HomeMy WebLinkAbout04.15.26 Board Correspondence - FW_ BCF Board Minutes March 10, 2026.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening
attachments, clicking on links, or replying..
From:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod;
Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.;
Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth
Subject:Board Correspondence - FW: BCF Board Minutes March 10, 2026
Date:Wednesday, April 15, 2026 4:29:35 PM
Attachments:BCF Board Minutes March 10.2026.pdf
image001.png
Please see Board Correspondence -
Lewis LeeAdministrative Technician - ConfidentialButte County Administration25 County Center Drive, Suite 200 • Oroville, CA 95965T: 530.552.3326www.buttecounty.ca.gov | lelee@buttecounty.ca.gov
From: Vanessa Wilson <admin@buttecountyfair.org>
Sent: Wednesday, April 15, 2026 2:15 PM
To: Clerk of the Board <clerkoftheboard@buttecounty.ca.gov>
Subject: BCF Board Minutes March 10, 2026
Please see the attached board meeting minutes from March 10, 2026.
Thank you,
Vanessa M. Wilson
Administrative Assistant
Butte County Fair Association
Office: 530 846-3626
Cell: 530 282-8635
"Strive not to be a success but rather to be of value"
-A. Einstein
Power Generation
300 Lakeside Drive
Oakland, CA 94612
Mailing Address:
P.O. Box 28209
Oakland, CA 94604
April 15, 2026
Via Electronic Submittal (E-File)
Frank L. Blackett, P.E., Regional Engineer
Federal Energy Regulatory Commission
Division of Dam Safety and Inspections
100 First Street, Suite 2300
San Francisco, CA 94105-3084
RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA
DSSMP/R Submittal for 2025 Record Year
ENCLOSURES CONTAIN CUI//CEII – DO NOT RELEASE
Dear Frank L. Blackett:
This letter presents Pacific Gas and Electric Company’s (PG&E) combined dam safety
surveillance and monitoring plans and reports (DSSMP/Rs) (Enclosure 1) for the 20 25
record year for the Bucks Creek Hydroelectric Project, Federal Energy Regulatory
Commission (FERC) No. 619. The reports provided with this submittal cover surveillance
and monitoring activities at the following dams:
• Bucks Diversion Dam, NATDAM No. CA00331
• Bucks Storage Dam, NATDAM No. CA00332
• Grizzly Forebay Dam, NATDAM No. CA00333
In accordance with Chapter 14, Appendix K, of FERC’s Engineering Guidelines for the
Evaluation of Hydropower Projects, the DSSMP/Rs include statements from PG&E’s Chief
Dam Safety Engineer regarding the safety of the dams listed above for continued
operation. A table listing regulatory follow-up actions that PG&E considers resolved with
submittal of these DSSMP/Rs is included in (Enclosure 2). In a letter to FERC dated March
26, 2026, PG&E requested an extension of time to April 30, 2026 to submit the enclosed
DSSMP/Rs.
PG&E typically begins preparing DSSMP/Rs about 6 months before they are due to FERC.
To maintain PG&E’s schedule for coordinating and compiling the DSSMP/Rs and allow
FERC’s comments to be incorporated in future reports, PG&E must receive timely
feedback. To facilitate completion of PG&E’s DSSMP/Rs for the 2025 record year, PG&E
respectfully requests that FERC return all comments on the 2025 DSSMP/Rs by
September 30, 2026.
Frank L. Blackett, P.E. Regional Engineer
April 15, 2026
Page 2
Should you have technical questions concerning this matter, please contact Ben Fontana,
senior dam safety engineer for PG&E, at (530) 762 -9459. For general questions, please
contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990.