compliance Report
Drawing/Maps
Description: Pacific Gas and Electric Company submits final approved Exhibit G drawings re the Bucks Creek Hydroelectric Project under P-619.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260424-
5207__;!!KNMwiTCp4spf!GVn6FgfOLKgDgKIAln9Khc70bOKVOcR1_4bMSuspdv4OAjCQmpGuuU5wdIn6ceT5ogcmGjDHrecrWKteDkaxecdvkIqa5OsYK_HV$
To modify your subscriptions, click here:
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!GVn6FgfOLKgDgKIAln9Khc70bOKVOcR1_4bMSuspdv4OAjCQmpGuuU5wdIn6ceT5ogcmGjDHrecrWKteDkaxecdvkIqa5IbkLBtR$
or for phone support, call 866-208-3676.
Power Generation
300 Lakeside Drive
Oakland, CA 94612
Mailing Address:
P.O. Box 28209
Oakland, CA 94604
April 24, 2026
Via Electronic Submittal (E-File)
Debbie-Anne Reese, Secretary
ATTN: OEP/DHAC
Federal Energy Regulatory Commission
888 First Street, NE
Washington, DC 20426
RE: Bucks Creek Hydroelectric Project, FERC No. 619-179
Final Exhibit G Drawings, GIS Data Files, Form FERC-587 and Statement of
Federal Lands
Dear Secretary Reese:
This letter transmits the final approved Exhibit G drawings for Pacific Gas and Electric
Company’s (PG&E) Bucks Creek Hydroelectric Project, Federal Energy Regulatory
Commission (FERC) No. 619.
Pursuant to FERC’s order dated March 11, 2026, which approved Exhibits G and F, PG&E
has prepared and is submitting the final stamped exhibit G drawings (Enclosure 1-10),
associated geographic information system (GIS) data in electronic file format (Enclosure 11),
and FERC Form-587’s, as directed. PG&E provided the Bureau of Land Management (BLM)
Form FERC-587s on April 23, 2026, via email.
Please find the enclosed complete list of ten (10) Exhibit G drawings updated to conform to
18 CFR § 4.39 and 18 CFR § 4.41 (h), including:
• P-619-1001, G-1, General Map, 03-11-2026
• P-619-1002, G-2, East Portion of Bucks Lake, 03-11-2026
• P-619-1003, G-3, North Portion of Bucks Lake, 03-11-2026
• P-619-1004, G-4, South Portion of Bucks Lake, 03-11-2026
• P-619-1005, G-5, Lower Bucks Lake Tunnel, 03-11-2026
• P-619-1006, G-6, Lower Bucks Lake, South Milk Ranch Conduit, 03-11-2026
• P-619-1007, G-7, Milk Ranch Conduit, 03-11-2026
• P-619-1008, G-8, Three Lakes, Milk Ranch Conduit, 03-11-2026
• P-619-1009, G-9, Grizzly Tunnel, Access Roads, 03-11-2026
• P-619-1010, G-10, Bucks Creek Powerhouse, Grizzly Tunnel, Access Roads, 03-11-2
026
Debbie-Anne Reese, Secretary
April 24, 2026
Page 2
Article 205 of the license requires the licensees to file documentation of the amount of federal
land occupied by the project. Please see Exhibit G-1 for the area of federal land occupied,
this acreage was also provided in the revised Exhibit A which was filed with FERC on April
23, 2026.
If you have questions or comments regarding this matter, please contact Trevor Moore,
senior license coordinator for PG&E, at (530) 2 05-7345.
Sincerely,
Matthew Joseph
Supervisor, Hydroelectric License Compliance
Enclosures:
1. P-619-1001, G-1, General Map, 03-11-2026
2. P-619-1002, G-2, East Portion of Bucks Lake, 03-11-2026
3. P-619-1003, G-3, North Portion of Bucks Lake, 03-11-2026
4. P-619-1004, G-4, South Portion of Bucks Lake, 03-11-2026
5. P-619-1005, G-5, Lower Bucks Lake Tunnel, 03-11-2026
6. P-619-1006, G-6, Lower Bucks Lake, South Milk Ranch Conduit, 03-11-2026
7. P-619-1007, G-7, Milk Ranch Conduit, 03-11-2026
8. P-619-1008, G-8, Three Lakes, Milk Ranch Conduit, 03-11-2026
9. P-619-1009, G-9, Grizzly Tunnel, Access Roads, 03-11-2026
10. P-619-1010 G-10, Bucks Creek Powerhouse, Grizzly Tunnel, Access Roads , 03-11-2026
11. GIS data files for P-619, G-1 through G-10
12. FERC Form 587s
cc: via email w/enclosures