Loading...
HomeMy WebLinkAbout04.30.26 Board Correspondence - FW_ Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric Company Date:Thursday, April 30, 2026 1:36:50 PM Please see Board Correspondence - Lewis Lee Administrative Technician - Confidential Butte County Administration 25 County Center Drive, Suite 200 • Oroville, CA 95965 T: 530.552.3326 www.buttecounty.ca.gov | lelee@buttecounty.ca.gov -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Thursday, April 30, 2026 6:16 AM Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 4/30/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Part 12 Consultant Safety Inspection Reports Description: Pacific Gas and Electric Company submits summary and conclusion of efforts to address Recommendation 5a, plan and schedule to address Recommendation 5b from the 11th Part 12D Safety Inspection re the Bucks Diversion Dam of the Bucks Creek Project, P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260430- 5037__;!!KNMwiTCp4spf!FMGpdu4cAzGnwIqm8GL3TDrFIfSYOAwVO7_J2dM303aBzB5Q8-P7RkqaFEr7jG-VF2tI5rxHfL55pkLfq27OVz3YjY5WRF1IpADC$ To modify your subscriptions, click here: P7RkqaFEr7jG-VF2tI5rxHfL55pkLfq27OVz3YjY5WRJlpqA33$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!FMGpdu4cAzGnwIqm8GL3TDrFIfSYOAwVO7_J2dM303aBzB5Q8- P7RkqaFEr7jG-VF2tI5rxHfL55pkLfq27OVz3YjY5WRDkE9y2p$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 April 29, 2026 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA Bucks Diversion Dam, NATDAM No. CA00331 11th Part 12D Inspection – Summary and Conclusion for Recommendation 5a Plan and Schedule for Recommendation 5b ENCLOSURES CONTAIN CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: For tracking purposes in this letter and moving forward, PG&E separated R-5 into R-5a and R-5b, as is described in Enclosure 1. This letter reports on the completion of Pacific Gas and Electric Company's (PG&E) efforts to address Recommendation 5a (R-5a) and its plan and schedule for Recommendation 5b (R-5b) from the 11th Part 12D safety inspection report (dated January 2021) for Bucks Diversion Dam, which is part of PG&E’s Bucks Creek Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619. PG&E submitted its original plan and schedule for addressing R-5 in a letter to your office dated April 1, 2021, and provided its most recent update in a letter dated May 3, 2022. A summary and conclusion of PG&E’s efforts to address R-5a and plan and schedule for R-5b are provided in (Enclosure 1) of this letter. A report on a seismic analysis of the intake tower is provided in (Enclosure 2). PG&E’s technical memorandum summarizing the report is provided in (Enclosure 3). PG&E has reviewed the consultant-prepared report and does not completely concur with the information within, as described in Enclosure 3. PG&E believes R-5a has been satisfactorily addressed by on the information enclosed with this letter. Should you have technical questions concerning this matter, please contact Ben Fontana, senior dam safety engineer for PG&E, at (530) 762 -9459. For Document Accession #: 20260430-5037 Filed Date: 04/30/2026 Frank L. Blackett, P.E. Regional Engineer April 29, 2026 Page 2 general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosures: CUI//CEII – DO NOT RELEASE 1. Summary and Conclusion for Recommendation 5a and Plan and Schedule for Recommendation 5b from the 11th Part 12D Safety Inspection Report 2. Engineering Services for Bucks Diversion Tower, Linear Elastic Time-History Analysis Report – Final, prepared by Stantec and dated November 22, 2024 3. 2024 Bucks Diversion Dam’s Abandoned Tower Seismic Analysis Summary, prepared by PG&E and dated April 27, 2026. Document Accession #: 20260430-5037 Filed Date: 04/30/2026 Document Content(s) PGE20260429_619_BucksDiv_TowerStab_20R5Closure_Ltr.pdf....................1 Document Accession #: 20260430-5037 Filed Date: 04/30/2026