Loading...
HomeMy WebLinkAbout04.24.26 Board Correspondence - FW_ Request for Delay of Action_Extension of Time submitted in FERC P-803-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Request for Delay of Action/Extension of Time submitted in FERC P-803-000 by Pacific Gas and Electric Company Date:Friday, April 24, 2026 1:19:45 PM Please see Board Correspondence - Lewis Lee Administrative Technician - Confidential Butte County Administration 25 County Center Drive, Suite 200 • Oroville, CA 95965 T: 530.552.3326 www.buttecounty.ca.gov | lelee@buttecounty.ca.gov -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, April 24, 2026 12:46 PM Subject: Request for Delay of Action/Extension of Time submitted in FERC P-803-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 4/24/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Request for Delay of Action/Extension of Time Description: Pacific Gas and Electric Company submits request for an extension of time until 06/15/2027 to address Recommendation 2b from the second Part 12D Safety Inspection Report re the Round Valley Dam of the DeSabla-Centerville Project under P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260424- 5226__;!!KNMwiTCp4spf!CyWFlIHnsTLum7kCKxjHyki0X53umUAlO9XzfhMsEclJc5PIw-1cIRRRIEGcj4oE8SVGQd6rt-VxRiVAZ3_bjqmD9MWiHDH- izPZ$ To modify your subscriptions, click here: 1cIRRRIEGcj4oE8SVGQd6rt-VxRiVAZ3_bjqmD9MWiHMQqwD7u$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!CyWFlIHnsTLum7kCKxjHyki0X53umUAlO9XzfhMsEclJc5PIw- 1cIRRRIEGcj4oE8SVGQd6rt-VxRiVAZ3_bjqmD9MWiHCMOLLlV$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 April 24, 2026 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA Round Valley Dam, NATDAM No. CA00346 Second Part 12D Inspection – Recommendation 2b Extension of Time Request ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents Pacific Gas and Electric Company’s (PG&E) request for an extension of time to address Recommendation 2b (R-2b) from the second Part 12D safety inspection report for Round Valley Dam, which is part of PG&E’s DeSabla-Centerville Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 803. Included with PG&E’s extension of time request is a reasoned basis for the request, per Title 18 of the Code of Federal Regulations, Section 12.40(d). PG&E sent its most recent update in a letter dated July 28, 2023. The extension of time request and reason for the request are enclosed with this letter (Enclosure 1). Should you have technical questions concerning this matter, please contact Isabelle Rawlings, senior dam safety engineer for PG&E, at (925) 359 -5420. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure: CUI//CEII – DO NOT RELEASE 1. Extension of Time Request for Recommendation 2b from the Second Part 12D Safety Inspection Report