HomeMy WebLinkAbout05.11.26 Board Correspondence - FW_ Part 12 Consultant Safety Inspection Reports submitted in FERC P-2088-000 byFrom:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda,
Elizabeth
Cc:Loeser, Kamie; Cannon, Jamie
Subject:Board Correspondence - FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-2088-000 by
Date:Tuesday, May 12, 2026 7:45:28 AM
Please see Board Correspondence -
Lewis Lee
Administrative Technician - Confidential
Butte County Administration
25 County Center Drive, Suite 200 • Oroville, CA 95965
T: 530.552.3326
www.buttecounty.ca.gov | lelee@buttecounty.ca.gov
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Monday, May 11, 2026 9:26 AM
Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-2088-000 by
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 5/11/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: <Not available>
Docket(s): P-2088-000
Lead Applicant: South Feather Water & Power Agency
Filing Type: Part 12 Consultant Safety Inspection Reports
Description: South Feather Water and Power Agency submits Thirteenth Part 12D Pre-Inspection Preparation Report re the Miners Ranch Dam et al. re the Miners Ranch Development et al. of the South Feather Power Project under P-2088.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260511-
5005__;!!KNMwiTCp4spf!Gz9VpBqEhWAOMoKVE9gprNJqMrM1FeRZ4CyqU4dmmoJkqiY2OncCW43ZgUW1Z62cgDwbCmw_KUYWmfslnVWEvWERglaQ8fmWePSc$
To modify your subscriptions, click here:
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!Gz9VpBqEhWAOMoKVE9gprNJqMrM1FeRZ4CyqU4dmmoJkqiY2OncCW43ZgUW1Z62cgDwbCmw_KUYWmfslnVWEvWERglaQ8Q6w5GFp$
or for phone support, call 866-208-3676.
May 8, 2026 Filed Electronically
Frank L. Blackett, P.E., Regional Engineer
100 First Street, Suite 2300
San Francisco, CA 94105
RE: South Feather Power Project (FERC No. 2088)
Thirteenth Part 12D Pre-Inspection Preparation Reports for Miners Ranch Dam CA, Little Grass Valley
Dam PI, and Sly Creek Dam PI; and Independent Consultant Team proposals
Dear Mr. Blackett:
In compliance with your directives outlined in the February 5, 2025 reminder letters, and as described in 18 CFR
§12.42, South Feather Water and Power Agency is submitting the Pre-Inspection Preparation Reports prepared
by our approved Independent Consultant Team (IC Team) for the Miners Ranch Development (2088-01)
Comprehensive Assessment, the Little Grass Valley Development (2088-06) Periodic Inspection, and the Sly
Creek Development (2088-07) Periodic Inspection, of the South Feather Power Project.
If you have any questions or need further information concerning this matter, please feel free to contact me at
(530) 534-1221 x 265, or via email at kmckillop@southfeather.com.
Sincerely,
South Feather Water and Power Agency
cc: Rath Moseley, General Manager, SFWPA
Hunter Doyle, Power Division Manager, SFWPA
Silas Sanderson, PE, Schnabel/Contract SFWPA CDSE
Enclosures: CEII//CUI/PRIV
KRISTEN MCKILLOP
REGULATORY COMPLIANCE MANAGER