Loading...
HomeMy WebLinkAbout04.27.26 Board Correspondence - FW_ Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company Date:Monday, April 27, 2026 4:14:06 PM Please see Board Correspondence - Lewis Lee Administrative Technician - Confidential Butte County Administration 25 County Center Drive, Suite 200 • Oroville, CA 95965 T: 530.552.3326 www.buttecounty.ca.gov | lelee@buttecounty.ca.gov -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Monday, April 27, 2026 12:46 PM Subject: Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 4/27/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Project Operations Compliance Report Drawing/Maps Description: Pacific Gas and Electric Company submits final approved Exhibit F Drawings re the Bucks Creek Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260427- 5205__;!!KNMwiTCp4spf!BVPoHclZbXULt0j7oil3bagWnJnO2usxF4JZ4wcgeQPsjvcnL3YrcTrnVKOWd9vdA_eVEkrclAo5SeCeFZbF6RoUeYE2wIDFaeM9$ To modify your subscriptions, click here: ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!BVPoHclZbXULt0j7oil3bagWnJnO2usxF4JZ4wcgeQPsjvcnL3YrcTrnVKOWd9vdA_eVEkrclAo5SeCeFZbF6RoUeYE2wP_dxzdj$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 April 27, 2026 Via Electronic Submittal (E-File) Debbie-Anne Reese, Secretary ATTN: OEP/DHAC Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA Submission of Finalized Approved Exhibit F Drawings ENCLOSURES CONTAIN CUI//CEII - DO NOT RELEASE Dear Secretary Reese: This letter transmits the final approved Exhibit F drawings for Pacific Gas and Electric Company’s (PG&E) Bucks Creek Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619. Pursuant to FERC’s order dated March 11, 2026, which approved Exhibits G and F, PG&E has prepared and is submitting the finalized digital image of the approved Exhibit F drawings. Please find enclosed the complete list of thirteen (13) Exhibit F drawings including: • P-619-1011, Exhibit F-1, Plans and Section Intake Structure Grizzly Powerhouse • P-619-1012, Exhibit F-2, Plans and Section Tunnel, Surge Tank & Portal Grizzly Powerhouse • P-619-1013, Exhibit F-3, Plans and Section Grizzly Powerhouse • P-619-1014, Exhibit F-4, Sections of Intakes, Tunnels and Surge Chamber Lower Bucks Lake and Grizzly Forebay • P-619-1015, Exhibit F-5, Plans and Section Grizzly Powerhouse • P-619-1016, Exhibit F-6, Dam and Spillway Three Lakes • P-619-1017, Exhibit F-7, Dam and Spillway Bucks Lake • P-619-1018, Exhibit F-8, Dam and Spillway Lower Bucks Lake • P-619-1019, Exhibit F-9, Dam and Spillway Grizzly Forebay • P-619-1020, Exhibit F-10, Profile of Grizzly Tunnel • P-619-1021, Exhibit F-11, Profile Penstock Grizzly Powerhouse Debbie-Anne Reese, Secretary April 27, 2026 Page 2 • P-619-1022, Exhibit F-12, Profile of Tunnels • P-619-1023, Exhibit F-13, Profile of Penstocks If you have questions or comments regarding this matter, please contact Trevor Moore, senior license coordinator for PG&E, at (530) 205 -7345. Sincerely, Matthew Joseph Supervisor, Hydroelectric License Compliance Enclosures: CUI//CEII – DO NOT RELEASE 1. P-619-1011, Exhibit F-1, Plans and Section Intake Structure Grizzly Powerhouse, 03- 11-2026 2. P-619-1012, Exhibit F-2, Plans and Section Tunnel, Surge Tank & Portal Grizzly Powerhouse, 03-11-2026 3. P-619-1013, Exhibit F-3, Plans and Section Grizzly Powerhouse, 03-11-2026 4. P-619-1014, Exhibit F-4, Sections of Intakes, Tunnels and Surge Chamber Lower Bucks Lake and Grizzly Forebay, 03-11-2026 5. P-619-1015, Exhibit F-5, Plans and Section Grizzly Powerhouse, 03-11-2026 6. P-619-1016, Exhibit F-6, Dam and Spillway Three Lakes, 03-11-2026 7. P-619-1017, Exhibit F-7, Dam and Spillway Bucks Lake, 03-11-2026 8. P-619-1018, Exhibit F-8, Dam and Spillway Lower Bucks Lake, 03-11-2026 9. P-619-1019, Exhibit F-9, Dam and Spillway Grizzly Forebay, 03-11-2026 10. P-619-1020, Exhibit F-10, Profile of Grizzly Tunnel, 03-11-2026 11. P-619-1021, Exhibit F-11, Profile Penstock Grizzly Powerhouse, 03-11-2026 12. P-619-1022, Exhibit F-12, Profile of Tunnels, 03-11-2026 13. P-619-1023, Exhibit F-13, Profile of Penstocks, 03-11-2026 cc: via email w/o enclosures Valentina Guzman, City of Santa Clara – vguzman@santaclaraca.gov Diane Asuncion, City of Santa Clara - dasuncion@santaclaraca.gov