Loading...
HomeMy WebLinkAbout05.21.26 Board Correspondence - FW_ Delegated Order issued in FERC P-803-000From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: Delegated Order issued in FERC P-803-000 Date:Thursday, May 21, 2026 9:57:10 AM Please see Board Correspondence - Lewis Lee Administrative Technician - Confidential Butte County Administration 25 County Center Drive, Suite 200 • Oroville, CA 95965 T: 530.552.3326 www.buttecounty.ca.gov | lelee@buttecounty.ca.gov -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Thursday, May 21, 2026 8:57 AM Subject: Delegated Order issued in FERC P-803-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 5/21/2026, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Delegated Order Description: Letter to Pacific Gas and Electric Company accepting the 04/02/2026 response with a plan and schedule to address FERC's comment on the Follow-up Action Item No. 3 etc. for the Philbrook Main Dam, part of the DeSabla-Centerville Project under P-803. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260521- 3063__;!!KNMwiTCp4spf!EeQsyMn3C4fR4OVj4sj1DCKoZSq1FCDvtVpAK4AfE5rrOzY7fRTo9OwNEorPW07tnltDEhgellPQTIUFuZzm9hiaGvdSOtEgY8Oe$ To modify your subscriptions, click here: ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!EeQsyMn3C4fR4OVj4sj1DCKoZSq1FCDvtVpAK4AfE5rrOzY7fRTo9OwNEorPW07tnltDEhgellPQTIUFuZzm9hiaGvdSOm0aoOrQ$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections –San Francisco Regional Office May 21, 2026 In reply refer to: Project No. 803-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric Company 300 Lakeside Dr. Oakland, CA 94612-3534 Re:2025 Dam Safety Inspection Follow-up Dear Mr. Cruzen: This is in response to a letter dated April 2, 2026 from Mr. Robert Ellis that submitted a response with a plan and schedule to address our comment on the follow-up action item No. 3 from the 2025 annual dam safety inspection of Philbrook Main Dam, which is part of the DeSabla-Centerville Project, FERC No. 803. Your response with a plan and schedule to address our follow-up action item 3 by December 15, 2026 is acceptable. File your submittal using our eFiling system at https://www.ferc.gov/ferc- online/overview. When eFiling, select Hydro: Dam Safety; San Francisco Regional Office from the eFiling menu. The cover page of the filing must indicate that the material was eFiled.For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). We appreciate your continued efforts in this aspect of our dam safety program. If you have any questions, contact Ms. Eunhye Kim at (415) 369-3321. Sincerely, Frank L. Blackett, P.E. Regional Engineer Document Accession #: 20260521-3063 Filed Date: 05/21/2026 Frank L Blackett Digitally signed by Frank L Blackett Date: 2026.05.21 07:24:18 -07'00' Document Content(s) P-803-000_116288_I3_2025DSI FollowUp.docx.pdf.............................1 Document Accession #: 20260521-3063 Filed Date: 05/21/2026