Loading...
HomeMy WebLinkAboutMUP 5-0002 PW Conditions of Approval BUTTE COUNTY STANDARD PUBLIC WORKS CONDITIONS FOR USE PERMITS OR MINOR USE PERMITS APPLICANT: John Goddard, The Palms Event Center DATE: August 26, 2015 AGENT: John Goddard APN: 042-050-074 FILE#: MUP 15-0002 PLANNER: Rowland Hickel PROJECT DESCRIPTION: Permit the Existing Event Center use on the site Those items checked are conditions of approval. PLEASE CONTACT THE PUBLIC WORKS DEPARTMENT FOR COMPLIANCE WITH THE FOLLOWING CHECKED CONDITIONS A. STREETS X 1. Obtain encroachment permit for all new or existing driveway approaches or frontage improvements and construct them to County standards, as specified in County Improvement Standards. X 2. Deed to Butte County, in fee simple, 30 feet of right-of-way from the centerline of Nord Avenue. The right of way shall be sufficient for the installation of standard RS-3B half width section. X 3. Construct ½ street section on Nord Avenue to RS-3B geometric standard. Minimum structural section to be 3” AC and 12”AB, SC 250 prime, fog seal and 95 % relative compaction. Submit design to Land Development Division for approval. “R” value determination and other data may be required to support the section design. ___ 4. Construct ________________________ street section on ___________________ __ to RS- __ road standard with ____ curb, gutter, and sidewalk and ____” AC, and AB, SC 250 prime, fog seal and 95 % relative compaction. Construct _______________________ street section on _____________________ to RS- __ road standard with ____ curb, gutter, and sidewalk and ____” AC, and AB, SC 250 prime, fog seal and 95 % relative compaction. Submit design to Land Development Division for approval. “R” value determination and other data may be required to support the section design. B. DRAINAGE X 1. Prior to issuance of Building Permits a plan for a permanent solution for drainage shall be submitted to and approved by the Department of Public Works. The drainage plans shall specify how drainage waters shall be detained on site and or conveyed to the nearest natural or publicly maintained drainage channel or facility and shall provide that there shall be no increase in the peak flow runoff to said channel or facility. ___ 2. Establish 100 year floodplain elevations and the lowest floor elevations for any structures. Show on the additional map sheet the elevations (by contours) and the location of an accepted NVGD benchmark and a temporary benchmark on-site. 3. Pay the applicable drainage fees in effect at the time of issuance of Building Permits for the . (The current fee is now $ /acre.) X 4. A Construction Storm Water Permit will be required by the State Water Resources Control Board if the project results in a disturbance (including clearing, excavation, filling, and grading) of one or more acres. Construction activities that result in a land disturbance of less than one acre, but which are part of a larger common plan of development, also require a permit. The Permit must be obtained from the State Water Resources Control Board prior to construction. C. General X 1. Pay the applicable County Wide Transportation Impact Fee in effect at the time of issuance of Building Permits.