HomeMy WebLinkAboutMUP 16-0003 PW Conditions of Approval
BUTTE COUNTY
STANDARD PUBLIC WORKS CONDITIONS FOR
USE PERMITS OR MINOR USE PERMITS
APPLICANT: North Valley Building Systems DATE: April 13 , 2015
AGENT: John Goddard APN: 006-400-059
FILE#: MUP 16-0003 PLANNER: Tristan Weems
PROJECT DESCRIPTION: 16’-31’ Coffee Drive Thru
Those items checked are conditions of approval.
PLEASE CONTACT THE PUBLIC WORKS DEPARTMENT FOR COMPLIANCE WITH THE
FOLLOWING CHECKED CONDITIONS
A. STREETS
1. Obtain encroachment permit for all new or existing driveway approaches or frontage improvements and
construct them to County standards, as specified in County Improvement Standards.
2. Deed to Butte County, in fee simple, 30 feet of right-of-way from the centerline of Nord Avenue. The right of
way shall be sufficient for the installation of standard RS-3B half width section.
3. Construct ½ street section on Nord Avenue to RS-3B geometric standard. Minimum structural section to be
3” AC and 12”AB, SC 250 prime, fog seal and 95 % relative compaction. Submit design to Land Development
Division for approval. “R” value determination and other data may be required to support the section design.
B. DRAINAGE
X 1. Prior to issuance of Building Permits a plan for a permanent solution for drainage shall be submitted to and
approved by the Department of Public Works. The drainage plans shall specify how drainage waters shall be
detained on site and or conveyed to the nearest natural or publicly maintained drainage channel or facility and
shall provide that there shall be no increase in the peak flow runoff to said channel or facility.
___ 2. Establish 100 year floodplain elevations and the lowest floor elevations for any structures. Show on the
additional map sheet the elevations (by contours) and the location of an accepted NVGD benchmark and a
temporary benchmark on-site.
X 3. Pay the applicable drainage fees in effect at the time of issuance of Building Permits for the
Chico Urban Area
X 4. A Construction Storm Water Permit will be required by the State Water Resources Control Board if the project
results in a disturbance (including clearing, excavation, filling, and grading) of one or more acres. Construction
activities that result in a land disturbance of less than one acre, but which are part of a larger common plan of
development, also require a permit. The Permit must be obtained from the State Water Resources Control
Board prior to construction.
C. General
X 1. Pay the applicable County Wide Transportation Impact Fee and North Chico Road and Bridge Impact Fee in
effect at the time of issuance of Building Permits.
X 2. Install Pavement Marking as depicted on the Minor Use Permit Site Plan to prevent traffic congestion at the
entrance to the North bound service drive isle. Striping will be included on the Site Improvement Plans to be
approved by Public Works prior to commencement of the site work.