HomeMy WebLinkAbout04.24.26 Board Correspondence - FW_ Request for Delay of Action_Extension of Time submitted in FERC P-803-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little,
Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth
Cc:Loeser, Kamie; Cannon, Jamie
Subject:Board Correspondence - FW: Request for Delay of Action/Extension of Time submitted in FERC P-803-000 by Pacific Gas and Electric Company
Date:Friday, April 24, 2026 1:19:45 PM
Please see Board Correspondence -
Lewis Lee
Administrative Technician - Confidential
Butte County Administration
25 County Center Drive, Suite 200 • Oroville, CA 95965
T: 530.552.3326
www.buttecounty.ca.gov | lelee@buttecounty.ca.gov
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Friday, April 24, 2026 12:46 PM
Subject: Request for Delay of Action/Extension of Time submitted in FERC P-803-000 by Pacific Gas and Electric Company
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 4/24/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company
Docket(s): P-803-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Request for Delay of Action/Extension of Time
Description: Pacific Gas and Electric Company submits request for an extension of time until 06/15/2027 to address Recommendation 2b from the second Part
12D Safety Inspection Report re the Round Valley Dam of the DeSabla-Centerville Project under P-803.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260424-
5226__;!!KNMwiTCp4spf!CyWFlIHnsTLum7kCKxjHyki0X53umUAlO9XzfhMsEclJc5PIw-1cIRRRIEGcj4oE8SVGQd6rt-VxRiVAZ3_bjqmD9MWiHDH-
izPZ$
To modify your subscriptions, click here:
1cIRRRIEGcj4oE8SVGQd6rt-VxRiVAZ3_bjqmD9MWiHMQqwD7u$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!CyWFlIHnsTLum7kCKxjHyki0X53umUAlO9XzfhMsEclJc5PIw-
1cIRRRIEGcj4oE8SVGQd6rt-VxRiVAZ3_bjqmD9MWiHCMOLLlV$
or for phone support, call 866-208-3676.
Power Generation
300 Lakeside Drive
Oakland, CA 94612
Mailing Address:
P.O. Box 28209
Oakland, CA 94604
April 24, 2026
Via Electronic Submittal (E-File)
Frank L. Blackett, P.E., Regional Engineer
Federal Energy Regulatory Commission
Division of Dam Safety and Inspections
100 First Street, Suite 2300
San Francisco, CA 94105-3084
RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA
Round Valley Dam, NATDAM No. CA00346
Second Part 12D Inspection – Recommendation 2b
Extension of Time Request
ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE
Dear Frank L. Blackett:
This letter presents Pacific Gas and Electric Company’s (PG&E) request for an extension
of time to address Recommendation 2b (R-2b) from the second Part 12D safety inspection
report for Round Valley Dam, which is part of PG&E’s DeSabla-Centerville Hydroelectric
Project, Federal Energy Regulatory Commission (FERC) No. 803. Included with PG&E’s
extension of time request is a reasoned basis for the request, per Title 18 of the Code of
Federal Regulations, Section 12.40(d). PG&E sent its most recent update in a letter dated
July 28, 2023.
The extension of time request and reason for the request are enclosed with this letter
(Enclosure 1).
Should you have technical questions concerning this matter, please contact Isabelle
Rawlings, senior dam safety engineer for PG&E, at (925) 359 -5420. For general questions,
please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990.
Sincerely,
Robert O. Ellis, P.E., G.E.
Deputy Chief Dam Safety Engineer
Enclosure: CUI//CEII – DO NOT RELEASE
1. Extension of Time Request for Recommendation 2b from the Second Part 12D Safety
Inspection Report