Loading...
HomeMy WebLinkAboutMISC17-0008 Minute Order 042517 - 4.05 and ConditionsMISC17-0009 – Table Mountain Quarry Request for Temporary Extension of Hours Page 1 of 1 Conditions of Approval CONDITIONS Table Mountain Quarry Temporary Extension of Hours for the State Route 191 Curve Straightening Project, File # MISC17-0008: A request by Vulcan Materials Company to temporarily extend the hours related to truck loading and hauling at the Table Mountain Quarry to provide aggregate materials during the construction of the State Route 191 Curve Straightening Project. The Table Mountain Quarry is subject to the requirements of Condition No. 1 of Mining Permit MIN10-0001 (Amendment to Mining Permit MIN 04-01 Condition 7 and Use Permit UP 96-02 Condition 11) which specifies that, "Plant production, maintenance and road hauling shall be limited to 5:00 a.m. to 9:00 p.m.; onsite rail car loading may be done on demand." Condition No. 1 of MRP10-0001 also provides that, "Upon Board of Supervisors’ approval, the hours of operation may be modified in the event of an emergency or natural disaster, or when the public health, safety and welfare require the products of the operation." Vulcan Materials Company requesting is to extend the hours allowing truck loading and hauling on a 24-hour basis from May 1, 2017 through June 19, 2017. CONDITIONS OF APPROVAL: 1. Truck traffic shall be restricted to the use of Table Mountain Road north from the main Mine driveway that exits onto Table Mountain Road to the intersection of Table Mountain Road at the Hwy 70/SR191 intersection. 2. No Truck Traffic is to use Coal Canyon Road. 3. The operator shall photograph/video the existing conditions of Table Mountain Road prior to commencement of the proposed heavy truck traffic and supply those images to the Butte County Public Works Department. At the conclusion of the trucking operation the County and Operator shall inspect Table Mountain Road and compare the pre work photos to the conditions post trucking and the Operator shall make any necessary repairs to damage caused by the work. All repairs will be done in coordination with the Butte County Public Works Department and under an Encroachment permit. 4. The Operator shall take measures to ensure that any material from the trucking operations that may come off the trucks onto Table Mountain Road is removed on, at minimum, a daily basis and more often as may be deemed necessary by the Butte County Public Works Department. APPLICANT ACCEPTANCE AND ACKNOWLEDGEMENT OF CONDITIONS OF APPROVAL: I have read the foregoing Description of Approved Use and Conditions of Approval which were imposed upon the granting of this request for temporary extension of hours (MISC17- 0008/Vulcan Materials Company), and I agree to fully abide by said items. Dated: __________________ __________________________________ Applicant