Loading...
HomeMy WebLinkAboutMUP15-0003 PW COA'S BUTTE COUNTY STANDARD CONDITIONS FOR USE PERMIT APPLICANT: Verizon Wireless DATE: 4/23/15 AGENT: APN: 060-080-010 FILE #: MUP15-0003 PLANNER: PROJECT DESCRIPTION: Those items checked are conditions of approval. PLEASE CONTACT THE PUBLIC WORKS DEPARTMENT FOR COMPLIANCE WITH THE FOLLOWING CHECKED CONDITIONS: A. STREETS 1. Prior to establishing use, obtain an encroachment permit and improve all new and existing driveway approaches to publicly maintained roads as specified in the county improvement standards and the terms of the encroachment permit. Prior to constructing facilities into, under, over, above, or upon any public street in the unincorporated area of the county, obtain a utility permit from the Butte County Public Works Department. Submittal of improvement plans for review and approval by the Public Works Department may be required depending on the facilities proposed. 2. Prior to establishing use, repair/restore private access road to like-kind condition that existed prior to construction of communication facilities. 3. Prior to establishing use, deed to Butte County in fee simple 30 feet of right-of-way from each side of the physical centerline (60 feet total width) of Humboldt Road along the entire property frontage. 4. Prior to establishing use, submit road and drainage improvement plans to the Land Development Division for construction of street frontage improvements on . Improve parcel frontage to a ½+ 12’ / full street section on to an RS- county improvement standard including curb, gutter and sidewalk for parcels with gross acreage of one acre or less. Construct or provide a performance bond and labor and material bond for the construction of the required improvements prior to establishing use. 5. Prior to establishing use, relinquish abutter's rights of access to Butte County along the frontage of parcels , except at approved access points. 6. Access to the proposed use is limited to California legal trucks as defined by the California Department of Transportation. If Surface Transportation Assistance Act (STAA) truck access is proposed by the applicant either currently or in the future, comply with STAA route requirements for large truck turning movements. Prior to establishing STAA truck use, improve intersections and street curves from proposed use to an existing route designated for STAA truck use. Submit road and drainage plans to the Department of Public Works for plan checking and approval prior to construction. Obtain an encroachment permit and construct the improvements in accordance with the approved plans. 7. Prior to establishing use, pay North Chico Specific Plan Area development impact fees per Article XVII, Chapter 3 of Butte County Code. B. DRAINAGE 1. Prior to establishing use, a plan for a permanent solution for drainage shall be submitted to and approved by the Department of Public Works. The drainage plans shall detail existing drainage conditions and shall specify how drainage waters shall be detained or retained onsite and/ or conveyed to the nearest natural or publicly maintained drainage channel or facility and shall provide that there shall be no increase in the peak flow runoff to said channel or facility. 2. Prior to establishing use, establish 100 year flood plain elevations and the lowest floor elevations for any structures, in accordance with Butte County Code §26-22. Show on the additional map sheet the elevations (by contours) and the location of an accepted NAVD 88 benchmark and a temporary benchmark on-site. 3. Prior to establishing use, pay drainage impact fees per Article XI, Chapter 3 of Butte County Code. 4. If grading for the project results in a disturbance (including clearing, excavation, filling, and grading) of one or more acres, a construction storm water permit will be required by the State Water Resources Control Board. The permit must be obtained from the State Water Resources Control Board prior to construction. If a construction storm water permit is required, a note is to be placed on the site improvement plans that states: “The development of this project required a construction storm water permit”. In addition the WDID number issued by the State shall also be placed on the site improvement plans. Construction activities that result in a land disturbance of less than one acre, but which are part of a larger common plan of development, also require a construction storm water permit. C. LEGAL LOT STATUS 1. Prior to the issuance of the use permit, prove to the satisfaction of the public works director that the parcel of the subject application is a legal parcel.