Loading...
HomeMy WebLinkAbout04.20.26 Board Correspondence - FW_ Compliance Directives issued in FERC P-619-000From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Compliance Directives issued in FERC P-619-000 Date:Monday, April 20, 2026 8:42:36 AM Please see Board Correspondence - Lewis Lee Administrative Technician - Confidential Butte County Administration 25 County Center Drive, Suite 200 • Oroville, CA 95965 T: 530.552.3326 www.buttecounty.ca.gov | lelee@buttecounty.ca.gov -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Monday, April 20, 2026 8:37 AM Subject: Compliance Directives issued in FERC P-619-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 4/20/2026, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Compliance Directives General Correspondence Description: Letter to Pacific Gas and Electric Company providing a comment on the 02/27/26 request for an extension of time to respond to FERC's comments on the 2021 Emergency Action Plan Reprint for the Three Lakes Dam et al., parts of the Bucks Creek Proj., P-619. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260420- 3023__;!!KNMwiTCp4spf!Btp_TJyyylEvXbqt_tW3XuM4ZqnLqcZITQZfmA3_wrRyqowtu-7AaIp7wkp-cVybE4tXSpG- L3jxZkXhu8kfv3Vw2P0TXuKeQIcR$ To modify your subscriptions, click here: 7AaIp7wkp-cVybE4tXSpG-L3jxZkXhu8kfv3Vw2P0TXifVZ_kW$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!Btp_TJyyylEvXbqt_tW3XuM4ZqnLqcZITQZfmA3_wrRyqowtu- 7AaIp7wkp-cVybE4tXSpG-L3jxZkXhu8kfv3Vw2P0TXv96Xn1G$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections –San Francisco Regional Office April 20, 2026 In reply refer to: Project No. 619-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric Company 300 Lakeside Dr. Oakland, CA 94612-3534 Re:Response to FERC Comments 1 through 8 Dear Mr. Cruzen: This is in response to a letter dated February 27, 2026 from Mr. Robert Ellis that submitted a request for an extension of time to respond to our comments on the 2021 Emergency Action Plan (EAP) Reprint for Three Lakes Dam, Bucks Lake Dam, Lower Bucks Lake Dam, and Grizzly Forebay Dam, which are parts of the Bucks Creek Project, FERC No. 619.We have reviewed your submittal, and we have a following comment. Your request for an extension of time to address Comments 1 through 8 (C-1 through C-8)is excessive.Most of the comments in our letter are related to the evaluation of the hazard potential for Three Lakes Dam. Your reason for delaying your response is to use a broader watershed-wide inundation model, and yet you provide limited information about your planned effort, and whether our comments would actually be addressed by January 15, 2030. This delay leaves the status of the hazard potential of the project unclear for an unacceptable length of time. Therefore, you must address our comments sooner, or provide reasonable public and dam safety justification to postpone the determination of the appropriate hazard potential of the project while waiting to use a broader watershed-wide inundation model study. Within 45 days of the date of this letter, address our comment or provide a plan and schedule to address our comment. File your submittal using our eFiling system at https://www.ferc.gov/ferc-online/overview. When eFiling, select Hydro: Dam Safety; San Francisco Regional Office from the eFiling menu. The cover page of the filing must indicate that the material was eFiled. For assistance with eFiling, contact FERC Online 2 Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). We appreciate your cooperation in this aspect of our public safety program. If you have any questions, contact Ms. Eunhye Kim at (415)369-3321. Sincerely, Frank L. Blackett, P.E. Regional Engineer cc: Erik Malvick -Division Manager CA Dept. of Water Resources Division of Safety of Dams 2720 Gateway Oaks Drive, Suite 300 Sacramento, CA 95833 c/o Shawn.Jones@water.ca.gov