HomeMy WebLinkAbout2015 Annual Inspection Report_Vance Ave #2
Department of Conservation
OFFICE OF MINE RECLAMATION
SMARA LEAD AGENCY INSPECTION NOTICE FORM
(This form is provided for the convenience of lead agencies. See instructions on the back of the form.)
To: Reporting Unit
California Department of Conservation
Office of Mine Reclamation
801 K Street, MS 0906
Sacramento, CA 95814
From:
Date of this Notice:
Subject: Lead Agency Inspection Notice Pursuant to PRC 2774(b)
____________________________________________
Signature and Title of Lead Agency Representative *See instructions on back of form
I certify that this surface mining operation is in compliance with SMARA (mining operation is permitted
[or vested], consistent with reclamation plan, the financial assurance is adequate for reclamation
costs, and no violations were cited on the MRRC-1 inspection form*).
Check applicable box:
Yes No - If no, which aspects of the operations are inconsistent with SMARA :
Does the surface mining operation have a review of its reclamation plan, financial assurances, or an
interim management plan pending under subdivision (b), (c), (d), or (h) of Section 2770, or an appeal
pending before the board or lead agency governing body under subdivision (e) or (h) of Section 2770?
Yes No
Are the completed MRRC-1 inspection form and any supporting documentation, including, but not
limited to, any inspection report prepared by the licensed geologist, civil engineer, landscape architect,
or forester, who conducted the inspection attached? Yes No
Date of Inspection:Mine ID: 91-
Rowland Hickel, Senior Planner
Butte County
Department of Development Services
7 County Center Drive
Oroville, CA 95965
December 17, 2015
October 6, 2015 04-0021
✔
✔
✔
INSPECTION NOTICE FORM INSTRUCTIONS
The specific SMARA statute that requires the inspection notice is quoted below:
“PRC 2774 (b) …The lead agency shall notify the director within 30 days of the date of completion of
the inspection that the inspection has been conducted. The notice shall contain a statement regarding
the surface mining operation's compliance with this chapter, shall include a copy of the completed
inspection form, and shall specify which aspects of the surface mining operations, if any, are
inconsistent with this chapter. If the surface mining operation has a review of its reclamation plan,
financial assurances, or an interim management plan pending under subdivision (b), (c), (d), or (h) of
Section 2770, or an appeal pending before the board or lead agency governing body under subdivision
(e) or (h) of Section 2770, the notice shall so indicate. The lead agency shall forward to the operator a
copy of the notice, a copy of the completed inspection form, and any supporting documentation,
including, but not limited to, any inspection report prepared by the geologist, civil engineer, landscape
architect, or forester, who conducted the inspection.”
Please use the attached suggested SMARA LEAD AGENCY INSPECTION NOTICE FORM or your
own form or letter format to provide the information required pursuant to PRC 2774(b).
*Please note whether violations cited in the MRRC-1 have been corrected at the date of this
notice.
State of California
DEPARTMENT OF CONSERVATION
OFFICE OF MINE RECLAMATION
MRRC-1 (4/97) Page 1 of 5 (Rev. 07/13)
SURFACE MINING INSPECTION REPORT
(See reverse side of each form page for completion instructions)
I. Mine Name (As Shown on Approved Reclamation Plan)Inspection Date:CA MINE ID#
91-
II. Mine Operator Telephone
( )
Onsite Contact Person Telephone
( )
Mailing Address
City State ZIP Code
E-mail Address (optional)
III. Designated Agent Telephone
( )
Mailing Address
City State ZIP Code
E-mail Address (optional)
IV. SMARA Lead Agency Name (City, County, BCDC, or SMGB)
Inspector Telephone
( )
Title Organization
Mailing Address
City State ZIP Code
E-mail Address (optional)
V. Does the operation have:P NR No Yes
A Permit to Mine Permit # - Start and Expiration Dates
Vested Right to Mine Year of Lead Agency determination
A Reclamation Plan RP# Date Approved
Reclamation Plan Amendment RP Amendment # (as applies) Date Approved or Status of Amendment
Has the Operator filed a Mining Operation Annual Report (Form MRRC-2) this Year?
Check One:Yes No Year of Most Recent Filed
Annual Report:
VI. Is this Operation on Federal Land? Check One:If "Yes,”Provide One or Both of the Federal Mine Land Identification Numbers Below:Yes No
California Mining Claim Number (CAMC#):Latitude/Longitude at Mine Entrance (Decimal Degrees):
U.S. Forest Service or BLM Identification Number (Plan of Operations #) :Status of Plan of Operations (Current/Expired/In Process):
DISTRIBUTION: Lead Agency sends copies of Inspection notice & completed MRRC-1 to operator, operator’s designated agent, BLM or USFS (if required) & retains original.
Vance Avenue #2 October 6, 2015 04-0021
Mathews Readymix, LLC 530 749-6525
Lloyd Burns 530 749-6525
PO Box 749
Marysville California 95901
lburns@eaglematerials.com
Lloyd Burns 530 749-6525
PO Box 749
Marysville California 95901
lburns@eaglematerials.com
Butte County
Rowland Hickel 530 538-7150
Senior Planner Department of Development Services
7 County Center Drive
Oroville California 95965
rhickel@buttecounty.net
MRP 92-43
December 10, 1992
MRP 92-43 December 10, 1992
✔
✔2014
✔
N/A 39.439747 / -121.643683
N/A N/A
INSTRUCTIONS FOR COMPLETING SURFACE MINING INSPECTION REPORT
Form MRRC-1 (4/97) Page 1 (Rev. 07/13)
This report is intended to comply with the requirements of California’s Surface Mining and Reclamation Act (SMARA – Public Resources Code Sections §§
2710 et seq., and the associated California Code of Regulations found in Title 14, division 2, beginning at § 3500, hereinafter respectively “PRC” or “CCR”) and
specifically PRC § 2774(b) and CCR § 3504.5 for operations located on private land and/or partly or solely on Bureau of Land Management (BLM) and U.S.
Forest Service (USFS) lands (Title 43, parts 3500, 3600, and 3800 of the Code of Federal Regulations). A Memorandum of Understanding between the U.S.
Department of Interior, BLM; U.S. Department of Agriculture, USFS; the State of California, Department of Conservation; and the State Mining and Geology
Board (SMGB), discusses implementation of SMARA on Federal lands in California that are under the jurisdiction of the BLM and/or the USFS.
As required by PRC § 2774(b) and CCR § 3504.5(g), Lead Agencies shall file an Inspection Notice that includes a statement regarding compliance with
SMARA, a copy of this Surface Mining Inspection Report (MRRC-1) and any other supporting documentation with the Department within 30 days of completion
of the inspection. The Lead Agency shall also forward a copy of the Inspection Notice, MRRC-1, and any supporting documentation to the operator.
BLOCK I: Enter the name of the Mining Operation, the date of the inspection, and the California Mine ID number.
BLOCK II: Enter the name of the Mine Operator, mailing address, phone number, name, and email address (optional) of the person to serve as the
onsite contact.
BLOCK III: Enter the name, mailing address, phone number, and email (optional) of the Designated Agent who, under PRC § 2772(c)(1) and
2207(a)(1), will serve as a contact for any follow-up correspondence or discussions regarding the inspection or noted violations.
BLOCK IV: For "Lead Agency," enter the name of the certified SMARA Lead Agency that is conducting this inspection. Acceptable entries include the
name of the city, county, Bay Conservation and Development Commission (BCDC), or State Mining and Geology Board (SMGB). For
"Organization," enter the name of the agency, firm or other organization that employs the inspector.
BLOCK V:Check the appropriate boxes.
P
NR, No, Yes
Pending (on appeal or awaiting approval by Lead Agency)
Not required for this operation at the time this inspection was completed
No
Yes, supply information
Note: Where appropriate, to aid in determining when the lead agency recognized that the operation has vested mining rights, inspectors
are advised to review older agency correspondence, minutes of lead agency hearings, including agendas and staff reports associated
with approvals of any kind related to the mining operation.
BLOCK VI: Indicate if the operation is on federal Land; if operation is on federal land, include a California Mining Claim Number and/or a BLM/USFS
Identification Number and Plan of Operations Number, if applicable. Give the status of the BLM/USFS Plan of Operations, as indicated.
Give the latitude and longitude at the mine entrance in decimal degrees.
___________________________________________________________________________________________________________________________________________
DISTRIBUTION INSTRUCTIONS:
One copy of the inspection notice and this completed Inspection Report (all pages) shall be given to the Mine Operator and the
operator’s designated agent by the lead agency (PRC Section 7374(b).
The Lead Agency must retain the original copy of this Inspection Report and submit one copy of this Inspection Report, along
with an original inspection report notice (PRC Subsection 2774(b)), within 30-days of the completion of the inspection, to:
Department of Conservation Office of Mine Reclamation 801 K St MS 09-06 Sacramento, CA 95814-3529
If any part of the operation inspected is on BLM or USFS land, one copy of this Inspection Report should be forwarded to the
appropriate BLM or USFS office.
State of California
DEPARTMENT OF CONSERVATION
OFFICE OF MINE RECLAMATION
MRRC-1 (4/97) Page 2 of 5 (Rev. 07/13)
SURFACE MINING INSPECTION REPORT
VII. Financial Assurance
Inspection Date:CA MINE ID#:
91-
Type of Financial
Assurance Mechanism(s)
Financial Assurance Mechanism Number(s)Amount of Mechanism Date of Expiration Date of Lead Agency
Approval of
Mechanism
Total Amount of Mechanism(s)
Financial Assurance Mechanism Pending Review by Lead Agency? If yes, provide date submitted/explanation and amount of pending mechanism:
Has there been a change of operator
since last inspection? If yes provide the date
of notice.
Yes No
Date of Change:
If yes, has the new operator posted a Financial Assurance Mechanism?
Yes No
If not, describe status of new operators Financial Assurance Mechanism:
Does new operator’s
Notice of Change include
a statement of responsibility
for reclamation?
Yes No
Date and Amount of Most Recent Approved
Financial Assurance Cost Estimate:
Date: Amount:
Financial Assurance Cost Estimate
Pending Review with Lead Agency? Date Submitted/Explanation/Amount of pending estimate:
Financial Assurance Cost Estimate
Appealed by Operator?
Date Submitted to State Mining and Geology Board or Lead Agency for Appeal/Explanation:
Other?
DISTRIBUTION: Lead Agency sends copies of Inspection notice & completed MRRC-1 to operator, operator’s designated agent, BLM or USFS (if required) & retains original.
October 6, 2015 04-0021
Surety Bond #6622948 $16,848.00 Continuous 10/3/14
$16,848.00
✔
July 7, 2015 $16,859.00
N/A
N/A
INSTRUCTIONS FOR COMPLETING SURFACE MINING INSPECTION REPORT
Form MRRC-1 (4/97) Page 2 (Rev. 07/13)
BLOCK VII: Type of Financial Assurance Mechanism(s): Fill in the type of mechanism(s) that are on file. PRC § 3803 and SMGB Financial
Assurance Guideline number 10 describe Surety Bonds, Trust Funds, or Irrevocable Letters of Credit as acceptable financial assurance
mechanisms for non-governmental entity operators. For surface mining operations owned and operated by state and local government
entities, Surety Bonds, Trust Funds, Irrevocable Letters of Credit, Pledges of Revenue, and Budget Set Aside are acceptable financial
assurance mechanisms.
State the Financial Assurance Mechanism(s) document number(s). State the dollar amount of each Financial Assurance Mechanism(s)
currently on file. State the date of expiration of the Financial Assurance Mechanism(s) currently on file. State the date of approval for the
most recent lead agency approved Financial Assurance Mechanism(s) on file. State the total dollar amount of mechanisms held for
reclamation.
Indicate if any Financial Assurance Mechanisms are pending review by the lead agency and the date and amount of submittal to the lead
agency.
Indicate if there has been a change of operator of record since the last inspection and, if so, note the date the change occurred and
whether the new operator has signed any document acknowledging reclamation responsibility under the approved reclamation plan and
if the new operator has posted a Financial Assurance Mechanism. If a replacement Financial Assurance Mechanism has not been
posted, indicate the status of the new operator’s replacement Financial Assurance Mechanism.Per PRC § 2773.1(c) and Guideline
number 19 of the SMGB’s Financial Assurance Guidelines, when operatorship is transferred, “the original financial assurance must
remain in effect until the lead agency has approved, following department review, the replacement assurances provided by the
successor operator.”
The Financial Assurance amount must be adjusted and approved annually to account for new lands disturbed by surface mining
operations and lands to be disturbed in coming year, inflation, and reclamation of lands accomplished in accordance with the approved
Reclamation Plan (PRC § 2773.1(a)(3) and SMGB Financial Assurance Guideline #16). In order to determine what adjustments, if any,
are appropriate to the Financial Assurance Mechanism amount, each mine operator must submit annually a revision of the written
Financial Assurance Cost Estimate to the Lead Agency (PRC § 3804(c)).Provide the date of the operator’s most recent revision of the
Financial Assurance Cost Estimate to the Lead Agency and where appropriate, provide a status of the pending Financial Assurance Cost
Estimate. Provide the date and amount of the most recently approved Financial Assurance Cost Estimate.
Also indicate if the Financial Assurance Cost Estimate is under appeal to the lead agency or whether it has been appealed to State Mining
and Geology Board as described in PRC § 2770(e).
Use the Financial Assurance “Other” and “Explanation” blocks to provide any other pertinent information regarding the status of
Financial Assurance(s). If the operation does not have a sufficient Financial Assurance Cost Estimate and/or Financial Assurance
Mechanism, explain in detail.
State of California
DEPARTMENT OF CONSERVATION
OFFICE OF MINE RECLAMATION
MRRC-1 (4/97) Page 3 of 5 (Rev. 07/13)
SURFACE MINING INSPECTION REPORT
VIII. Non-SMARA facility operations conditions solely of local concern (e.g. hours of operation) do
not need to be noted here. See Instructions for Block VIII on reverse side of page.
[Use separate sheet(s) where necessary. Refer to item numbers below]
CA MINE ID #
91-
Potential Reclamation Plan
Requirements:
List Reclamation Plan Requirements
(Recommended to be filled out prior to field inspection)
Note Site Conditions and Compliance Issues
(Note additional comments on Page 5 as necessary)
VN?
1) General Information
a) Permitted Mineral Product(s)
b) Approved Production Amount
(Annual/Gross)
c) End Date of Operations Per RP
d) Permit end date
e) End Use
2) Boundaries
a) Property Boundary
b) Permit Boundary
c) Rec. Plan Boundary (RPB)
d) Setbacks
3) Slopes –Grading
a) Fill Slopes –Note Condition of:
i) Slopes –Working (max/current)
ii) Slopes –Reclaimed
iii) Compaction
b) Cut Slopes –Note Condition of:
i) Slopes –Working (max./current)
ii) Slopes –Reclaimed
4) Erosion Control
a) BMPs
b) Grading
c) Vegetation
5) Ponds
a) Design –Function
b) Capacity (area/depth/volume)
c) Maintenance
6) Stream & Wetland Protection
a) Buffers (distance to channel)
b) Berms (distance/length/height)
c) Best Management Practices
d) Drainage
e) Grading & Slopes
f) Stockpiles
g) Stream Diversions
7) Sensitive Wildlife & Plant Protection
a) List Species
b) Protection Measures
DISTRIBUTION: Lead Agency sends copies of Inspection notice & completed MRRC-1 to operator, operator’s designated agent, BLM or USFS (if required) & retains original.
04-0021
a) Sand, Gravel & Clay
b) 50,000 - 250,000 tons/annual (No
information available regarding total
production)
c) June 15, 2016
d) N/A
e) Residential/Recreational
Per Condition #13, together with the extension of
the permit expiration date with approval of the IMP,
the permit expiration date is June 15, 2016.
Operators must amend the mining permit or initiate
reclamation of the site by this date. Production
amounts have not been reported for the current
activities. Its anticipated that production is
consistent with the adopted reclamation plan.
a) 41.84 acres
b) 31.0 acres
c) 31.0 acres
Permitted boundaries were surveyed
and marked, prior to operations.
Current mine operations were within
the permitted boundaries.
10 acres of the mine site will be reclaimed with
silts produced during processing activities.
Berms will be established around the open pit,
and the area will be backfilled until the grade is
approximately 10 feet above the water table.
Backfilled areas will dry and settle, thereby
being compacted suitable for a farmland end
use.
All working and final slopes will be 1.5:1.
Working slopes were in excess of
1.5:1. No slope stability issues
were evident.
All runoff will be contained on-site. No
additional information regarding erosion
control was identified in the reclamation plan.
Site consists of dredger tailings.
No erosion was evident.
Mined areas to be reclaimed will have berms built around
them to be used as settling ponds. 21 acres to be
reclaimed as ponds. Side slopes for berms and ponds to
be maintained at 1.5:1. Ponds will have a depth of 50
feet.
Existing ponds remain
undisturbed. No new ponds
were created at the site.
N/A N/A
No information provided in
reclamation plan.
Existing ponds are providing excellent habitat
for area and migratory wildlife species.
INSTRUCTIONS FOR COMPLETING SURFACE MINING INSPECTION REPORT
Form MRRC-1 (4/97) Page 3 and 4 (Rev. 07/13)
BLOCK VIII: INSTRUCTIONS FOR EACH DATA COLUMN:
Potential Reclamation Plan Requirements (Column 1): Under CCR § 3504.5(f), “Inspections may include, but shall not
be limited to the following: the operation’s horizontal and vertical dimensions, volumes of materials stored on the site; slope
angles of stock piles, waste piles and quarry walls; potential geological hazards; equipment and other facilities; samples of
materials; photographic or other electronic images of the operation; any measurements or observations deemed necessary
by the inspector or the lead agency to ensure the operation is in compliance with Public Resources Code Chapter 9.”
Column 1 provides a list of items that may be included in the approved reclamation plan, either expressly or by reference as
described in PRC § 2772(d), which may include conditions of approval, other permit requirements and supplementary
documents, including environmental documents, prepared for the project pursuant to Division 13 (commencing with Section
21000).
It is not expected that all reclamation plans will include each item of Section VIII, or be limited to the items listed. Items in
Column 1 that are not operative requirements in the reclamation plan may not need to be addressed by the inspection.
Operative reclamation plan requirements not listed in Items 1 through 12 may be listed in Item 13, under “Other
Reclamation Plan Requirements.”
Reclamation Plan Requirements (Column 2): Prior to field inspection, it is recommended that the inspector review the
approved reclamation plan and any amendments, as well as any other documents included by reference, including
conditions of approval, other permit requirements and supplementary documents, such as environmental documents
prepared for the project pursuant to Division 13 (commencing with Section 21000) that specifically relate to reclamation of
the mine site. The most recently approved Financial Assurance Cost Estimate and any pending or ongoing enforcement
actions should also be reviewed. Conditions of approval that relate to facility operations solely of local concern, such as
hours of operation, noise, and dust control are not subject to the inspection.
Column 2 is intended to provide the inspector a place to match any items noted in Column 1 with those items included in the
approved reclamation plan either expressly or by reference as described in PRC § 2772(d), which may include conditions of
approval, other permit requirements and supplementary documents, including environmental documents prepared for the
project pursuant to Division 13 (commencing with § 21000). Also note any Interim Management Plan (IMP) requirements
where the mine is subject to an IMP pursuant to PRC § 2770(h).
Indicate the source document for the reclamation plan requirements at the end of the entry in parenthesis; i.e. (COA) (POO)
(EIR) (WDR) (SWPPP), etc. Conditions of approval that relate to facility operations solely of local concern, such as hours
of operation, noise, and dust control should not be included in Column 2. If items listed in Column 1 of Section VIII of the
form are not included in the reclamation plan or other documents included by reference, write not applicable or “NA” in
Column 2.
Specific reclamation requirements may not apply to an operation at the time of inspection, but they are important to be
aware of to ensure current activity at the site will not prohibit reclamation in accordance with the approved reclamation plan.
A copy of the Surface Mining and Reclamation Act of 1975 and 1993 SMGB regulations may be obtained at
http://www.conservation.ca.gov/omr/lawsandregulations/Pages/SMARA.aspx.
Site Conditions and Compliance Issues (Column 3): Describe current site conditions and compliance issues noted for
both operating and reclaimed surfaces that pertain to the reclaimed condition of the mining site. Block IX is provided for
additional space to describe site conditions and/or compliance issues. Attach additional sheets as necessary.
Evaluations of slope stability and engineered compaction should be prepared by qualified professionals only. PRC §
2774(b)) states “The lead agency may cause an inspection to be conducted by a state licensed geologist, state licensed
civil engineer, state licensed landscape architect, or state licensed forester, who is experienced in land reclamation and
who has not been employed by a surface mining operation within the jurisdiction of the lead agency in any capacity during
the previous 12 months.”
VN?(Column 4): Use this box to indicate if violations were noted for any of the specific items under the corresponding item
group heading (e.g., Boundaries, Slopes-Grading, etc.) during field inspection of the site. Enter number of violations in the
box.
State of California
DEPARTMENT OF CONSERVATION
OFFICE OF MINE RECLAMATION
MRRC-1 (4/97) Page 4 of 5 (Rev. 07/13)
SURFACE MINING INSPECTION REPORT
VIII. Non-SMARA facility operations conditions solely of local concern (e.g. hours of operation) do not need to be noted here. See Instructions for Block VIII on reverse side of page.
[Use separate sheet(s) where necessary. Refer to item numbers below]
CA MINE ID #
91-
Potential Reclamation Plan
Requirements:
List Reclamation Plan Requirements
(Recommended to be filled out prior to field inspection)
Note Site Conditions and Compliance Issues
(Note additional comments on Page 5 as necessary)VN?
8) Soil/Overburden Stockpile
Management
a) Topsoil
i) Location
ii) Slope Stability
iii) BMPs
b) Overburden
i) Location
ii) Slope Stability
iii) BMPs
c) Topsoil Application
i) Amendments
ii) Depth
iii) Moisture
iv) Application Methods
9) Revegetation
a) Test Plots
b) Species Mix
c) Density
d) Percent Cover
e) Species Richness
f) Protection
g) Success Monitoring
h) Invasive Species Control
10) Structures
11) Equipment
12) Closure of Adits
13) Other Reclamation Plan
Requirements
DISTRIBUTION: Lead Agency sends copies of Inspection notice & completed MRRC-1 to operator, operator’s designated agent, BLM or USFS (if required) & retains original.
04-0021
Mine site consists of dredger
tailings. No topsoil is located on the
mine site. Silts from processing
tailings will be used to fill and
reclaim approximately 10 acres as
dry land areas, and to reclaim the
pond edges.
No topsoil or subsoil stockpiles
are located at the site.
Natural revegetation will occur on
reclaimed areas and around the the
pond.
Existing vegetation has not be
cleared from the site. Riparian
vegetation around existing ponds
remain intact. Construction
fencing was installed around
sensitive habitats located
adjacent to mining activities.
All structures to be removed.
No structures are located at the site. All
equipment on the site is portable.
All equipment and refuse to be removed.
Equipment associated with mining was present on the site.
No obsolete or non-mining equipment was identified.
N/A N/A
N/A N/A
INSTRUCTIONS FOR COMPLETING SURFACE MINING INSPECTION REPORT
Form MRRC-1 (4/97) Page 5 (Rev. 05/13)
BLOCK IX Inspectors may use the large open block for comments to describe violations, corresponding corrective actions, or
preventative measure(s) suggested by the inspector to address noted violations or avoid potential violations, and to explain
any limitations on the inspection conducted. The inspector can also use this space to describe the status of any pending or
current enforcement actions. Separate violations that are the subject of existing enforcement actions from violations
observed during the current inspection.
Enter California Mine ID Number and Date of Inspection.
Weather Codes: CR = Clear; CL = Cloudy; RN = Rain; SN = Snow; WD = Windy
For "Duration of Inspection," indicate the start and end times of the inspection (do not include travel time).
SMARA Status Codes (based on annual report and reported production under CCR § 3695, indicate the appropriate status
code)
I = Idle (Per § 2727.1) NP = Newly Permitted (must be no mining/disturbance)
AB = Abandoned (Per § 2770(h)(6)) NOP-NC = Not in operation, reclamation not completed
NOP-C = Not in operation, reclamation completed
If idle, indicate either the date operation became idle as defined by PRC Section 2727.1, the date an IMP was approved, or the
status of any pending IMP.
Status of Reclamation Codes:
RN = Reclamation not begun P = Post reclamation monitoring
R = Reclamation in progress RC = Reclamation complete
Enter approximate acreage under reclamation (the number of acres actively being reclaimed in accordance with the
approved reclamation plan).
Enter approximate acreage determined to be reclaimed in accordance with the approved reclamation plan by Lead Agency.
Enter approximate total disturbed acreage. This includes all acreage disturbed by the surface mining operation, as defined
by PRC § 2729: “’Mined Lands’ includes the surface, subsurface, and ground water of an area in which surface mining
operations will be, are being, or have been conducted, including private ways and roads appurtenant to any such area, land
excavations, workings, mining waste, and areas in which structures, facilities, equipment, machines, tools or other materials or
property which result from, or are used in, surface mining operations are located.” This should include acreage under
reclamation that has not been determined to be reclaimed in accordance with the approved reclamation plan by the Lead
Agency.
Enter the total number of acres within or adjacent to the disturbance area of the operation disturbed pre-SMARA (disturbance
before January 1, 1976, that has not had mining related disturbance after January 1, 1976).
Enter the disturbed acreage identified in the most recent Financial Assurance Cost Estimate (i.e., the disturbed acreage that
was used to calculate the most recent Financial Assurance Cost Estimate.
Enter the date of the previous lead agency inspection and number of violations noted during that inspection.
Attendees: Provide the names and affiliations of parties in attendance at the inspection.
BLOCK X: Enter the number of violations noted during the inspection. Sign and date the Inspection Report. If the inspector is a
consultant to the lead agency, include the inspector’s certification (PE, PG, CEG, etc.) and license number, if applicable.
The lead agency may cause an inspection to be performed by contracting with private consultants, specifically: state
licensed geologist, state licensed civil engineer, state licensed landscape architect, or state licensed forester per § 2774(b).
2015 Annual Inspection Report Vance Avenue #2 Mine (91‐04‐0021)
1
OBSERVATIONS
The mine site was active during inspection. Tailings/aggregates was being extracted as part of
the Sutter Butte Flood Control Agency Feather River West Levee Project. Aggregates were
hauled directly to the work site located within the Oroville Wildlife Area. Mining activities were
initiated in August 2015, and are expected to conclude in November 2015. An unknown amount
of acreage was disturbed. Total disturbed acreage will be reported in the 2015 Mining
Operation Annual Report.
The staging area for the levee project and mining activities was located within the Vance Avenue
#1 Pit, located adjacent to the subject mine.
Water to support mining operations was obtained from the groundwater well located on the
Vance Avenue #1 Pit, and conveyed by waterlines to the portable water tank, located on Vance
Ave (off the mine site). Water use included dust suppression, in compliance with Condition #2
of Mining and Reclamation Plan (MRP) 92‐43.
Orange construction fencing was installed around wetland areas adjacent to the mining activity
areas.
Condition #13 placed a 20 year expiration of the mining permit from the date of approval by the
Planning Commission. Condition #13 states, “Expiration of the Mining Permit shall be 20 years
from the date of approval by the Planning Commission. Expansion to the time limits require
approval by the Planning Commission.” The Butte County Planning Commission approved MRP
92‐43 on December 10, 1992. The permit allowed for the extraction, processing, and exporting
of sand and gravel to be performed in four phases. Each operational phase was approved to
occur in successive 5 year terms, with mining operations ultimately concluding on December 31,
2012. After County approval of the permit, the mine operators reported that the mine was
active sometime between 1993 and 1996, when ¼ acre of the mine area was disturbed with
“the use of front end loaders, dozers, and backhoes in the process of stockpiling aggregates,
moving aggregate as well as exploring the aggregate site.” The current operators subsequently
filed several interim management plans indicating their desire to reactivate operations in the
future, as well as establishing measures to maintain the mine during this interim period. The
latest amendment to these interim management plans was approved by the County on August
20, 2013, when the operator extended the effective date of the interim management plan from
May 2012 to June 15, 2016. As a result of the extension of the IMP, Butte County considers
approval of the March 27, 2013 Interim Management Plan to have extended the Condition no.
13 expiration date of December 31, 2012 to June 15, 2016, without the Planning Commission
having approved the extension. With the expiration date extended, the operators are allowed
to reactivate the mine at any time before June 15, 2016. Upon arrival of this revised expiration
date, the operators must commence reclamation of the mine in accordance with the approved
reclamation plan, or extend the time limits of MRP 92‐43 by filing an application to amend MRP
92‐43.
An updated Financial Assurance Cost Estimate was approved for the mine on July 7, 2015. The
estimate increased the total reclamation liability for the mine by $11, which accounts for the
cost of inflation since the previous estimate in July 2014. The current financial assurance
2015 Annual Inspection Report Vance Avenue #2 Mine (91‐04‐0021)
2
amount for the mine is $16,848. The operator was advised on July 27, 2015 that an update to
the financial assurance is required.
VIOLATIONS/CORRECTIVE MEASURES
1. (Corrective Measure). The permit to mine is set to expire on June 15, 2016. To continue
operations beyond this date, the operator must file an application to amend their mining permit
MRP 92‐43. If no amendment is filed, prior to the date of expiration, the operator must
commence reclamation activities. Reclamation activities must be in accordance with approved
reclamation plan. It’s recommended that the operator file a preliminary reclamation report
detailing the anticipated reclamation activities and its consistency with the adopted reclamation
plan.
Department of Development Services Tim Snellings, Director
Pete Calarco, Assistant Director
7 County Center Drive T: 530.538.7601
Oroville, California 95965 F: 530.538.7785 buttecounty.net/dds
July 27, 2015
Todd Ceasri
Mathews Readymix, LLC.
PO Box 749
Marysville, CA 95901
RE: Financial Assurance Update – Vance Avenue Pit #2 (CA MINE ID # 91-04-0021)
Dear Mr. Ceasri:
In compliance with PRC Section 2774, this department forwarded your Financial Assurance Cost Estimate
to the Department of Conservation, Office of Mine Reclamation for their 45 day review period on July 7,
2015. On July 16th, the Office of Mine Reclamation determined that the cost estimate is adequate for
reclamation.
Currently, a Surety Bond (No. 6622948) in the amount of $16,848 is on file with the County to fund
reclamation in accordance with the approved reclamation plan. Pursuant to PRC 2770 and 2773.1(a),
and as reflected in the approved financial assurance cost estimate, an updated financial assurance in the
amount of $16,859 is required.
Please provide this department with an updated financial assurance in the amount noted above. This may
be in the form of a rider to the existing bond, Certificate of Deposit or other financial assurance mechanism
(adjustment/increase rider, or other surety instrument) Once the new financial assurance is received
reflecting the new amount, our office will forward a copy to the Office of Mine Reclamation for final
acceptance.
Thank you again for your continued efforts in the administration of the site and its financial assurances.
If you should have any questions regarding the requirements of a financial assurance, please contact me
at your convenience.
Sincerely,
Rowland Hickel
Senior Planner
530.538.7150
rhickel@buttecounty.net
Oc
t
o
b
e
r
6
,
2
0
1
5
A
n
n
u
a
l
I
n
s
p
e
c
t
i
o
n
P
h
o
t
os
–
V
a
n
c
e
A
v
e
n
u
e
2
(
9
1
-
0
4
-
0
0
2
1
)
Ph
o
t
o
1
–
V
i
e
w
w
e
s
t
t
o
w
a
r
d
s
m
i
n
e
a
r
e
a
f
r
o
m
l
e
v
e
e
r
o
a
d
.
P
h
o
t
o
2
–
V
i
e
w
o
f
t
h
e
s
o
u
t
h
e
a
s
t
c
o
r
n
e
r
o
f
t
h
e
m
i
n
e
a
r
e
a
.
Ph
o
t
o
3
–
V
i
e
w
n
o
r
t
h
a
l
o
n
g
t
h
e
l
e
v
e
e
r
o
a
d
(
r
i
g
h
t
)
i
n
2
0
1
4
.
P
h
o
t
o
4
–
V
i
e
w
n
o
r
t
h
a
l
o
n
g
t
h
e
l
e
v
e
e
r
o
a
d
(
r
i
g
h
t
)
i
n
2
0
1
5
.
Oc
t
o
b
e
r
6
,
2
0
1
5
A
n
n
u
a
l
I
n
s
p
e
c
t
i
o
n
P
h
o
t
os
–
V
a
n
c
e
A
v
e
n
u
e
2
(
9
1
-
0
4
-
0
0
2
1
)
Ph
o
t
o
5
–
V
i
e
w
w
e
s
t
a
l
o
n
g
V
a
n
c
e
A
v
e
n
u
e
(
l
e
f
t
)
i
n
2
0
1
4
.
P
h
o
t
o
6
–
V
i
e
w
w
e
s
t
a
l
o
n
g
V
a
n
c
e
A
v
e
n
u
e
(
l
e
f
t
)
i
n
2
0
1
5
.
Ph
o
t
o
7
–
P
h
o
t
o
o
f
t
a
i
l
i
n
g
s
/
m
i
n
e
a
r
e
a
t
a
k
e
n
i
n
2
0
1
3
.
P
h
o
t
o
8
–
P
h
o
t
o
o
f
s
a
m
e
m
i
n
e
a
r
e
a
t
a
k
e
n
i
n
2
0
1
5
.