Loading...
HomeMy WebLinkAboutUP09-0003_Use Permit_UnsignedEXHIBIT A USE PERMIT BUTTE COUNTY PLANNING COMMISSION DATE: (Certified Mail Rec.) UP09-0003 PERMIT NO. 030-340-043 and 030-340-035 ASSESSOR’S PARCEL NO. Pursuant to the provisions of the Zoning Ordinance of the County of Butte and the conditions set forth below a Use Permit for an event facility consistent with the Plot Plan is hereby granted. Conditions of Approval: 1. Failure to comply with the conditions specified herein as the basis for approval of application and issuance of Permit constitutes cause for the revocation of said permit in accordance with the procedures set forth in the Butte County Zoning Ordinance, including Butte County Code Sec. 24-45.65 or equivalent or related section if the code is updated or amended. 2. Unless otherwise provided for in a special condition to this Use Permit, all conditions must be completed prior to or concurrently with the establishment of the granted use. The use granted by this permit must be established within two years of the date of approval. 3. Minor changes may be approved administratively by the Directors of Development Services, Environmental Health, or Public Works upon receipt of a substantiated written request by the applicant, or their respective designee. Prior to such approval, verification shall be made by each Department or Division that the modification is consistent with the application, fees paid and environmental determination as conditionally approved. Changes deemed to be major or significant in nature shall require a formal application for amendment. 4. If the Use Permit has not been substantially established within two years of the receipt of the Permit by the Permittee consistent with conditions of approval herein, the Permit shall become null and void and reapplication pursuant to Butte County Code Section 24-45 (or equivalent or related section if the code is updated or amended) shall be required to establish the use previously granted under the expired Permit unless, 30 days prior to the expiration date, a request for a one year extension is submitted to the Planning Commission together with sufficient evidence that the time limits for processing development permits under federal or state regulations require time limits which exceed one year. Upon application, and for good cause by the Permittee, at a public hearing pursuant to Section 24-45.25 (or equivalent or related section if the code is updated or amended) above, the Planning Commission may extend any time limitation previously made a part of any condition to a Use Permit. UP09-0003(SMITH) Conditions of Approval Approval Date:_________ Page 1 of 5 5. The terms and conditions of this Permit shall run with the land and shall be binding upon and be to the benefit of the heirs, legal representatives, successors, and assigns of the Permittee. 6. Neither the applicant, nor any agent nor representative of the applicant shall intentionally omit or misrepresent any material fact in connection with the application. Any alleged material misrepresentation shall constitute grounds for the Director of Development Services to commence a revocation hearing, and, if proven to exist, shall constitute sufficient grounds to revoke a Permit. 7. The Butte County Planning Commission hereby reserves ongoing jurisdiction over this Use Permit. The Commission may, at its own discretion, and following a noticed public hearing, revoke this Use Permit, and/or add additional conditions of approval, or modify existing conditions of approval, upon receipt of written complaints or other evidence of adverse impacts upon surrounding properties or the public health, safety or welfare. Planning Division 8. Mitigation Measure 1: All lighting for the project shall be designed and located so as to confine direct lighting to the premises. A light source shall not shine upon or illuminate directly on any surface other than the area required to be lighted. No lighting shall be of the type or in a location such that it constitutes a hazard to vehicular traffic, either on private property or the abutting highway or street. Plan Requirements: This mitigation shall be placed as a condition of the Use Permit. Timing: The provisions of this mitigation measure shall be complied with at all times. Monitoring: The Development Services Department shall investigate and respond to any complaints of excess glare or light originating from the project site. 9. Mitigation Measure 2: Dust generated by the vehicle use of unpaved roads and areas shall be kept to a minimum and retained on-site. Dust control, through watering, dust palliative, limiting vehicle speed, other means or combination thereof shall be required to reduce fugitive dust from vehicle use of the gravel and other unpaved surfaces. Plan Requirements: The note shall be placed as a condition of the Use Permit. Timing: Requirements of the condition shall be adhered to throughout all grading, construction/landscaping and event activity periods. Monitoring: The Department of Development Services shall spot check and shall ensure compliance on-site for construction related activities subject to a building permit. Butte County Air Pollution Control District inspectors shall respond to nuisance complaints. 10. Mitigation Measure 3: Acceptable levels of noise generated from the project shall not exceed 60 decibels Ldn or CNEL, as established by the Butte County General Plan, at the nearest dwelling. If the Department of Development Services (DDS) or other County departments receive noise- UP09-0003(SMITH) Conditions of Approval Approval Date:_________ Page 2 of 5 related complaints regarding the project and the level of noise is in excess of the established standards, the applicant/owner shall immediately implement all measures recommended by DDS to abate the nuisance. The owner/applicant shall reduce noise levels as directed, which may include, but are not limited to: a. Changing the operational hours and/or placing limits on amplified sound/music; b. Reducing the number of individuals allowed at each event; c. Installing sound-buffering structures; d. Work with a sound specialist to identify and implement appropriate sound reducing measures; or e. Other recommendations from the DDS. Any violations of the above established noise standards constitute violations of the applicant’s Use Permit and shall subject the applicant to the administrative revocation and/or criminal enforcement actions under Butte County Code section 24-45.65 or equivalent or related section if the code is updated or amended. Plan Requirements: This mitigation shall be placed as a condition of the Use Permit. Timing: The applicant shall implement measures to reduce noise impacts as required by the Department of Development Services as a result of complaints during the operational phase of the project. Monitoring: The Planning Division and/or Code Enforcement shall respond to noise complaints. 11. Hours of operation from 10AM to 10PM with a maximum of 200 guests on one of the three days of any of the 12 events from April through October, annually. The other two days shall be limited to 50 guests per day. The operator has a reasonable amount of time, generally one hour after close of the event, for the orderly and controlled exit of guests. 12. All vehicles shall be parked in designated on-site parking areas. Parking and related vehicle circulation shall be managed by event staff. 13. Prior to issuance of any permit on the project site, pay any outstanding project-related processing fees. 14. The applicant shall comply with all other applicable State and local statues and regulations. 15. The use permitted onsite is limited to the project description as described in the project application, the approved Plot Plan and as further conditioned in these Conditions of Approval. A project description summary is provided on the last page of these Conditions of Approval. 16. The applicant/owner shall maintain an event management plan that includes but is not limited to the Conditions of Approval, approved Plot Plan, management of parking and circulation and other operational aspects. The event management plan shall be available for inspection and modified as necessary to comply with the Conditions of Approval. UP09-0003(SMITH) Conditions of Approval Approval Date:_________ Page 3 of 5 Public Works 17. Prior to establishing use, obtain an encroachment permit and construct a standard S-18B road approach at the intersection of Farrar Lane and Larkin Road in accordance with county improvement standards. 18. Improve Farrar Lane from Larkin Road to proposed parking areas to an RS-8 LD-II county improvement standard. Construct the required improvements prior to establishing use. 19. A portion of the property is in a FEMA designated flood plain. Pursuant to Article IV, Chapter 26 of Butte County Code, no development as defined in county code, including construction of any building or other structure, filling, grading, paving, excavation, or agricultural practice shall be initiated within the flood plain without first obtaining the appropriate county permits. Cal Fire/Butte County Fire 20. Maintain an all weather access of at least 10 feet wide and vertical clearance of 15 feet that will allow for ingress and egress and accommodate a 40,000-pound fire apparatus to within 150 feet of any point on all structures. 21. Maintain Fire Access to and including the “VIP Parking Area” so as to facilitate emergency response to event grounds beyond structures. 22. Building identification and/or addresses shall be installed in conformance with Public Resources Code 4290 and shall be posted prior to establishing the use maintained continuously thereafter. Environmental Health Division 23. Prior to construction of the proposed guest parking locate and relocate as required, under permit from environmental health, any leach field that will be under the parking area. 24. Prior to issuance of the building permit clearance for the permanent outdoor toilet facilities a permit to construct the sewage disposal system will be required from environmental health. County Counsel 25. If this entire matter or any finding, action or condition of this matter is appealed to the Board of Supervisors, the applicant or any other developer/operator other than the applicant agrees to indemnify the County of Butte from liability or loss related to the approval of this project and agrees to sign an indemnification agreement in a form approved by County Counsel before the Board's appeal hearing. If the application is not appealed, this condition is deemed satisfied. UP09-0003(SMITH) Conditions of Approval Approval Date:_________ Page 4 of 5 Use Permit 09-0003 Project Description Summary: The application is a request of for a use permit to conduct outdoor event facility uses such as ceremonies and receptions including amplified music on property located at 1446 Farrar Lane, Assessor’s Parcel numbers 030-340-043 and 030-340-035. The application proposes 12 events per year from April through October. An event can include activities on up to three consecutive days, one of those days being the main event of up to 200 people. The application also includes a small winery facility to be complimentary to the events facility. Food and beverages will be brought on site by vendor or other agreement with the owner. Portable restroom facilities will be provided during the events. A future phase may include permanent bathroom facilities. The proposal includes an unlighted sign at the Larkin/Farrar entrance, accessory structures, circulation and related signage. I hereby declare under penalty of perjury I have read the foregoing conditions, they are in fact the conditions which were imposed upon the granting of this use permit, and that I agree to abide fully by said conditions. Dated: _______________ ________________________________________________ Applicant NOTE: Issuance of this Use Permit does not waive requirements of obtaining Building and Health Department permits before starting construction, nor does it waive any other requirements. ________________________________________________ Chair, Butte County Planning Commission CC: Land Development Division Building Division Environmental Health Division Butte County Fire Department/Cal Fire Butte County Assessor’s Office Butte County Air Quality Management District UP09-0003(SMITH) Conditions of Approval Approval Date:_________ Page 5 of 5