Loading...
HomeMy WebLinkAboutRFI16-0222 Wes Curry Letter Department of Development Services Tim Snellings, Director Pete Calarco, Assistant Director 7 County Center Drive T: 530.538.7601 Oroville, California 95965 F: 530.538.7785 buttecounty.net/dds June 24, 2016 Wes Curry 1276 Norma Street Oroville, CA 95965 RE: Grading Permit/CEQA, Minor Use Permit Dear Mr. Curry, It was a pleasure speaking with you yesterday morning. I would like to follow-up on our conversation with this letter outlining the fees and projects required to move your building permits forward. As discussed, the Department of Public Works imposed a Grading Permit requirement for your property located at APN: 027-060-075, or 7062 Springtime Trail. The development you propose has two primary Planning Division (Department of Development Services) areas of concern. One issue relates to the Oak Tree Mitigation map note (as discussed) and the other comes from BCC Section 24-76, Riparian Areas, and a 50 foot development buffer from any established waterways (blue line streams on topo maps). To remedy these issues, a Minor Use and Grading Permit must be filed through the County – this can be done by your engineer at NorthStar Engineering. The Public Works fee for the Grading Permit is $700.00. Since it will require California Environmental Quality Act review (CEQA) $5,301.98 will be initially due to the Planning Division and includes both the CEQA portion of the Grading Permit and the Minor Use Permit. The Planning Division Grading Permit fee is a base retainer (more time can be billed, but unused time will be refunded) and the Minor Use Permit cost is a flat fee (the cost will not exceed the initial fee). This amount also includes a $2,210.25 California Fish and Game fee, publishing costs, and Clerk Recorder fees. The Oak Tree Mitigation plan will be evaluated at this point in collaboration with your Registered Professional Forester. The Minor Use Permit, processed concurrently, but applied for separately, will address the Riparian Buffer setback and apparent encroachment (to be verified through the Grading Permit) by the fill dirt into said 50 foot buffer. For your information, or should you have questions on your Grading Permit, Tom Fossum, Deputy Director of Public Works, can be reached at 538-7266 or tfossum@buttecounty.net. If you have any questions on the Minor Use Permit application please do not hesitate to contact me. Again, the Minor Use Permit will be processed concurrently with the Grading Permit. It, CEQA, and Minor Use Permit can be processed and completed between approximately 3-6 months, depending on complexity. Let me know if you have any questions. Sincerely, Tristan Weems Assistant Planner 530.538.2953 tweems@buttecounty.net Encl. Minor Use Permit Application, Article 16 Riparian Areas, Grading Permit Application