Loading...
HomeMy WebLinkAbout05.11.26 Board Correspondence - FW_ Part 12 Consultant Safety Inspection Reports submitted in FERC P-2088-000 byFrom:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-2088-000 by Date:Tuesday, May 12, 2026 7:45:28 AM Please see Board Correspondence - Lewis Lee Administrative Technician - Confidential Butte County Administration 25 County Center Drive, Suite 200 • Oroville, CA 95965 T: 530.552.3326 www.buttecounty.ca.gov | lelee@buttecounty.ca.gov -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Monday, May 11, 2026 9:26 AM Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-2088-000 by .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 5/11/2026, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: <Not available> Docket(s): P-2088-000 Lead Applicant: South Feather Water & Power Agency Filing Type: Part 12 Consultant Safety Inspection Reports Description: South Feather Water and Power Agency submits Thirteenth Part 12D Pre-Inspection Preparation Report re the Miners Ranch Dam et al. re the Miners Ranch Development et al. of the South Feather Power Project under P-2088. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260511- 5005__;!!KNMwiTCp4spf!Gz9VpBqEhWAOMoKVE9gprNJqMrM1FeRZ4CyqU4dmmoJkqiY2OncCW43ZgUW1Z62cgDwbCmw_KUYWmfslnVWEvWERglaQ8fmWePSc$ To modify your subscriptions, click here: ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!Gz9VpBqEhWAOMoKVE9gprNJqMrM1FeRZ4CyqU4dmmoJkqiY2OncCW43ZgUW1Z62cgDwbCmw_KUYWmfslnVWEvWERglaQ8Q6w5GFp$ or for phone support, call 866-208-3676. May 8, 2026 Filed Electronically Frank L. Blackett, P.E., Regional Engineer 100 First Street, Suite 2300 San Francisco, CA 94105 RE: South Feather Power Project (FERC No. 2088) Thirteenth Part 12D Pre-Inspection Preparation Reports for Miners Ranch Dam CA, Little Grass Valley Dam PI, and Sly Creek Dam PI; and Independent Consultant Team proposals Dear Mr. Blackett: In compliance with your directives outlined in the February 5, 2025 reminder letters, and as described in 18 CFR §12.42, South Feather Water and Power Agency is submitting the Pre-Inspection Preparation Reports prepared by our approved Independent Consultant Team (IC Team) for the Miners Ranch Development (2088-01) Comprehensive Assessment, the Little Grass Valley Development (2088-06) Periodic Inspection, and the Sly Creek Development (2088-07) Periodic Inspection, of the South Feather Power Project. If you have any questions or need further information concerning this matter, please feel free to contact me at (530) 534-1221 x 265, or via email at kmckillop@southfeather.com. Sincerely, South Feather Water and Power Agency cc: Rath Moseley, General Manager, SFWPA Hunter Doyle, Power Division Manager, SFWPA Silas Sanderson, PE, Schnabel/Contract SFWPA CDSE Enclosures: CEII//CUI/PRIV KRISTEN MCKILLOP REGULATORY COMPLIANCE MANAGER