Loading...
HomeMy WebLinkAbout05.21.26 Board Correspondence - FW_ General Correspondence issued in FERC P-2088-000From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Cannon, Jamie Subject:Board Correspondence - FW: General Correspondence issued in FERC P-2088-000 Date:Thursday, May 21, 2026 9:56:14 AM Please see Board Correspondence - Lewis Lee Administrative Technician - Confidential Butte County Administration 25 County Center Drive, Suite 200 • Oroville, CA 95965 T: 530.552.3326 www.buttecounty.ca.gov | lelee@buttecounty.ca.gov -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Thursday, May 21, 2026 9:06 AM Subject: General Correspondence issued in FERC P-2088-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 5/21/2026, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-2088-000 Lead Applicant: South Feather Water & Power Agency Filing Type: General Correspondence Delegated Order Description: Letter to South Feather Water and Power Agency providing a comment on the 05/08/2026 Pre-Inspection Preparation Reports for the Thirteenth Part 12D Reports for the Miners Ranch, Little Grass Valley, and Sly Creek Development Projects under P-2088. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20260521- 3068__;!!KNMwiTCp4spf!BmFUdxHBzsXHgm37xYDN5RRvcoTlKF2fZXLSkCG4yehXByQpuzPX8kMRJzfzL1L-BFt0CaEJ6urZAKV8ICuy41KNjVFwgBpQTstB$ To modify your subscriptions, click here: BFt0CaEJ6urZAKV8ICuy41KNjVFwgJpjhWuj$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!BmFUdxHBzsXHgm37xYDN5RRvcoTlKF2fZXLSkCG4yehXByQpuzPX8kMRJzfzL1L- BFt0CaEJ6urZAKV8ICuy41KNjVFwgPb9A9bA$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections –San Francisco Regional Office May 21, 2026 In reply refer to: Project No. 2088-CA VIA FERC Service Rath Moseley General Manager South Feather Water and Power Agency 2310 Oro Quincy Highway Oroville, CA 95966-5226 Re:Thirteenth Part 12D Pre-Inspection Preparation Reports Dear Moseley: This is in response to a letter dated May 8,2026 from Ms. Kristen McKillop that submitted the Pre-Inspection Preparation Reports (PIPRs) for the Thirteenth Part 12D Reports for the Miners Ranch, Little Grass Valley, and Sly Creek Developments, FERC No. 2088. Although most of the PIPRs are generally acceptable and we are not requiring the resubmittal of any of the PIPRs, we have following comment regarding the PIPR for the Sly Creek Development: For Sly Creek, sections 4.2.2.1 and 4.2.2.2, regarding the assessment of instrumentation data at the piezometers and seepage weir, were minimally acceptable for the PIPR but would not be acceptable for the final Periodic Inspection Report (PIR). The assessment of these main instruments for the development was general with almost no reference to the actual data, or discussion on whether data assessment was required. Little or no specific evidence was provided for the conclusions reached. Chapter 16 of our guidelines, Section 16-5.3.2 notes that the review of instrumentation data “is a critical component of the PI and is equally important as the field inspection.”The conclusions for these instruments should be more thoroughly explained and supported with specific data and figures as appropriate in the final PIR. As a point of comparison, we note that the level of detail expected by Chapter 16 for instrumentation assessment in the Miners Ranch PIPR is equivalent to what should be provided for Sly Creek. Document Accession #: 20260521-3068 Filed Date: 05/21/2026 2 No response is required to this letter. We appreciate your continued efforts in this aspect of our dam safety program.If you have any questions, please contact Mr.Cody Stephenson at (415)369-3308. Sincerely, Frank L. Blackett, P.E. Regional Engineer Document Accession #: 20260521-3068 Filed Date: 05/21/2026 Frank L Blackett Digitally signed by Frank L Blackett Date: 2026.05.21 07:45:25 -07'00' Document Content(s) P-2088-000 67587 Sly Creek PI PIPR letter.docx.pdf........................1 Document Accession #: 20260521-3068 Filed Date: 05/21/2026