Loading...
HomeMy WebLinkAbout05.01.26 Board Correspondence - FW_ Emergency Action Plan submitted in FERC P-803-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Emergency Action Plan submitted in FERC P-803-000 by Pacific Gas and Electric Company Date:Friday, May 1, 2026 8:06:28 AM Please see Board Correspondence - Lewis Lee Administrative Technician - Confidential Butte County Administration 25 County Center Drive, Suite 200 • Oroville, CA 95965 T: 530.552.3326 www.buttecounty.ca.gov | lelee@buttecounty.ca.gov -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, May 1, 2026 6:56 AM Subject: Emergency Action Plan submitted in FERC P-803-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 5/1/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Emergency Action Plan Description: Pacific Gas and Electric Company submits response to address FERC's 03/17/2026 Comment Nos. 1 and 2 re the Emergency Action Plan for the Philbrook Dam et al. of the DeSabla-Centerville Hydroelectric Project under P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260501- 5064__;!!KNMwiTCp4spf!DOGlE_9oPqwJLiuXWufQthhoqOX2oJjB7czk9sPaz_bMeK6gCIBPk4vMaPYhI4A5OIcSACtEuLl_mvt5GVOk4jqyn42bKwf6OUyM$ To modify your subscriptions, click here: ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!DOGlE_9oPqwJLiuXWufQthhoqOX2oJjB7czk9sPaz_bMeK6gCIBPk4vMaPYhI4A5OIcSACtEuLl_mvt5GVOk4jqyn42bK2PSTYtr$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address P.O. Box 28209 Oakland, CA 94604 April 30, 2026 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer San Francisco Regional Office Federal Energy Regulatory Commission 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA Philbrook Dam, NATDAM No. CA00345 Round Valley Dam, NATDAM No. CA00346 Emergency Action Plan Reprint Signatures and Updated Inundation Maps Geographic Information System Files ENCLOSURES CONTAIN CUI/CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents the Pacific Gas and Electric Company’s (PG&E) response to address the Federal Regulatory Commission’s (FERC) comments (C-1 and C-2) in the letter dated March 17, 2026, regarding the Emergency Action Plan (EAP) reprint signatures and inundation maps Geographic Information System (GIS) files for the PG&E DeSabla-Centerville Hydroelectric Project, FERC No. 803. In response to C-1, PG&E will include in the EAP reprint the collection of electronic signatures of all parties involved in the plan implementation to confirm their awareness of the plan and understanding of the roles and responsibilities within the plan. In response to C-2, (Enclosures 1 through 3) of this letter provide the inundation maps GIS files for the PG&E DeSabla-Centerville Hydroelectric Project, FERC No. 803. Should you have technical questions regarding the GIS files, please contact Dr. Abbas Dorostkar, Senior Consultant for PG&E, at (408) 664-8536. For questions regarding the EAP, please contact me at (530) 408-9499. Sincerely, Jacqueline Longshore EAP Coordinator Enclosures: CUI/CEII – DO NOT RELEASE 1. EAP Inundation Map GIS Files – Philbrook Dam (Part 1) 2. EAP Inundation Map GIS Files – Philbrook Dam (Part 2) 3. EAP Inundation Map GIS Files – Round Valley Dam Document Accession #: 20260501-5064 Filed Date: 05/01/2026 Document Content(s) PGE20260430_803_DeSabla_ReprintSig_InundationMaps_Ltr.pdf.................1 Document Accession #: 20260501-5064 Filed Date: 05/01/2026