HomeMy WebLinkAboutMcGowan_UnusualCircumstances_08062015Offices of Agricultural Commissioner Richard B. Price, Agricultural Commissioner
Weights and Measures Navid A. Khan, Asst. Agricultural Commissioner
316 Nelson Avenue I T: 530,538.7381 buttecounty .net /agriculturalcommissioner
Oroville, California 95965 F: 530.538.7594
Butte County requires a 300 foot buffer between residential development and neighboring agricultural. The
Agricultural Commissioner may identify unusual circumstances where the 300 foot buffer cannot be met on
existing parcels. This exception is not available for lots being created, divided or subdivided.
Owner or Authorized Agent must complete the following and return with the required site plan to:
Development Services Department, 7 County Center Drive, Oroville, CA (530) 538 -7601
Name: Qrr. % -AreA Ij1rlrrZmA,>0n &AVK55&UJZV�
Mailing Address:
Phone: 4o 2 q-3 L & S P?
b ?_4" 1. -1. P,_
Email: LL It 5 'S Nl>`!` . t�W h �' iA . °�svt-l-S
Assessor's Parcel Number: O LC 1 - L go - CZ 1
Reason for the unusual circumstances exception:
Buildiniz location is restricted bv desi natcd Flood plain running south west to northeast and casement between
parcels on the east bounda U. Proposed location has preexisting infrastructure. Proposed building sit provide
lest amount of impact to Aiz resource and is best possible location to preserve continuity of the
orchard.
Owner or Authorized Agent's signature
Date
UNUSUAL CIRCUMSTANCES DEFINITION:
An exceptional or extraordinary condition where the existing lot size or shape or an existing improvement
(well, septic systems, structures etc.) does not allow for the standard condition of a 300 -foot buffer zone.
An attached site plan annotated with proposed building locations, infrastructure, dimensions and setbacks
is required.
................................................................................................................. ...............................
Internal Dept. Contact Info:
❑ Env. Health Planning ❑ Building IXOther CV-4 r►
Contact Person: _ w=�o �> +J Lk Phone:. S 3 g Z 3 %
................................................................................................................. ...............................
For Agricultural Commissioner office use only: (to be completed after submittal)
DISCRETIONARY PERMITS (Planning) MINISTERIAL PERMITS (Building)
❑ Exception Recommended s- Exception Granted with the
❑ Exception NOT Recommended following conditions:
Reason /Conditions /Specific setbacks from adjacent agricultural operations:
Place building in defined area as annotated on attached plan. Standard building setbacks from the north and
Agricultural Department Signature: _LA (�..� -.�
Date: -7I23I L P Deputy ASC wd&*w
JUL 2 4 M5
BUTTE COUNTY
AGRICULTURE
Butte County Department of Agriculture
Request for Services: PLANNING / BUILDING PROJECT REVIEW
Effective August 24, 2004, Butte County code section 3 -61, k, 4, address the fee schedule for
agricultural related planning project review:
"All planning applications that are referred to the Agricultural Commissioner for review or when
an individual or business requests review by the Agricultural Commissioner will be charged at an
hourly rate of ninety -six dollars and twenty cents ($ 96.25) per hour. Any additional or
subsequent review of planning matters by the Agricultural Commissioner shall also be charged at
this same rate."
Name: _r WCh C-A mc- G�Owan Phone No.:
Business name (if applicable);
GZ_L1 �,k6a( u�)
Address: LASS Nord t4WH city & St.: d4n,-Mp CA zip: 4ZVq ?3
Name or Scope of planning project (include any documents or maps to facilitate review):
APN number: it) t4 7 ^L,2 0 --159:.
Consultation regarding the results of the review and any related documents will be provided by
prior arrangement or appointment. The charge(s) for project review and mileage will be due at
time of service or may be billed if approved by the Agricultural Department. The totals are as
follows:
'2" Hr's labor @ $96.25/hr
Mileage @ .55 /mi
$ 45D
Total Charges $ 112. 5d
I agree to pay the Butte County Department of Agriculture for Planning /Building services provided
in accordance with the Butte Cou y Fee Ordinance. c —
Signature: x Date:
JUL 2 4 2015
BUTTE COUNTY
AGRICULTURE
�1
M
b
rL
JUL 2 4 2015
BUTTE COUNTY
AGRICULTURE
� I - -, � . I I I - : -�, �. z . - i: