Loading...
HomeMy WebLinkAbout04.30.26 Board Correspondence - FW_ Dam Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Dam Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company Date:Thursday, April 30, 2026 2:32:21 PM Please see Board Correspondence - Lewis Lee Administrative Technician - Confidential Butte County Administration 25 County Center Drive, Suite 200 • Oroville, CA 95965 T: 530.552.3326 www.buttecounty.ca.gov | lelee@buttecounty.ca.gov -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Thursday, April 30, 2026 1:56 PM Subject: Dam Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 4/30/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Dam Safety Compliance Report Description: Pacific Gas and Electric Company submits summary and conclusion of efforts to address FERC's 12/29/2021 Comment 4a re the Grizzly Tower Seismic Analysis at the Grizzly Forebay Dam of the Bucks Creek Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260430- 5371__;!!KNMwiTCp4spf!B_vNxtXtBDdNmUt9RwqtpjRSKZlvcYXt5Lgipzq2kC4nPlmreAGbOeVhNkPVcTBtPBW6qGxrgikJhT0hMFcFeG9BAVZisoCixBiK$ To modify your subscriptions, click here: ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!B_vNxtXtBDdNmUt9RwqtpjRSKZlvcYXt5Lgipzq2kC4nPlmreAGbOeVhNkPVcTBtPBW6qGxrgikJhT0hMFcFeG9BAVZishRabpJ6$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 April 30, 2026 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA Grizzly Forebay Dam, NATDAM No. CA00333 Grizzly Tower Seismic Analysis – Summary and Conclusion for FERC Comment 4a ENCLOSURES CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter reports on the completion of Pacific Gas and Electric Company’s (PG&E) efforts to address the Federal Energy Regulatory Commission’s (FERC) Comment 4a (C-4a) on the intake tower at Grizzly Forebay Dam, which is part of PG&E’s Bucks Creek Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619. FERC provided Comment 4 to PG&E in a letter dated December 29, 2021. For tracking purposes in this letter and moving forward, PG&E separated Comment 4 into C-4a, C-4b and C-4c PG&E submitted its most recent plan and schedule to address C-4a in a letter to FERC dated January 31, 2023. A summary and conclusion of PG&E’s efforts to address C-4a is enclosed with this letter (Enclosure 1). A report on a seismic analysis of the intake tower is provided in (Enclosure 2). PG&E’s technical memorandum summarizing the report is provided in (Enclosure 3). PG&E has reviewed the consultant-prepared report and does not completely concur with the information within, as described in Enclosure 3. PG&E believes C-4a has been satisfactorily addressed, and no further action is necessary. Should you have technical questions concerning this matter, please contact Ben Fontana, senior dam safety engineer for PG&E, at (530) 762-9459. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosures: CUI//CEII – DO NOT RELEASE 1. Summary and Conclusion for Grizzly Tower Stability Analysis 2. Engineering Services for Grizzly Tower, Linear Elastic Time-History Analysis Report – Final, prepared by Stantec and dated July 7, 2025 3. 2025 Grizzly Forebay Tower Seismic Analysis Summary, prepared by PG&E and dated April 24, 2026 Document Accession #: 20260430-5371 Filed Date: 04/30/2026 Document Content(s) PGE20260430_619_Grizzly_IntakeTwr_ResptoCmnt4a_Ltr.pdf....................1 Document Accession #: 20260430-5371 Filed Date: 04/30/2026