Loading...
HomeMy WebLinkAbout05.12.26 Board Correspondence - FW_ Request for Delay of Action_Extension of Time submitted in FERC P-803-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Request for Delay of Action/Extension of Time submitted in FERC P-803-000 by Pacific Gas and Electric Company Date:Tuesday, May 12, 2026 2:14:30 PM Please see Board Correspondence - Lewis Lee Administrative Technician - Confidential Butte County Administration 25 County Center Drive, Suite 200 • Oroville, CA 95965 T: 530.552.3326 www.buttecounty.ca.gov | lelee@buttecounty.ca.gov -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Tuesday, May 12, 2026 9:26 AM Subject: Request for Delay of Action/Extension of Time submitted in FERC P-803-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 5/12/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Request for Delay of Action/Extension of Time Description: Pacific Gas and Electric Company submits request for an extension of time until 05/30/2026 to submit the Final Construction Report for Phase 1.3 Underground of the Orofino1102 Undergrounding Project at the DeSabla-Centerville Project under P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260512- 5067__;!!KNMwiTCp4spf!CAVgrqYv6mhIW2z0CnnkxlUZanpvnSHmT215yHv0AXQ3wVgV-NJ03CydcRlHAihG- a23S74iONaWj321AZTUpKOltQxFQ9JFXh00$ To modify your subscriptions, click here: NJ03CydcRlHAihG-a23S74iONaWj321AZTUpKOltQxFQ6Uwd3gl$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!CAVgrqYv6mhIW2z0CnnkxlUZanpvnSHmT215yHv0AXQ3wVgV- NJ03CydcRlHAihG-a23S74iONaWj321AZTUpKOltQxFQ5bHUeIz$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 May 12, 2026 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA 1102 Undergrounding Project – Orofino Phase 1.3, Electric Undergrounding Extension of Time Request for Phase 1.3 Underground Final Construction Report Dear Frank L. Blackett: This letter presents Pacific Gas and Electric Company’s (PG&E) request for an extension of time to submit the final construction report (FCR) for Phase 1.3, Underground (UG), of the Orofino 1102 electric undergrounding project, located within the DeSabla-Centerville Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 803. Included with PG&E’s extension of time request below is a reasoned basis for the request, per Title 18 of the Code of Federal Regulations, Section 12.40(d). PG&E submitted the Phase 1.3 UG authorization package to FERC in a letter dated July 23, 2025 followed by FERC ‘s authorization of the project in a letter to PG&E dated September 26, 2025. FERC requested that PG&E submit the FCR for the Phase 1.3 UG by March 19, 2026. PG&E completed the work associated with Phase 1.3 UG of the project in October 2025. On February 25, 2026, PG&E requested an extension of time to submit an FCR for other phases of the ungrounding project but inadvertently omitted a request for an extension of time to submit the Phase 1.3 UG FCR. Therefore, PG&E requests an extension of time to submit the Phase 1.3 FCR by May 30, 2026. Should you have technical questions concerning this matter, please contact Isabelle Rawlings, senior dam safety engineer for PG&E, at (925) 359 -5420. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer