HomeMy WebLinkAbout04.30.26 Board Correspondence - FW_ Dam Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter,
Doug; Zepeda, Elizabeth
Cc:Loeser, Kamie; Cannon, Jamie
Subject:Board Correspondence - FW: Dam Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company
Date:Thursday, April 30, 2026 2:32:21 PM
Please see Board Correspondence -
Lewis Lee
Administrative Technician - Confidential
Butte County Administration
25 County Center Drive, Suite 200 • Oroville, CA 95965
T: 530.552.3326
www.buttecounty.ca.gov | lelee@buttecounty.ca.gov
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Thursday, April 30, 2026 1:56 PM
Subject: Dam Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 4/30/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company
Docket(s): P-619-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Dam Safety Compliance Report
Description: Pacific Gas and Electric Company submits summary and conclusion of efforts to address FERC's 12/29/2021 Comment 4a re the Grizzly Tower Seismic Analysis at the Grizzly Forebay Dam of the Bucks Creek
Hydroelectric Project under P-619.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260430-
5371__;!!KNMwiTCp4spf!B_vNxtXtBDdNmUt9RwqtpjRSKZlvcYXt5Lgipzq2kC4nPlmreAGbOeVhNkPVcTBtPBW6qGxrgikJhT0hMFcFeG9BAVZisoCixBiK$
To modify your subscriptions, click here:
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!B_vNxtXtBDdNmUt9RwqtpjRSKZlvcYXt5Lgipzq2kC4nPlmreAGbOeVhNkPVcTBtPBW6qGxrgikJhT0hMFcFeG9BAVZishRabpJ6$
or for phone support, call 866-208-3676.
Power Generation
300 Lakeside Drive
Oakland, CA 94612
Mailing Address:
P.O. Box 28209
Oakland, CA 94604
April 30, 2026
Via Electronic Submittal (E-File)
Frank L. Blackett, P.E., Regional Engineer
Federal Energy Regulatory Commission
Division of Dam Safety and Inspections
100 First Street, Suite 2300
San Francisco, CA 94105-3084
RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA
Grizzly Forebay Dam, NATDAM No. CA00333
Grizzly Tower Seismic Analysis –
Summary and Conclusion for FERC Comment 4a
ENCLOSURES CONTAINS CUI//CEII – DO NOT RELEASE
Dear Frank L. Blackett:
This letter reports on the completion of Pacific Gas and Electric Company’s (PG&E) efforts to
address the Federal Energy Regulatory Commission’s (FERC) Comment 4a (C-4a) on the intake
tower at Grizzly Forebay Dam, which is part of PG&E’s Bucks Creek Hydroelectric Project, Federal
Energy Regulatory Commission (FERC) No. 619. FERC provided Comment 4 to PG&E in a letter
dated December 29, 2021. For tracking purposes in this letter and moving forward, PG&E
separated Comment 4 into C-4a, C-4b and C-4c PG&E submitted its most recent plan and
schedule to address C-4a in a letter to FERC dated January 31, 2023.
A summary and conclusion of PG&E’s efforts to address C-4a is enclosed with this letter
(Enclosure 1). A report on a seismic analysis of the intake tower is provided in (Enclosure 2).
PG&E’s technical memorandum summarizing the report is provided in (Enclosure 3). PG&E has
reviewed the consultant-prepared report and does not completely concur with the information
within, as described in Enclosure 3.
PG&E believes C-4a has been satisfactorily addressed, and no further action is necessary. Should
you have technical questions concerning this matter, please contact Ben Fontana, senior dam
safety engineer for PG&E, at (530) 762-9459. For general questions, please contact Andrew
Garcia, license coordinator for PG&E, at (530) 228-8990.
Sincerely,
Robert O. Ellis, P.E., G.E.
Deputy Chief Dam Safety Engineer
Enclosures: CUI//CEII – DO NOT RELEASE
1. Summary and Conclusion for Grizzly Tower Stability Analysis
2. Engineering Services for Grizzly Tower, Linear Elastic Time-History Analysis Report – Final,
prepared by Stantec and dated July 7, 2025
3. 2025 Grizzly Forebay Tower Seismic Analysis Summary, prepared by PG&E and dated April
24, 2026
Document Accession #: 20260430-5371 Filed Date: 04/30/2026
Document Content(s)
PGE20260430_619_Grizzly_IntakeTwr_ResptoCmnt4a_Ltr.pdf....................1