Loading...
HomeMy WebLinkAbout04.15.26 Board Correspondence - FW_ BCF Board Minutes March 10, 2026.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Subject:Board Correspondence - FW: BCF Board Minutes March 10, 2026 Date:Wednesday, April 15, 2026 4:29:35 PM Attachments:BCF Board Minutes March 10.2026.pdf image001.png Please see Board Correspondence - Lewis LeeAdministrative Technician - ConfidentialButte County Administration25 County Center Drive, Suite 200 • Oroville, CA 95965T: 530.552.3326www.buttecounty.ca.gov | lelee@buttecounty.ca.gov From: Vanessa Wilson <admin@buttecountyfair.org> Sent: Wednesday, April 15, 2026 2:15 PM To: Clerk of the Board <clerkoftheboard@buttecounty.ca.gov> Subject: BCF Board Minutes March 10, 2026 Please see the attached board meeting minutes from March 10, 2026. Thank you, Vanessa M. Wilson Administrative Assistant Butte County Fair Association Office: 530 846-3626 Cell: 530 282-8635 "Strive not to be a success but rather to be of value" -A. Einstein Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 April 15, 2026 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA DSSMP/R Submittal for 2025 Record Year ENCLOSURES CONTAIN CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents Pacific Gas and Electric Company’s (PG&E) combined dam safety surveillance and monitoring plans and reports (DSSMP/Rs) (Enclosure 1) for the 20 25 record year for the Bucks Creek Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619. The reports provided with this submittal cover surveillance and monitoring activities at the following dams: • Bucks Diversion Dam, NATDAM No. CA00331 • Bucks Storage Dam, NATDAM No. CA00332 • Grizzly Forebay Dam, NATDAM No. CA00333 In accordance with Chapter 14, Appendix K, of FERC’s Engineering Guidelines for the Evaluation of Hydropower Projects, the DSSMP/Rs include statements from PG&E’s Chief Dam Safety Engineer regarding the safety of the dams listed above for continued operation. A table listing regulatory follow-up actions that PG&E considers resolved with submittal of these DSSMP/Rs is included in (Enclosure 2). In a letter to FERC dated March 26, 2026, PG&E requested an extension of time to April 30, 2026 to submit the enclosed DSSMP/Rs. PG&E typically begins preparing DSSMP/Rs about 6 months before they are due to FERC. To maintain PG&E’s schedule for coordinating and compiling the DSSMP/Rs and allow FERC’s comments to be incorporated in future reports, PG&E must receive timely feedback. To facilitate completion of PG&E’s DSSMP/Rs for the 2025 record year, PG&E respectfully requests that FERC return all comments on the 2025 DSSMP/Rs by September 30, 2026. Frank L. Blackett, P.E. Regional Engineer April 15, 2026 Page 2 Should you have technical questions concerning this matter, please contact Ben Fontana, senior dam safety engineer for PG&E, at (530) 762 -9459. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosures: CUI//CEII – DO NOT RELEASE 1. DSSMP/Rs (3) 2. Completed Comments and Recommendations buttecountyfair.org